ONE Tampa: reviews and facts
What is published about ONE Tampa in Downtown Tampa (520 N Tampa St), Tampa, USA, what official registers and other sources say, and what changed over time. Facts only, each with its source.
- Developer
- Kolter Urban homesandcondostampa.com
- Location
- Downtown Tampa (520 N Tampa St), Tampa, USA
- Stage
- under construction homesandcondostampa.com
- Handover on record
- 2027 homesandcondostampa.com
- Permit or licence number
- DBPR condominium filing PR77422 floridayimby.com
- Deposit protection
- not researched yet
- Page we read
- homesandcondostampa.com homesandcondostampa.com
- Last checked
- 5 Nov 2026
- Open data record
- TPA-001
In short
- ONE Tampa is listed as under construction in Downtown Tampa (520 N Tampa St), Tampa, USA, by Kolter Urban. homesandcondostampa.com
- The handover date on record is 2027. homesandcondostampa.com
- A permit or licence number is published. floridayimby.com
- Of 9 developer claims we checked, 4 are confirmed by a register or an independent source, 4 are not yet verified and 1 are contradicted by another source. Open data record
- The handover date moved 1 times in our records, by 2 months in total. promise tracker
What is promised
As published by the developer or on listing pages, in the wording of the source.
- Units: 225 homesandcondostampa.com
- Unit sizes: 111 - 390 m² homesandcondostampa.com
- Unit types: 1BR, 2BR, 3BR, 3BR+den, penthouse homesandcondostampa.com
- Ownership: Fee simple condominium, no restriction on foreign buyers homesandcondostampa.com
- Permit authority: City of Tampa Construction Services; Florida DBPR Division of Condominiums homesandcondostampa.com
- Handover promised: Q3 2027 homesandcondostampa.com
- 225 residences, 1-3BR 1,200 to 2,723 sq ft, penthouses 3,700 to 4,200 sq ft (agent) floridayimby.com
- topped out Aug 2026, first residents fall 2027 (Florida YIMBY) floridayimby.com
- nearly 70% sold, closings from Q3 2027 (Tampa Bay Business & Wealth) floridayimby.com
- Florida DBPR filing PR77422 'One Tampa, a Condo' (KT North Ashley LLC) floridayimby.com
Delivery and delay record
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover or completion: 2027 date moved later · moved 1 times, 2 months in total
developer or listing page, copy of 5 Nov 2026 (SHA-256 f3e972a8af92ccfc) homesandcondostampa.com - Delay stated in the sources we read: 2 months. homesandcondostampa.com
Permits and licences
- Number published: DBPR condominium filing PR77422. floridayimby.com
- Florida DBPR developer summary lists PR77422 'One Tampa, a Condo', developer KT North Ashley LLC, mailing address 105 NE 1st St, Delray Beach (Kolter); no building permit number published floridayimby.com
Live check in the official registers
Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.
The six buyer checks
Public means the information is published. The level says who confirms it. Method: how we score.
| Check | Public | Who confirms it | What we found |
|---|---|---|---|
| Permit or licence number | yes | confirmed in an official register | Florida DBPR developer summary lists PR77422 'One Tampa, a Condo', developer KT North Ashley LLC, mailing address 105 NE 1st St, Delray Beach (Kolter); no building permit number published floridayimby.com |
| Deposit protection | no | not published | Not published; Florida 718.202 statutory escrow for deposits up to 10% floridayimby.com |
| Construction progress | yes | confirmed by an independent source | Topped out Aug 2026 (Florida YIMBY, Tampa Bay Times, TBBW); about one year of interior work remains; no % floridayimby.com |
| Floor or site plans | yes | not published | Floor plans on request only floridayimby.com |
| Developer track record | yes | confirmed in an official register | DBPR condo extracts show three Kolter condominiums recorded 2023-2025 (588 units) by KT entities at the same Delray Beach address floridayimby.com |
| No guaranteed returns | yes | stated only by the developer | No return language floridayimby.com |
Developer claims we tested
| Claim (source wording) | Result | Checked against | Source |
|---|---|---|---|
| Condo filed with Florida DBPR (PR77422) by KT North Ashley LLC | verified | registry | www2.myfloridalicense.com |
| Kolter delivered Bayso, Art House and Selene (recorded condos, 588 units) | verified | registry | www2.myfloridalicense.com |
| Structure topped out Aug 2026 at 42 storeys | verified | independent | floridayimby.com |
| Nearly 70% of 225 residences sold | not verified yet | independent | tbbwmag.com |
| Closings from Q3 2027 | not verified yet | tbbwmag.com | |
| Height capped at 649 ft by FAA and aviation authority (cut from 55 storeys) | verified | independent | tbbwmag.com |
| Year built 2026 (agent) | contradicted | independent | floridayimby.com |
| Hurricane delay of about two months largely recovered | not verified yet | tbbwmag.com | |
| Deposits held in escrow | not verified yet | m.flsenate.gov |
What changed, with dates
- No dated change recorded yet.
- Fingerprint of the developer page text on 5 Nov 2026: SHA-256
f3e972a8af92ccfc.... Anyone can check it on kolaboro.com/verify. kolaboro.com/verify - Satellite comparison (Sentinel-2, same season a year apart) on 5 Nov 2026: visible change, 9.4% of the area changed. kolaboro.com/satellite
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
About the developer
- Head office: Delray Beach, Florida, USA homesandcondostampa.com
- Legal entity: KT North Ashley LLC (DBPR developer of record) homesandcondostampa.com
- Projects delivered: 3 homesandcondostampa.com
- Units delivered: 588 homesandcondostampa.com
- DBPR condo extracts show three Kolter condominiums recorded 2023-2025 (588 units) by KT entities at the same Delray Beach address homesandcondostampa.com
Other projects by Kolter Urban that we track
- 3300 Gulf Shore Naples
Similar projects
- Andare Residences by Pininfarina Fort Lauderdale · under construction
- Luna at Marina Pointe (Tower Two) Tampa · off-plan
- Bentley Residences Miami Miami · under construction
- Mercedes-Benz Places Miami Miami · under construction
- The Windsor New York · under construction
Market context: Tampa
- We track 3 projects in Tampa. 67% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m
Buyer reviews
There are no verified buyer reviews of ONE Tampa yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Before you pay
Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.
Questions buyers ask
Is ONE Tampa legit?
Kolaboro does not label projects or developers. What the public record shows: A permit or licence number is published. Of 9 developer claims we checked, 4 are confirmed by a register or an independent source, 4 are not yet verified and 1 are contradicted by another source. The handover date on record is 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.
When will ONE Tampa be delivered?
The handover date on record is 2027. The handover date moved 1 times in our records, by 2 months in total.
Who is the developer of ONE Tampa?
Kolter Urban, according to the sources listed on this page.
Does ONE Tampa have a permit or licence?
A permit or licence is confirmed in an official register (see Permits and licences).
Are there reviews of ONE Tampa?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- homesandcondostampa.com https://homesandcondostampa.com/tampa-condos/one-tampa.htm
- floridayimby.com https://floridayimby.com/2026/08/construction-tops-out-on-42-story-one-tampa-in-downtown-t...
- m.flsenate.gov https://m.flsenate.gov/Statutes/718.202
- tbbwmag.com https://tbbwmag.com/2026/08/07/one-tampa/
- www2.myfloridalicense.com https://www2.myfloridalicense.com/sto/file_download/extracts/Condo_CW.csv
- www2.myfloridalicense.com https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv
Last checked 5 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.