Elke dag nieuw
Nov 12SHIPPEDTransparency rankings for 30 islands and 30 cities: every tracked off-plan project scored 0 to 100 on what is published and checkable (legal name, permit, handover date and its record, deposit protection, location, website, official lists), with the method and weights public, a source on every line, a right of reply on every row and the full analysis by email on request; Sumba is ranked with a disclosure, and the founder's own project there is excludedNov 12DATA27 more projects added in 11 countries of the Americas and Asia-Pacific, filling markets the previous batch left empty: the Dominican Republic, Panama, Mexico, Belize, the Bahamas, Vietnam, Indonesia and Fiji, plus Texas, New York, California, Colombia and Sri Lanka (1,294 tracked in total): 13 have a handover date as the developer publishes it and 9 have a map pin from the developer's own map, page data or address; every fact has a source link and none is reviewed or scored yetNov 12SHIPPEDError sweep after the 11 November release: market pages no longer jump while they load (layout shift 1.5 to 0), the sealed X-ray page holds its place too, stale totals removed from the French and Russian home pages and the database page in 8 languages, one airport route that ran on an airfield service road taken out of the distance check, the Berlin short-let rule linked to the official page that is online, 26 broken links on translated pages repaired (payment email check, market pages, booking), the verify page now says its file list is weekly, singular forms in the bulk check, and the deploy guard's browser set-up repairedNov 12DATA33 more projects added in 11 countries across the Americas and Asia-Pacific, from Canada, the USA, Brazil and Colombia to Japan, Malaysia, the Philippines, Australia and New Zealand (1,267 tracked in total): 25 have a handover date as the developer publishes it and 12 have a map pin from the developer's own map or address; every fact has a source link and none is reviewed or scored yetNov 12DATA60 more projects added in 17 countries across Europe, the Middle East and Africa, from France, Germany and Spain to the UAE, Oman, Egypt, Kenya and South Africa (1,234 tracked in total): 43 have a handover date as the developer publishes it and 25 have a map pin from the developer's own map or address; every fact has a source link and none is reviewed or scored yetNov 11SHIPPEDDeveloper pages now list official gazette notices about the developer's company when it is identified by its exact legal name: Spain's BORME (every daily issue of the last 12 months), France's BODACC (by SIREN number) and The Gazette in the UK, with notice type, date and link; no names of people are copiedNov 11SHIPPEDAround the site: project pages with a reliable pin now show the nearest sea, beach, airport, runway end, hospital, school, supermarket and transport stop from OpenStreetMap, and the yearly PM2.5 and NO2 of the Copernicus atmosphere modelNov 11SHIPPEDDistance claims check: distances and travel times stated on the project page we track are quoted from our sealed copy next to the straight-line and road distance measured from the pinNov 11SHIPPEDClimate at the plot: hot days, warm nights, yearly rain and heavy-rain days for 1995 to 2014 against 2040 to 2059, with the range across climate models (World Bank CMIP6 data)Nov 11SHIPPED39 developer pages of listed companies now show the exchange, the ticker and a link to the official filings, with the latest annual report date for those filing with the US SEC. No share prices, no adviceNov 11SHIPPEDStricter script rules on every page: a script runs only when our own page loaded it, so injected code is blocked by the browser; tested first on 271 pages, every tool, the portal and the adminNov 11DATA50 more projects added in 21 countries, from the UAE, Spain and the UK to Australia, Malaysia and Greece (1,174 tracked in total): each has its developer page, the handover date as published or "not published", and a source link for every fact; none is reviewed or scored yetNov 11SHIPPEDCan you legally short-let there? Project pages and a new guide show licence or registration, caps and zones, night limits and building rules for 23 places, each linked to the official source and its dateNov 11SHIPPEDDeveloper pages now compare the company name with official regulator warning lists of unauthorised firms (FCA, AMF, MAS, SFC, FINMA, Central Bank of Ireland, SEC) and show a no-match result with each list's date; possible matches go to a private review and are never publishedNov 11SHIPPEDAccessibility pass on 271 pages with an automated checker: charts and status strips are announced correctly, sideways-scrolling boxes work from the keyboard, small links are easier to tap; Russian pages use the right word form after numbers; project links open the project page directlyNov 11SHIPPEDProject pages now say where the developer's own schedule puts the project today, and the promised dates download as a calendar file (.ics) or a subscription that updates when a date moves; the portal exports your payment schedule the same way
Wijzigingen →

Kolaboro / Ranglijsten / Transparantie / Abu Dhabi

Meest transparante off-planprojecten in Abu Dhabi

De transparantiescore meet wat per project gepubliceerd en controleerbaar is, op basis van feiten met een bron. Het is geen oordeel over kwaliteit, veiligheid of waarde. "Niet gepubliceerd" betekent dat we geen openbare bron vonden.

20projecten gescoord
83mediane transparantiescore
85%publiceren een vergunnings- of licentienummer
95%publiceren een opleverdatum
90%vermelden aanbetalingsbescherming

Data gelezen op 12 november 2026. Hoe de score werkt

Hier geteld: alle projecten in onze markt Abu Dhabi.

De ranglijst

RangProjectOntwikkelaarScoreBedrijfsnaamVergunningOpleverdatumDatumgeschiedenisAanbetalingsbeschermingLocatie
1Al Sidr (Saadiyat Lagoons)Ontwikkelaar? Stuur wat we mistenAldar Properties100JaJaJaJaJaJa
1Mamsha PalmOntwikkelaar? Stuur wat we mistenAldar Properties PJSC100JaJaJaJaJaJa
1The Source TerracesOntwikkelaar? Stuur wat we mistenAldar Properties100JaJaJaJaJaJa
4Bayn - Views 3Ontwikkelaar? Stuur wat we mistenORA Developers94JaJaJaJaJaJa
4Hilton Residences Abu Dhabi Al RahaOntwikkelaar? Stuur wat we mistenEmirates Developments94JaJaJaJaJaJa
4Ramhan Island Villas Phase 4Ontwikkelaar? Stuur wat we mistenEagle Hills94JaJaJaJaJaJa
4River Cove Residences (Sobha City Abu Dhabi)Ontwikkelaar? Stuur wat we mistenSobha Realty94JaJaJaJaJaJa
4Stellar by Elie SaabOntwikkelaar? Stuur wat we mistenEmirates Developments94JaJaJaJaJaJa
9Sei SaadiyatOntwikkelaar? Stuur wat we mistenAldar Properties PJSC89JaJaJaJaJaNiet gepubliceerd
10Bab Al Qasr Garden Residence 66Ontwikkelaar? Stuur wat we mistenBurtville Developments83Niet gepubliceerdJaJaJaJaJa
10Solea by TarafOntwikkelaar? Stuur wat we mistenTaraf83JaJaJaJaJaNiet gepubliceerd
12Tara ParkOntwikkelaar? Stuur wat we mistenModon Properties PJSC78JaJaJaJaJaNiet gepubliceerd
13Olvera (Bloom Living phase 6)Ontwikkelaar? Stuur wat we mistenBloom Holding75Niet gepubliceerdJaJaJaJaNiet gepubliceerd
14BashayerOntwikkelaar? Stuur wat we mistenModon67Niet gepubliceerdJaJaDeelsJaNiet gepubliceerd
14Jacob & Co. Beachfront Living by Ohana (villas, phase B)Ontwikkelaar? Stuur wat we mistenOhana Development67JaJaJaJaNiet gepubliceerdNiet gepubliceerd
14Sensi SaadiyatOntwikkelaar? Stuur wat we mistenReportage Properties67Niet gepubliceerdJaJaJaJaNiet gepubliceerd
17Gardenia BayOntwikkelaar? Stuur wat we mistenAldar Properties66Niet gepubliceerdJaJaJaJaNiet gepubliceerd
18Manchester City Yas Residences by OhanaOntwikkelaar? Stuur wat we mistenOhana Development61JaNiet gepubliceerdJaJaJaNiet gepubliceerd
18SunstoneOntwikkelaar? Stuur wat we mistenIMKAN Properties61Niet gepubliceerdNiet gepubliceerdJaJaJaJa
20Fahid Beach Residences
Nog niet door ons beoordeeldOntwikkelaar? Stuur wat we misten
Aldar Properties8Niet gepubliceerdNiet gepubliceerdNiet gepubliceerdNiet gepubliceerdNiet gepubliceerdNiet gepubliceerd

Ontvang de volledige analyse voor Abu Dhabi per e-mail

De details van elk project, de documenten die we controleerden en een bericht als een score hier verandert. De ranglijst op deze pagina blijft gratis en openbaar.

Uw verzoek gaat naar het Kolaboro-team, dat per e-mail antwoordt. Automatische meldingen bij scorewijzigingen zijn er nog niet; we laten het weten zodra ze er zijn. Om u af te melden, beantwoordt u een e-mail van ons.

Bent u de ontwikkelaar? Stuur ons wat we misten

Als uw project iets publiceert dat we niet vonden (een vergunningsnummer, derdenrekening, opleverdatum, adres), stuur dan het document of de link. Na moderatie wordt de score bijgewerkt.

Stuur wat we misten Correcties

Vragen en antwoorden

Hoeveel off-planprojecten in Abu Dhabi scoort Kolaboro op transparantie?

20 projecten, volgens de data gelezen op 12 november 2026.

Wat is de mediane transparantiescore in Abu Dhabi?

83 van 100.

Hoeveel off-planprojecten in Abu Dhabi publiceren een vergunnings- of licentienummer?

17 van 20 (85%).

Hoeveel off-planprojecten in Abu Dhabi vermelden aanbetalingsbescherming?

18 van 20 (90%). 19 van 20 publiceren een opleverdatum.

Welk off-planproject in Abu Dhabi heeft de hoogste transparantiescore?

Al Sidr (Saadiyat Lagoons), Mamsha Palm, The Source Terraces (100 van 100). De score meet wat gepubliceerd en controleerbaar is, niet kwaliteit of veiligheid.

Bescherm mijn aankoop