Off-plan projects in Dubai, UAE
1154 off-plan projects tracked in Dubai: 98% show a permit, 90% deposit protection, 12 not completed and past the published handover date. Updated 25 Nov 2026.
For each project: buyer checks published, then confirmed, of 6; a dash means not yet reviewed by Kolaboro.
- Beach Walk Residences 4 by Imtiaz 6/6, 4/6
- Cove Grand by Imtiaz 6/6, 4/6
- The Symphony by Imtiaz 5/6, 4/6
- Eltiera Views 5/6, 4/6
- The Meriva Collection (Meriva Gardens / Meriva Signature) 5/6, 4/6
- Sobha Solis 6/6, 4/6
- The Brooks at Sobha Sanctuary 6/6, 4/6
- Skyscape (Sobha Hartland II) 5/6, 4/6
- Golf Vale 6/6, 4/6
- Valia 6/6, 4/6
- Binghatti Skyflame 1 6/6, 4/6
- Binghatti Vintage 6/6, 4/6
- Bayz 101 by Danube 5/6, 4/6
- Address Residences Dubai Creek Harbour 6/6, 4/6
- Club Drive 6/6, 4/6
- Rosehill 6/6, 4/6
- Montiva by Vida 6/6, 4/6
- Seapoint Residences 5/6, 4/6
- City Walk Crestlane 6/6, 4/6
- Volta Tower 6/6, 4/6
- Aykon City 3 6/6, 4/6
- Kanyon by Beyond 5/6, 3/6
- Akala Hotels & Residences 6/6, 4/6
- The Residences at Zabeel 3/6, 0/6
- Vincitore Aqua Flora 6/6, 4/6
- Samana Ocean Crest 6/6, 4/6
- Samana Sky Views 6/6, 4/6
- Palm Jebel Ali - Frond A Villas 6/6, 4/6
- Azizi Venice 14 6/6, 4/6
- Viewz 2 by Danube 5/6, 4/6
- Sea Cliff by Imtiaz 6/6, 3/6
- Ellington Sands I 6/6, 4/6
- Golf Dale 6/6, 4/6
- Sky Gate Tower 5/6, 4/6
- Altan 6/6, 4/6
- Nad Al Sheba Gardens Phase 7 6/6, 4/6
- The Hillgate 6/6, 3/6
- Oak Yard 5/6, 3/6
- Forest City 2 5/6, 3/6
- Takaya 6/6, 3/6
- Keturah Reserve 6/6, 3/6
- Mar Casa 6/6, 3/6
- Rove Home Dubai Marina 5/6, 2/6
- Bluewaters Bay 6/6, 3/6
- Reportage Hills (R. Hills) 6/6, 4/6
- Kensington Gardens (Greenwood) 6/6, 3/6
- Artistry One Residences 6/6, 4/6
- Expo Valley (villas and townhouses) 5/6, 2/6
- Nirvana Residences I 4/6, 4/6
- Azizi Grand 6/6, 3/6
- Shahrukhz Residences by Danube 6/6, 4/6
- Rise by Blanco Thornton 2/6, 0/6
- Rixos Bay Residences, Dubai Islands 6/6, 3/6
- Nine Collective 5/6, 3/6
- ORLA, Dorchester Collection 6/6, 3/6
- ELAR1S Sky (Elaris Sky) 6/6, 4/6
- Karl Lagerfeld Villas by Taraf 5/6, 2/6
- Armani Beach Residences at Palm Jumeirah 6/6, 3/6
- Arancia Yards by Beyond 5/6, 4/6
- Cello Residences 4/6, 3/6
- Creek Waters 2 6/6, 4/6
- Windsor House 5/6, 4/6
- Samana Imperial Garden 6/6, 4/6
- Bay Grove Residences 6/6, 4/6
- DWTN Residences (registered as Downtown Residences) 6/6, 4/6
- Sola Residences 6/6, 4/6
- Hayat 4 (Hayat by Dubai South, Phase 4) 6/6, 4/6
- Binghatti Circle 6/6, 4/6
- Sparklz by Danube 6/6, 4/6
- Naya at District One 6/6, 4/6
- Pearl House 4 by Imtiaz 5/6, 4/6
- Binghatti Etherea 5/6, 3/6
- Binghatti Flare 5/6, 3/6
- Binghatti Aquarise 4/6, 3/6
- Binghatti SkyTerraces 5/6, 3/6
- Samana Barari Twin Towers 2/6, 0/6
- Samana Boulevard Heights 4/6, 3/6
- Samana Downtown One 1/6, 0/6
- Wynwood Horizon 5/6, 3/6
- DAMAC Bay by Cavalli 4/6, 3/6
- Lagoon Views (DAMAC Lagoons) 4/6, 3/6
- DAMAC Riverside Views 3/6, 2/6
- Chelsea Residences by DAMAC 4/6, 3/6
- Vela Viento 4/6, 3/6
- Anwa Aria 1/6, 0/6
- Six Senses Residences Dubai Marina 5/6, 3/6
- Samana Greenfield 5/6, 3/6
- Samana Rome 5/6, 3/6
- Samana Hills South 5/6, 3/6
- The Archive by Imtiaz 1/6, 0/6
- Cove Edition 6 5/6, 3/6
- One River Point 4/6, 3/6
- Binghatti Wraith 5/6, 3/6
- Binghatti Cullinan 5/6, 3/6
- Binghatti Luxuria 5/6, 3/6
- Binghatti Hillcrest 5/6, 3/6
- Binghatti Starfall 5/6, 3/6
- Aspirz 4/6, 3/6
- Breez by Danube 4/6, 3/6
- Timez by Danube 4/6, 3/6
- Route 66 4/6, 3/6
- The Promise Villas 4/6, 3/6
- Maison Margiela Residences 4/6, 3/6
- White Opals 4/6, 3/6
- La Crystal 4/6, 3/6
- Beachfront Gates 1 3/6, 2/6
- 18 Marlow Row 3/6, 2/6
- Al Warsan Star 3/6, 2/6
- Lumo 3/6, 2/6
- Amaya Residences 3/6, 2/6
- Greenz by Danube 5/6, 3/6
- 24HC 3/6, 2/6
- Marwa Views 3/6, 2/6
- RR Grand 3/6, 2/6
- The Mansions by Mag 3/6, 2/6
- Terva Homes 3/6, 2/6
- Grosvenor House 3/6, 2/6
- Nejm 1 3/6, 2/6
- Valore 3/6, 2/6
- Elevia Residences III 3/6, 2/6
- Al Ghaf 2 3/6, 2/6
- Burj Binghatti Jacob & Co Residences 4/6, 3/6
- Flora Bay 3/6, 2/6
- Vertex Pointe 3/6, 2/6
- Zazen Acacia Residences 3/6, 2/6
- Sea Mirror Residences 3/6, 2/6
- Ajwan Residences 3/6, 2/6
- Mada'in 3/6, 2/6
- Renascent Tower 3/6, 2/6
- AT 85 Residences 3/6, 2/6
- Oleander Residences by Yoo 3/6, 2/6
- Siana 3/6, 2/6
- Sobha Central 4/6, 3/6
- Vista Hub by DSI Prestige One 3/6, 2/6
- Calisi 3/6, 2/6
- Tessera 3/6, 2/6
- Le Chateau Pietrus 3/6, 2/6
- Sol Terra Casa II 3/6, 2/6
- Aark Terraces 3/6, 2/6
- Casa Altia 3/6, 2/6
- Holm Central 3/6, 2/6
- The Winslow 3/6, 2/6
- Capital One by Centurion 3/6, 2/6
- DAMAC Islands 3/6, 2/6
- Lincoln Star Residence III 3/6, 2/6
- Globna by Crystal Bay Azure 3/6, 2/6
- Al Ghaf Janoub 3/6, 2/6
- Fala by Kasco 3/6, 2/6
- Treppan Living Prive 3/6, 2/6
- Haus 99 Residences 3/6, 2/6
- Chapter 02 3/6, 2/6
- Loriza by Zoya 3/6, 2/6
- Chavelle by Imtiaz 3/6, 2/6
- DAMAC Riverlink 3/6, 2/6
- Grand Polo Club & Resort 1/6, 0/6
- Elvora by Zoya 3/6, 2/6
- Zura Residences 3/6, 2/6
- Legacy Heights 3/6, 2/6
- Oakmont 3/6, 2/6
- Tura Residence 3/6, 2/6
- Sol Terra Gardens 3/6, 2/6
- Beachfront Gates 3 3/6, 2/6
- Treppan Vision 3/6, 2/6
- The Vault by Imtiaz 3/6, 2/6
- Izzzi.Life Lime 3/6, 2/6
- Mercer House 4/6, 3/6
- Confident Preston 3/6, 2/6
- Melograno Yards by Beyond 3/6, 2/6
- Soyo by Zimaya 3/6, 2/6
- Zen Lagoons 3/6, 2/6
- Taormina Village 2 3/6, 2/6
- Lenjawi Diamond 3/6, 2/6
- Nad Al Sheba Gardens Phase 12 3/6, 2/6
- Native Haus 3/6, 2/6
- Wedyan 3/6, 2/6
- Marquis Aura 3/6, 2/6
- Portside Square 4/6, 3/6
- The Bay Interiors by Missoni 3/6, 2/6
- The Yards Plaza by Beyond 3/6, 2/6
- Expo Valley Views 2 3/6, 2/6
- Boulevard Living 1 3/6, 2/6
- Boulevard Living 2 3/6, 2/6
- Lyra 3/6, 2/6
- Aris by Grid 3/6, 2/6
- Latitude 25 3/6, 2/6
- Portside 2 by Samana Developers 3/6, 2/6
- Valoria the Oasis 3/6, 2/6
- Raw District 3/6, 2/6
- Cetara 3/6, 2/6
- DAMAC Hills - Lilac 3/6, 2/6
- Sorrento 3/6, 2/6
- The Valley - Alva 3 3/6, 2/6
- The Valley - Alva 2 3/6, 2/6
- Sunrise Valley 3/6, 2/6
- Expo Valley Views 1 3/6, 2/6
- Yigo Luxe 3/6, 2/6
- Solaya 8-9 3/6, 2/6
- Christian A. Rockefeller Tower 3/6, 2/6
- Kore by Imtiaz 1/6, 0/6
- Faro 2 the Heights 3/6, 2/6
- Faro the Heights 3/6, 2/6
- Sawa Residences 3/6, 2/6
- Fior 2 3/6, 2/6
- Palm Central Private Residences - Frond D 3/6, 2/6
- Rancho One & Aliso One at Palm Springs 2/6, 1/6
- Rancho Two & Aliso Two at Palm Springs 2/6, 1/6
- Amali Residences 3/6, 2/6
- Maserati Island by Samana 3/6, 2/6
- Shione 3/6, 2/6
- Le Blanc by Imtiaz 5/6, 3/6
- Zeta 3/6, 2/6
- Berkeley Tower 3/6, 2/6
- One Beverly 4/6, 3/6
- Trinity by Karma 4/6, 3/6
- Binghatti Amberhall 4/6, 3/6
- Beach Oasis 2 4/6, 3/6
- Binghatti Hillside 4/6, 3/6
- Binghatti Moonlight 4/6, 3/6
- Binghatti Ruby 4/6, 3/6
- Adeba Azizi 4/6, 3/6
- Bayz 102 4/6, 3/6
- Eleve by Deyaar 4/6, 3/6
- Azizi Jewel 4/6, 3/6
- Tiger Sky Tower 4/6, 3/6
- Vincitore Aqua Dimore 4/6, 3/6
- Binghatti Twilight 4/6, 3/6
- Enso Jade 4/6, 3/6
- Ryah Living by Alyakka 4/6, 3/6
- Biltmore Sufouh 4/6, 3/6
- Serra 4/6, 3/6
- Azizi Riviera Reve 4/6, 3/6
- Oceanz by Danube 4/6, 3/6
- Urban Life 4/6, 3/6
- Address Residences Zabeel 4/6, 3/6
- Aura Prestige 4/6, 3/6
- 330 Riverside Crescent 4/6, 3/6
- 350 Riverside Crescent 4/6, 3/6
- Mas Barsha Residency 4/6, 3/6
- Sportz by Danube 4/6, 3/6
- UH East by Ellington 4/6, 3/6
- MAG 777 4/6, 3/6
- 360 Riverside Crescent 4/6, 3/6
- Fashionz by Danube 4/6, 3/6
- Nova Tower 4/6, 3/6
- Minati Homes 1 4/6, 3/6
- Palatium Residences 4/6, 3/6
- 340 Riverside Crescent 4/6, 3/6
- UH West by Ellington 4/6, 3/6
- Ghaff Land Residence 4/6, 3/6
- Exotica by Al Marina 4/6, 3/6
- Grove 4/6, 3/6
- 310 Riverside Crescent 4/6, 3/6
- Urban Park Residences 4/6, 3/6
- Diamondz by Danube 4/6, 3/6
- The Fifth Tower 4/6, 3/6
- Maimoon Gardens 4/6, 3/6
- Vincitore Dolce Vita 4/6, 3/6
- Jouri Hills 4/6, 3/6
- Aveline Residences by Citi Developers 4/6, 3/6
- Sky Suites by Peace Homes 4/6, 3/6
- Q Gardens Lofts 2 4/6, 3/6
- Stellar Axis by Ajmal Estate Developers 4/6, 3/6
- Sobha Reserve 4/6, 3/6
- AG Square 4/6, 3/6
- The Watercrest 4/6, 3/6
- Elitz 3 by Danube 4/6, 3/6
- Enso Amber 4/6, 3/6
- Elitz 2 by Danube 4/6, 3/6
- The Highbury 4/6, 3/6
- Bugatti Residences by Binghatti 4/6, 3/6
- Eltiera Heights 4/6, 3/6
- Enre Residence 5/6, 3/6
- Samana Portside 5/6, 3/6
- The Highgrove 4/6, 3/6
- Cove Edition 5 by Imtiaz 5/6, 3/6
- SAMANA Resorts 4/6, 3/6
- SAMANA Ocean Bay 4/6, 3/6
- Cove Boulevard by Imtiaz 4/6, 3/6
- Sunset Bay Grand by Imtiaz 4/6, 3/6
- Beach Walk Grand 2 by Imtiaz 4/6, 3/6
- Beach Walk Grand by Imtiaz 4/6, 3/6
- Sunset Bay by Imtiaz 2/6, 0/6
- SAMANA Ivy Gardens 2 4/6, 3/6
- SAMANA Barari Heights 4/6, 3/6
- SAMANA Hills South 3 4/6, 3/6
- SAMANA Manhattan 2 4/6, 3/6
- SAMANA Lake Views 2 4/6, 3/6
- Trump International Hotel & Tower Dubai 1/6, 0/6
- Da Vinci Tower, Interiors by Pagani 1/6, 0/6
- Sunset Bay 2 by Imtiaz 4/6, 3/6
- Sunset Bay 3 by Imtiaz 4/6, 3/6
- Sunset Bay 4 by Imtiaz 4/6, 3/6
- Sunset Bay 5 by Imtiaz 4/6, 3/6
- Cotier House 2 by Imtiaz 4/6, 3/6
- Beach Walk III by Imtiaz 4/6, 3/6
- SAMANA Barari Lagoons 4/6, 3/6
- SAMANA ParkVille 4/6, 3/6
- Binghatti Skyblade 4/6, 3/6
- Binghatti Skyrise 4/6, 3/6
- Binghatti Hillviews 4/6, 3/6
The first 300 of 1154 are listed here. All 1154 projects in Dubai, ranked for transparency · Search them
All projects in UAE · Atom feed of record changes in Dubai · How to check a project in UAE · Most delayed projects · Official registers · Dubai: this month's story · Transparency ranking: Dubai Islands · Transparency ranking: Dubai
Kolaboro / Countries / UAE / Dubai
Market file
Off-plan market file
Loading the latest data.
On 25 Nov 2026, Kolaboro tracks 1,154 off-plan projects in Dubai. 1,136 (98%) publish a permit or licence number, 1,133 (98%) have a handover date on record and 39 are past that date with no completion on record. Source: Kolaboro open data (named.json), CC BY 4.0.
Dubai at a glance
Handover period over
4%
49 of 1,122 projects with a dated handover, completed ones included
Permit published
99%
1,137 of 1,154 projects publish a permit or registration number
Official register entry
98%
1,133 of 1,154 projects found in an official register
Handover pipeline
1,073
- 202677
- 2027406
- 2028344
- later246
1,073 projects with a handover date still ahead, by year
Sample: 1,154 tracked projects. Data of 25 Nov 2026. A date counts as passed only after the end of the period given (year, half, quarter or month). n37u.json · what each field means
Dubai in numbers, as of 25 Nov 2026: we track 1,154 off-plan projects from 418 developers. 1,136 (98%) publish a permit or licence number and 1,133 (98%) a handover date, most often 2027 (419). Handover dates on record moved later at least once for 8 and have passed without a recorded completion for 39 (overdue report). 882 publish a price; for 165 the page we read is the developer's own site rather than a listing portal. Median transparency score: 78/100. named.json promises.json method
Most searched projects in Dubai
- Binghatti Vintage Binghatti Developers
- Binghatti Skyflame 1 Binghatti Developers
- Cove Grand by Imtiaz Imtiaz Developments
- Valencia (DAMAC Lagoons District) DAMAC Properties
- Eltiera Views Ellington Properties
- Binghatti Skyblade Binghatti Developers
- Binghatti Hillviews Binghatti Developers
- Binghatti Circle Binghatti Developers
- Samana Sky Views Samana Developers
- The Meriva Collection (Meriva Gardens / Meriva Signature) Ellington Properties
- The Symphony by Imtiaz Imtiaz Developments
- Samana Imperial Garden Samana Developers
- Ellington Sands I Ellington Properties
- Windsor House Ellington Properties
- Pearl House 4 by Imtiaz Imtiaz Developments
- Sobha Solis Sobha Realty
- Binghatti Titania Binghatti Developers
- Binghatti Flare Binghatti Developers
- Azizi Venice 14 Azizi Developments
- Binghatti SkyTerraces Binghatti Developers
- Valia Emaar Properties
- Binghatti Aquarise Binghatti Developers
- SAMANA Barari Heights SAMANA Developers
- Cove Boulevard by Imtiaz Imtiaz Developments
- Skyscape (Sobha Hartland II) Sobha Realty
- Binghatti Skyrise Binghatti Developers
- Binghatti Cullinan Binghatti Developers
- Samana Boulevard Heights Samana Developers
- Montiva by Vida Emaar Properties
- The Hillgate Ellington Properties
- Golf Vale Emaar Properties
- Aykon City 3 DAMAC Properties
- Breez by Danube Danube Properties
- Le Blanc by Imtiaz Imtiaz Developments
- Rosehill Emaar Properties
- Beach Walk Grand 2 by Imtiaz Imtiaz Developments
- Samana Greenfield Samana Developers
- Sunset Bay Grand by Imtiaz Imtiaz Developments
- SAMANA Resorts SAMANA Developers
- One by Binghatti Binghatti Developers
- Cove Edition 6 Imtiaz Developments
- Binghatti Hillcrest Binghatti Developers
- Aspirz Danube Properties
- Shahrukhz Residences by Danube Danube Properties Development L.L.C
- DWTN Residences (registered as Downtown Residences) Deyaar Development PJSC
- SAMANA ParkVille SAMANA Developers
- Volta Tower DAMAC Properties
- Binghatti Luxuria Binghatti Developers
- Sobha Central Sobha Realty
- Eltiera Heights Ellington Properties
- Chelsea Residences by DAMAC DAMAC Properties
- SAMANA Hills South 3 SAMANA Developers
- Sparklz by Danube Danube Properties
- Timez by Danube Danube Properties
- Wynwood Horizon Imtiaz Developments
- Enre Residence Imtiaz Developments
- Altan Emaar Properties
- Reportage Hills (R. Hills) Reportage Properties
Buying off-plan abroad by nationality
What changes with your nationality in Dubai, Bali, Phuket and Cyprus, from the official texts.
Facts on record in Dubai
1,154 projects in Dubai have a field-by-field record. For each of the 10 key facts: how many hold it, the share here and the share across all markets.
| Field | Projects holding it | Share here | All markets |
|---|---|---|---|
| Handover date | 1,122 / 1,154 | 97% | 86% |
| Permit or registration number | 1,137 / 1,154 | 99% | 46% |
| Units | 1,034 / 1,154 | 90% | 37% |
| Starting price | 882 / 1,154 | 76% | 75% |
| Developer legal entity | 1,094 / 1,154 | 95% | 60% |
| Escrow or deposit protection | 1,040 / 1,154 | 90% | 35% |
| Construction progress | 1,132 / 1,154 | 98% | 39% |
| Satellite reading (built-up share, first > last) | 7 / 1,154 | 1% | 3% |
| Official register entry | 1,133 / 1,154 | 98% | 41% |
| Court cases on record (developer) | 90 / 1,154 | 8% | 2% |
Where the 8,671 facts held here come from: 7,246 from official registers, 268 from developer sites, 104 from listing portals and other web pages, 1,053 from our own records and satellite readings.
Best documented here
- Aykon City 3 10/10
- Alder at Park Five 9/10
- Arancia Yards by Beyond 9/10
- Aspirz 9/10
- Bayz 101 by Danube 9/10
Thinnest records here
- The Archive by Imtiaz 0/10
- Samana Downtown One 0/10
- Samana Barari Twin Towers 0/10
- Kore by Imtiaz 0/10
- Grand Polo Club & Resort 0/10
Where our records are thin, by market and fieldWhat changed this weekPrintable fact sheetHandover pipeline by yearDelays by market
Dubai by area: permits and register share
Areas with 3 or more projects. Register share is the part of the facts we hold that an official register confirms.
| Area | Projects tracked | With a permit number | Facts from a register | Median fields held |
|---|---|---|---|---|
| Madinat Al Mataar, Dubai | 89 | 100% | 89% | 8 / 10 |
| Jumeirah Village Circle, Dubai | 83 | 100% | 87% | 8 / 10 |
| Palm Deira, Dubai | 82 | 100% | 88% | 8 / 10 |
| Dubai Land Residence Complex, Dubai | 56 | 100% | 87% | 8 / 10 |
| Majan, Dubai | 49 | 100% | 87% | 8 / 10 |
| Jabal Ali First, Dubai | 47 | 100% | 88% | 8 / 10 |
| Business Bay, Dubai | 30 | 100% | 83% | 8 / 10 |
| Dubai Maritime City, Dubai | 27 | 100% | 86% | 8 / 10 |
| Bukadra, Dubai | 23 | 100% | 87% | 8 / 10 |
| Al Satwa, Dubai | 22 | 100% | 88% | 8 / 10 |
| Al Yufrah 1, Dubai | 22 | 100% | 88% | 8 / 10 |
| International City Ph 2 & 3, Dubai | 22 | 100% | 88% | 8 / 10 |
| Dubai Production City, Dubai | 21 | 100% | 84% | 8 / 10 |
| City of Arabia, Dubai | 20 | 100% | 89% | 8 / 10 |
| Nad Al Shiba First, Dubai | 19 | 100% | 89% | 8 / 10 |
| Palm Jabal Ali, Dubai | 19 | 100% | 86% | 7 / 10 |
| Jumeirah Village Triangle, Dubai | 18 | 100% | 89% | 8 / 10 |
| Al Yelayiss 2, Dubai | 17 | 100% | 88% | 8 / 10 |
| Arjan, Dubai | 17 | 100% | 85% | 8 / 10 |
| Dubai Islands, Dubai | 15 | 87% | 52% | 8 / 10 |
Dubai: 396 projects due in the next 12 months
By the handover date on record, with its source and the construction progress we hold. A due date is not a promise that it will be met.
| Project | Handover date | Source | Construction progress |
|---|---|---|---|
| Aura Prestige | 1 Nov 2026 | Official register 25 Nov 2026 | 40.06% Official register |
| Mas Barsha Residency | 21 Nov 2026 | Official register 25 Nov 2026 | 26.34% Official register |
| SAMANA Manhattan 2 | 1 Nov 2026 | Official register 23 Nov 2026 | 21.24% Official register |
| 171 Garden Heights | 31 Dec 2026 | Official register 23 Nov 2026 | 33.66% Official register |
| 18 Marlow Row | 31 Dec 2026 | Official register 25 Nov 2026 | 51.92% Official register |
| Address the Bay | 31 Dec 2026 | Official register 23 Nov 2026 | 70.08% Official register |
| Al Habtoor Tower | 31 Dec 2026 | Official register 22 Nov 2026 | 90.01% Official register |
| Al Haseen Residence | 30 Dec 2026 | Official register 22 Nov 2026 | 11.76% Official register |
| Baccarat Hotel and Residences, Dubai | 29 Dec 2026 | Official register 21 Nov 2026 | 21.16% Official register |
| Beach Walk Grand by Imtiaz | 25 Dec 2026 | Official register 18 Nov 2026 | 67.99% Official register |
| Beachfront Gates 1 | 30 Dec 2026 | Official register 25 Nov 2026 | 36.34% Official register |
| Beachfront Gates 2 | 30 Dec 2026 | Official register 21 Nov 2026 | 61.37% Official register |
| Bhuvi Residence | 15 Dec 2026 | Official register 23 Nov 2026 | 31.55% Official register |
| Bianca | 31 Dec 2026 | Official register 21 Nov 2026 | 56.13% Official register |
| Binghatti Hillcrest | 31 Dec 2026 | Official register 23 Nov 2026 | 60% Official register |
| Binghatti Skyrise | 31 Dec 2026 | Official register 18 Nov 2026 | 35.89% Official register |
| Bliss Tower | 15 Dec 2026 | Official register 23 Nov 2026 | 92.52% Official register |
| Bonds Avenue Residences | 31 Dec 2026 | Official register 23 Nov 2026 | 6.85% Official register |
| Canal Heights de GRISOGONO | 31 Dec 2026 | Official register 23 Nov 2026 | 36.3% Official register |
| Cove Edition III by Imtiaz | 25 Dec 2026 | Official register 23 Nov 2026 | 43.99% Official register |
| Cresswell Homes | 31 Dec 2026 | Official register 23 Nov 2026 | 61.41% Official register |
| Cresswell Views | 30 Dec 2026 | Official register 23 Nov 2026 | 60.2% Official register |
| Eden Hills | 25 Dec 2026 | Official register 23 Nov 2026 | 3.54% Official register |
| ELO (DAMAC Hills 2) | 2026-Q4 | Developer site 12 Nov 2026 | 31.5% Official register |
| Empire Estates | 31 Dec 2026 | Official register 21 Nov 2026 | 60% Official register |
371 more in the handover pipeline: Handover pipeline by year
Handover slippage in Dubai
In Dubai, 42 tracked projects are past their first handover date on record: a median of 5 months (range 1 to 50). Historical statistic from our records, not a forecast.
Middle half (25th to 75th percentile): 4.3 – 8 · Not yet due: 1,090 · Computed 26 Nov 2026
How this is computed · Data as JSON · Compare Dubai with other markets
Delivery forecast: Dubai
Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.
For context only, all markets pooled: 109 projects whose first promised handover has passed; 18 recorded as handed over. This is not an estimate for Dubai. Kolaboro promise history, 25 Nov 2026
| Handed over by | Estimated chance | 95% range |
|---|---|---|
| the first promised date | 11% | 5% - 17% |
| 6 months after it | 15% | 7% - 22% |
| 12 months after it | 19% | 10% - 27% |
| 18 months after it | 19% | 10% - 27% |
| 24 months after it | 19% | 10% - 27% |
Limitation: most projects we track are still on sale, so projects that handed over on time before we started tracking are under-represented. The estimate is likely to be too low.
More data on Dubai
- Monthly market report
- Developers ranked by transparency
- Projects with a published permit
- Projects by price range
- Projects near Al Maktoum International Airport
- Projects near Dubai International Airport
- Projects near Sharjah International Airport
- Freehold or leasehold for foreigners: UAE
- UAE golden visa (10-year residence) for property investors
- Arada vs Avenew
- Arada vs Azizi Developments
- Arada vs Beyond Developments
- Arada vs Binghatti Developers
- Arada vs DAMAC Properties
- Arada vs Danube Properties
Follow changes: What changed in Dubai each week (Atom) · Every change to the data (JSON Feed) · What we shipped (RSS)
Dubai from the register
DLD register: of 868 Dubai projects compared, 82.7% are more than 10 points behind the share of time elapsed to their registered completion date (median gap -27.1 points). A historical reading, not a verdict.
With 95% intervals
- Median 11 months late (95% interval 9 to 23, n = 8 projects past their first handover)
- 11.3% of projects with a date are past their first handover (95% interval 5.8% to 20.7%, n = 71)
- Median asking price per m2 AED 24,085 (95% interval 20,216 to 27,286, n = 83)
Bootstrap and Wilson intervals from our dated records; a wide interval means a small sample. All intervals and the method