Luna at Marina Pointe (Tower Two): reviews and facts
What is published about Luna at Marina Pointe (Tower Two) in Westshore Marina District, Tampa, USA, what official registers and other sources say, and what changed over time. Facts only, each with its source.
- Developer
- BTI Partners prnewswire.com
- Location
- Westshore Marina District, Tampa, USA
- Stage
- off-plan · active prnewswire.com
- Handover on record
- Q4 2028 prnewswire.com
- Permit or licence number
- not published
- Deposit protection
- not researched yet
- Page we read
- prnewswire.com prnewswire.com
- Last checked
- 5 Nov 2026
- Open data record
- TPA-003
In short
- Luna at Marina Pointe (Tower Two) is listed as off-plan in Westshore Marina District, Tampa, USA, by BTI Partners. prnewswire.com
- The handover date on record is Q4 2028. prnewswire.com
- No permit or licence number is published in the sources we read. marinapointe.com
- Of 10 developer claims we checked, 5 are confirmed by a register or an independent source, 4 are not yet verified and 1 are contradicted by another source. Open data record
What is promised
As published by the developer or on listing pages, in the wording of the source.
- Price from: USD 1,000,000 - 4,000,000 prnewswire.com
- Units: 151 prnewswire.com
- Unit sizes: 102 - 325 m² prnewswire.com
- Unit types: 1BR, 2BR, 3BR, 4BR, Harbour Home prnewswire.com
- Ownership: Fee simple condominium; no restriction on foreign buyers in Florida prnewswire.com
- Permit authority: City of Tampa; Florida DBPR (condo filing) prnewswire.com
- Handover promised: Q4 2028 prnewswire.com
- developer: pre-construction residences from USD 1M, 1,100 to 3,500 sq ft marinapointe.com
- developer: names the Florida Chapter 718 developer LLCs and refers buyers to the prospectus marinapointe.com
- developer: deeded deep-water boat slips available marinapointe.com
- news: 151 condos plus 7 Harbour Homes, Coastal Construction as contractor marinapointe.com
- registry: DBPR filings PR77461 (Central) and PR77533 (West); Tower One recorded as PR76765 (125 units, Nov 2022) marinapointe.com
Delivery and delay record
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover or completion: Q4 2028 date still ahead
our research record of 1 Nov 2026 prnewswire.com - Construction start: 2026 date moved later · moved 1 times, 24 months in total
our research record of 1 Nov 2026 · Earlier dates on record: 2024 (1 Nov 2026) prnewswire.com
Permits and licences
- No permit or licence number is published in the sources we read.
- No building permit number published marinapointe.com
Live check in the official registers
Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.
The six buyer checks
Public means the information is published. The level says who confirms it. Method: how we score.
| Check | Public | Who confirms it | What we found |
|---|---|---|---|
| Permit or licence number | no | not published | No building permit number published marinapointe.com |
| Deposit protection | no | not published | Site and press release refer buyers to the prospectus; no escrow agent named publicly marinapointe.com |
| Construction progress | no | not published | No construction updates for Luna; oftmw.com lists groundbreaking expected 2026 marinapointe.com |
| Floor or site plans | no | not published | No floor plans downloadable on the site marinapointe.com |
| Developer track record | yes | confirmed in an official register | Tower One recorded on DBPR condo register (PR76765, 125 units, recorded 11/18/2022); Construction Dive and Florida YIMBY report Tower One completed May 2023 marinapointe.com |
| No guaranteed returns | yes | not published | No rental guarantee or yield language marinapointe.com |
Developer claims we tested
| Claim (source wording) | Result | Checked against | Source |
|---|---|---|---|
| Developer entities Marina Pointe Central Developer, LLC and Marina Pointe West Developer, LLC have condo filings with DBPR | verified | registry | www2.myfloridalicense.com |
| First tower (Marina Pointe East) delivered and condominium recorded | verified | registry | www2.myfloridalicense.com |
| Tower One completed May 2023 (118 condos, 7 Harbour Homes) | verified | independent | constructiondive.com |
| Coastal Construction selected as contractor for next phases | verified | independent | floridayimby.com |
| Tower Two construction to begin later in 2024 | contradicted | independent | oftmw.com |
| Luna has 151 residences over 17 floors | verified | independent | floridayimby.com |
| Prices from about USD 1M to over USD 4M | not verified yet | prnewswire.com | |
| Private marina is fully operational | not verified yet | prnewswire.com | |
| Completion around December 2028 | not verified yet | oftmw.com | |
| Building permit issued for Luna | not verified yet | marinapointe.com |
What changed, with dates
- No dated change recorded yet.
- Fingerprint of the developer page text on 4 Nov 2026: SHA-256
90eaf7c95f33cca7.... Anyone can check it on kolaboro.com/verify. kolaboro.com/verify
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
About the developer
- Head office: Fort Lauderdale, USA prnewswire.com
- Legal entity: Marina Pointe Central Developer, LLC (DBPR PR77461); Marina Pointe West Developer LLC (PR77533) prnewswire.com
- Projects delivered: 1 prnewswire.com
- Units delivered: 125 prnewswire.com
- Tower One recorded on DBPR condo register (PR76765, 125 units, recorded 11/18/2022); Construction Dive and Florida YIMBY report Tower One completed May 2023 prnewswire.com
Similar projects
- Hotel ORA + Private Residences Tampa · off-plan
- ONE Tampa Tampa · under construction
- The Residences at The Nashville EDITION Nashville · off-plan
- The St. Regis Residences, Houston Houston · off-plan
- Gaia Residences Fort Lauderdale · off-plan
Market context: Tampa
- We track 3 projects in Tampa. 67% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m
Buyer reviews
There are no verified buyer reviews of Luna at Marina Pointe (Tower Two) yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Before you pay
Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.
Questions buyers ask
Is Luna at Marina Pointe (Tower Two) legit?
Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 10 developer claims we checked, 5 are confirmed by a register or an independent source, 4 are not yet verified and 1 are contradicted by another source. The handover date on record is Q4 2028. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.
When will Luna at Marina Pointe (Tower Two) be delivered?
The handover date on record is Q4 2028.
Who is the developer of Luna at Marina Pointe (Tower Two)?
BTI Partners, according to the sources listed on this page.
Does Luna at Marina Pointe (Tower Two) have a permit or licence?
No permit or licence number is published in the sources we read.
Are there reviews of Luna at Marina Pointe (Tower Two)?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- prnewswire.com https://www.prnewswire.com/news-releases/marina-pointes-luna-tower-offers-tampa-bay-waterf...
- marinapointe.com https://marinapointe.com/luna/
- floridayimby.com https://floridayimby.com/2024/07/general-contractor-selected-for-next-phases-of-marina-poi...
- marinapointe.com https://marinapointe.com/
- marinapointe.com https://marinapointe.com/phase-2-of-marina-pointe-in-westshore-marina-district-tampa-bay-f...
- constructiondive.com https://www.constructiondive.com/news/luxury-condo-tower-construction-tampa/723342/
- oftmw.com https://www.oftmw.com/projects/marina-pointe-luna/
- www2.myfloridalicense.com https://www2.myfloridalicense.com/sto/file_download/extracts/Condo_CW.csv
- www2.myfloridalicense.com https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv
Last checked 5 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.