Satellite construction index
For each project with a precise pin, how much of the ground around it turned built-up or bare since 2017, from free Sentinel-2 images: a chart per project, the method and its limits. A reading, not a verdict.
Updated 19 Nov 2026
The index shows cleared ground, slabs and roofs seen from space at 10 m per pixel. It cannot see floors, interiors or quality, and a flat line can be normal (a tower on a plot that was already concrete). Use it to ask the developer for dated site photos.
| Project | Index since 2017 | Last 12 months: before → now | Visible change from | Note | |
|---|---|---|---|---|---|
| 100 Avenue Road London · off-plan | -7 → -4 | ||||
| 111 Menerung (One Eleven Menerung) Malaysia · under construction | 9 → 7 | ||||
| 16 Alexander Tower Lagos · under construction | -10 → -3 | ||||
| 175 East 82nd Street New York · under construction | 2 → 3 | flat while under construction | |||
| 3300 Gulf Shore Naples · under construction | 1 → 0 | ||||
| 700-apartment project in Altıntaş (Altıntaş Park Yaşam listing) Antalya · under construction | 51 → 50 | 2017-08 | |||
| ALERO Vallarta Puerto Vallarta · off-plan | 0 → 0 | 2022-09 | |||
| AURA Condominium Phuket · under construction | 0 → 7 | ||||
| Aethera Residences Malaysia · off-plan | -12 → -16 | ||||
| Aire Gardens Leeds · off-plan | 1 → 0 | ||||
| Almazara Gardens Costa del Sol · under construction | 11 → 10 | 2022-05 | |||
| Amethyst Springs (Amethyst Kilimani) Nairobi · off-plan | 2 → 2 | ||||
| Amiba Bukit Bintang (formerly IBN Bukit Bintang) Malaysia · off-plan | 13 → 16 | 2026-07 | |||
| Andare Residences by Pininfarina Fort Lauderdale · under construction | -6 → -8 | flat while under construction | |||
| Arancia Yards by Beyond Dubai · off-plan | 0 → 2 | ||||
| Armani Hallson KLCC (Residensi Armani Hallson KLCC) Malaysia · under construction | 13 → 7 | ||||
| Ashiyana Heights Phuket · off-plan | 2 → -1 | ||||
| Avrupa Konutları Güneşli Istanbul · | -2 → -4 | ||||
| Aykon City 3 Dubai · under construction | -1 → 4 | ||||
| Bab Al Qasr Garden Residence 66 Abu Dhabi · under construction | 16 → 15 | 2024-03 | |||
| Balcón de Finestrat (Sierra Cortina) Spain · under construction | 6 → 5 | 2020-05 | |||
| Black Sands Oasis Bali · off-plan | -1 → -1 | ||||
| Bodhi Tulum Riviera Maya · under construction | 2 → 3 | ||||
| Boka Place Montenegro · completed | -17 → -22 | ||||
| Boulevard (Phase 2, Blocks A1 to A6) Birmingham · under construction | 0 → 0 | flat while under construction | |||
| Branniganz Suites @ Bukit Bintang Malaysia · under construction | -2 → -3 | flat while under construction | |||
| Casa Una Residence Koh Samui · under construction | 1 → 1 | ||||
| Cello Tower Las Vegas · under construction | -14 → -12 | flat while under construction | |||
| Chalet Caribou French Alps · off-plan | 0 → 0 | ||||
| Club Drive Dubai · under construction | 7 → 8 | 2022-03 | flat while under construction | ||
| Colette Residences Miami · off-plan | 2 → 3 | ||||
| Contour, New Jackson Manchester · under construction | 8 → 11 | ||||
| Cora Sur Los Cabos · under construction | -6 → -6 | 2022-10 | |||
| Crown Penang Malaysia · under construction | -5 → -2 | flat while under construction | |||
| Djuba Estate Mozambique · under construction | -30 → -38 | ||||
| Domville apartments, Cherrywood Dublin · under construction | 13 → 14 | 2021-01 | flat while under construction | ||
| ENADIA Villas SeaView Collection Lombok · off-plan | -5 → -6 | 2019-09 | |||
| Edition Birmingham, Centenary Tower Birmingham · | -1 → -2 | 2022-04 | |||
| Elements Cyprus · under construction | 13 → 11 | 2021-08 | |||
| Elounda Hills Greece · off-plan | 0 → 1 | ||||
| FIX Residences Greece · off-plan | -7 → -6 | ||||
| Fendi Chateau Residences Punta del Este, Tower 3 Uruguay · off-plan | 12 → 13 | 2025-04 | |||
| Forest City 2 Dubai · | 14 → 13 | 2023-11 | |||
| Forma (East Tower of the Mirvish+Gehry complex) Toronto · under construction | -1 → -4 | flat while under construction | |||
| Fox & Foundry Liverpool · off-plan | -13 → -2 | ||||
| Fuente Lirios Costa del Sol · under construction | 1 → 2 | flat while under construction | |||
| Gaia Residences Fort Lauderdale · off-plan | -11 → 0 | ||||
| Golf Vale Dubai · off-plan | -2 → 3 | ||||
| Grand Bay Apartamentos Costa del Sol · under construction | -1 → 18 | 2026-04 | rising in the last 12 months | ||
| Green Tower Hotel & Residences Croatia · under construction | 0 → -2 | flat while under construction | |||
| Hayat Flora Istanbul · under construction | 20 → 11 | 2019-08 | |||
| Hunab-Ku Sanctuary Riviera Maya · under construction | -1 → -1 | ||||
| Infinity Spain · | -5 → -9 | 2020-07 | |||
| Ingram Street, Merchant City Glasgow · off-plan | -1 → -3 | ||||
| InterContinental Grenada - La Sagesse (CBI hotel shares) Grenada · under construction | -6 → -8 | flat while under construction | |||
| InterContinental Residences Bangkok Asoke Bangkok · off-plan | -7 → -7 | ||||
| Kuzey Adalar (Northern Islands) Kartal Istanbul · under construction | 47 → 47 | 2017-08 | |||
| La Perle de Tanger Tangier · under construction | 36 → 41 | 2017-08 | |||
| Le Marin Konyaaltı Antalya · off-plan | -2 → -3 | ||||
| Love It Wongamat Beach Pattaya · off-plan | -5 → -2 | 2024-01 | |||
| Luna at Marina Pointe (Tower Two) Tampa · off-plan | -6 → -19 | ||||
| Mamsha Palm Abu Dhabi · under construction | 0 → 0 | flat while under construction | |||
| Mercedes-Benz Places Miami Miami · under construction | 3 → 4 | ||||
| Mežciema mājas, phase 2 (S. Eizenšteina iela 47) Riga · off-plan | -6 → -6 | ||||
| Molum Hotel & Residences Croatia · completed | 3 → 6 | ||||
| Moon Gate Hotel & Spa (suites) Antigua · under construction | -3 → 0 | ||||
| Nasim Al Bahr Residences (The Luxury Collection) Ras Al Khaimah · under construction | 8 → 9 | 2026-02 | |||
| Nativa Tulum Riviera Maya · off-plan | 8 → 4 | 2024-05 | |||
| Nautica Residences by Naúma Riviera Maya · under construction | -10 → 2 | ||||
| Nobu Residences Manchester (Viadux 2) Manchester · | -2 → -6 | ||||
| Nouvelle Vague French Riviera · under construction | -2 → 2 | ||||
| ORA by Casa Tua Miami · off-plan | -6 → -8 | ||||
| Obsidian Manchester · under construction | 0 → 0 | flat while under construction | |||
| One Seputeh Residences Malaysia · off-plan | 0 → 1 | ||||
| Opus, Bankside Yards London · under construction | -5 → -4 | flat while under construction | |||
| Pafilia Plaza Cyprus · under construction | -10 → -11 | ||||
| Palo Alto Villas Costa del Sol · under construction | 6 → 7 | 2017-08 | |||
| Park Lane Apartments, Cherrywood Village Dublin · off-plan | 37 → 41 | 2023-12 | |||
| Passage Amador Panama · under construction | 10 → 4 | ||||
| Pavilion Damansara Heights Phase 2 (Royal Suites and Imperial Residences) Malaysia · under construction | 8 → -7 | 2019-11 | |||
| Pavilion Square Kuala Lumpur (Luxury Residences) Malaysia · under construction | 6 → 6 | ||||
| Pendry Residences Barbados Barbados · under construction | -9 → -8 | ||||
| Pendry Residences Nashville Nashville · under construction | 11 → 12 | 2020-05 | flat while under construction | ||
| Prime Villa Samui Koh Samui · off-plan | -4 → 1 | ||||
| Priors Gate Birmingham · off-plan | -4 → 2 | ||||
| R&F Princess Cove Phase 3, New Casa Suites (Mercu 3) Malaysia · under construction | 14 → 8 | 2025-06 | |||
| Regency Works (Blocks A and D for sale) Leeds · under construction | 17 → 15 | 2024-07 | |||
| Riviera Tower Greece · under construction | 6 → 10 | 2017-06 | flat while under construction | ||
| Runwal Raaya Mumbai · off-plan | -15 → -18 | ||||
| Résidence Oceana, Achakkar Tangier · under construction | 9 → 7 | 2024-07 | |||
| Sabah Towers Baku · off-plan | 8 → -2 | 2019-02 | |||
| Samudra Villas Lombok · off-plan | -1 → -1 | 2023-11 | |||
| Senna Tower Brazil · off-plan | 5 → 4 | ||||
| Sereno Fort Lauderdale Fort Lauderdale · off-plan | -6 → -8 | ||||
| Sky Gate Tower Dubai · under construction | -1 → -3 | flat while under construction | |||
| Sobha Siniya Island Villas (Phase 1) Umm Al Quwain · under construction | -10 → -28 | ||||
| Solana Village (La Cala Golf Resort) Costa del Sol · under construction | 22 → 14 | 2021-12 | |||
| Stellar by Elie Saab Abu Dhabi · off-plan | 2 → 2 | ||||
| Sunset Residences at A'ILA Resorts St Lucia · under construction | 3 → 0 | ||||
| Sunstone Abu Dhabi · off-plan | -12 → -17 | ||||
| The Anti Galerie Hotel Colombia · under construction | -8 → -11 | ||||
| The Ashwood Kuala Lumpur · under construction | 7 → 6 | ||||
| The Launiu Ward Village Hawaii · under construction | 14 → 18 | 2020-07 | |||
| The Level Apartments (Phase IV) Bucharest · off-plan | -3 → 2 | ||||
| The New Village, Edinburgh Park Edinburgh · under construction | 2 → 0 | flat while under construction | |||
| The Peaks, Luštica Bay Montenegro · under construction | -15 → -13 | flat while under construction | |||
| The Residences at 1428 Brickell Miami · under construction | -7 → -6 | flat while under construction | |||
| The Residences at The Nashville EDITION Nashville · off-plan | -2 → 1 | ||||
| The Source Terraces Abu Dhabi · under construction | 14 → 4 | 2025-04 | |||
| The St. Regis Residences, Miami (1809 Brickell) Miami · under construction | 2 → 2 | flat while under construction | |||
| The Sustainable City - Yiti Oman · under construction | -4 → -4 | ||||
| The Westin Residences Penang Malaysia · under construction | 42 → 43 | 2018-11 | |||
| The Windsor New York · under construction | -6 → -5 | flat while under construction | |||
| Unsere Flora Berlin · under construction | 0 → 1 | ||||
| Valia Dubai · off-plan | -9 → 1 | ||||
| Valora Estate Namibia · off-plan | 0 → 0 | ||||
| Vanderbilt Residences Condado Puerto Rico · under construction | -2 → 0 | flat while under construction | |||
| Vesa (Little Mountain, Phase 1) Vancouver · off-plan | 14 → 14 | 2024-08 | |||
| Viceroy Residences Austin Austin · under construction | -34 → -20 | ||||
| Villas Mbuva Mozambique · under construction | 13 → 0 | 2019-07 | |||
| Vía Verde Conjunto Residencial Riviera Maya · off-plan | 46 → 50 | 2024-04 | |||
| W Residences Manchester (No.2 St Michael's) Manchester · under construction | 2 → 5 | flat while under construction | |||
| Waldorf Astoria Hotel & Residences Miami Miami · under construction | 1 → 4 | flat while under construction | |||
| Zen Gardens Montenegro · off-plan | 4 → 3 |
Method
Per month, the share of a 150 m circle around the pin that looks built-up or bare (NDBI above 0 and NDVI below 0.25, so vegetation counts as not built), minus the same share in a ring 300 to 600 m away, so season and haze cancel out. The index is that difference minus its median over the first 3 clear months, in percentage points; the smoothed line is the median of the last 3 clear months.
Visible change from: the first of 3 clear months in a row with the smoothed index at 15 points or more (single-month noise in the first months: median 4, 90th percentile 15). Flat: marked under construction, construction start 12 or more months ago, and the smoothed index moved less than 5 points between the last two 12-month windows while staying under 15.
Limits
Sentinel-2 pixels are 10 m. Cloudy months are empty, never filled in. The pin comes from public sources and is about 100 m accurate, so the circle can miss part of a large site or include a neighbour. Low winter sun, wet ground and haze move the index too.