Shipping daily
Nov 9SHIPPEDFull working test of the site (checks, tools, accounts, feeds, API): a saved X-ray now shows in your dashboard, project pages have a Save to my list button again, and the update feed is currentNov 9SHIPPEDSecurity hardening: pages now refuse inline script handlers, links built from third-party data cannot run scripts, the map and text-reading libraries are pinned with integrity hashes, and payment-check lookups are rate limitedNov 9SHIPPEDSpeed: the browser no longer restyles the whole page after every small change, project and developer pages are answered from an edge copy before any data is read, sections far from the screen are drawn as you get near them, and the open numbers page keeps its figures for a minuteNov 9SHIPPEDLookalike websites: a daily watch for new websites whose names resemble the developer and project websites we track, with registration and certificate dates, on developer pages and at /watch/lookalikes/Nov 9DATASanctions lists: developer company names are screened daily against the entity entries of the OFAC, UK and UN lists; developer pages show the lists and date when there is no matchNov 9DATACorporate family on developer pages: parents and subsidiaries from the GLEIF register (CC0) for 39 developers matched by exact legal name, and a new family link type in the developer graphNov 9DATATwo Birmingham project pins corrected (they sat one degree too far north); their map-based sections stay hidden until the next monthly rebuild uses the new pinsNov 9SHIPPEDProtected land near the pin on 125 project pages: Natura 2000 sites within 2 km, England green belt and other designations, the Spanish coast law easements and mapped nature reserves, with distances and layer datesNov 9SHIPPEDThe map's own history at each plot: when the buildings, roads and land use within 150 m were first drawn in OpenStreetMap and last changed, as a small timeline on 125 project pagesNov 9SHIPPEDSite check on 560 page views and 3,078 links: the two account checks merged into one, clearer tool descriptions and jump links, a country search, an accessible pricing table and a tidier free check on phonesNov 9SHIPPEDShort-let reality check on 28 project pages: Inside Airbnb listings within 1 km, median nightly price and their occupancy estimate, next to any rental yield the page we track printsNov 9DATARecorded sale prices within 1 km on 14 project pages: HM Land Registry (England), DVF (France) and NYC rolling sales, medians and price per m2 next to the developer's own headline priceNov 9SHIPPEDProject and developer pages are easier to read: identical price copies merged into one row, the overdue date sits next to the date it is about, correct singular wording, Arabic names no longer flip punctuation, and the website-health method is translatedNov 9SHIPPEDAny plot from space: pin any spot and get one clear Sentinel-2 picture per quarter since 2017, made on demand, and turn it or a project's time machine into a shareable time-lapse GIFNov 8DATASatellite images back to January 2017: the monthly Sentinel-2 series on 125 project pages now covers almost ten yearsNov 8SHIPPEDSee the site: open street-level photos within 200 m of the pin on 59 project pages, and a 3D view with terrain and 12,328 mapped buildings on 125
Changelog →

Kolaboro / Corrections

Corrections and replies

When we get something wrong, we fix it and record it here. Developers can also reply on any project page.

Accuracy check, November 2026

On 1 November 2026 we drew 50 projects at random from the database (the sample is fixed by a monthly seed, so it cannot be picked afterwards) and re-checked every one of their 485 tested claims against the cited source. The re-check was done by separate AI agents that had not done the original research; it is an automated second check, not a human audit. A human review of the same sample is next.

  • 472 claims: the source, or another credible source for the same fact, supports what we published.
  • 11 claims: the source does not support it. All 11 are corrected below.
  • 2 claims still could not be checked (the page fails to load or sits behind a paywall). They stay as published and go to the human review.

25 claims could not be read on the first pass; a second pass reopened them or found the same fact in another credible source: 22 held up, 1 was wrong and 2 remain unchecked.

Error rate among checkable claims: 11 of 483 (2.3%). Several other claims were confirmed but rated one level too high (for example a portal copying a register counted as the register itself); we are tightening those levels in the next research round.

Corrections log

  1. 1 Nov 2026 · SYD-003: "consent covers residential levels up to Level 54" changed to contradicted. The council consent lists Level 53 as the top residential level; Level 54 is plant.
  2. 1 Nov 2026 · BRA-004: a size conflict (41 vs 410 m²) changed from contradicted to unverified. The cited page no longer shows it.
  3. 1 Nov 2026 · ORL-003: "Phase 1 of 22 units completed" changed from verified to unverified. The cited listing does not mention it; only developer and agent pages do.
  4. 1 Nov 2026 · ORL-003: "construction of Phase 2 started" changed from unverified to contradicted. The developer's own site says Phase 2 is in pre-construction.
  5. 1 Nov 2026 · NBO-002: starting price changed from contradicted to unverified. The cited developer page matches the claim; the higher figure is only on agent pages.
  6. 1 Nov 2026 · BALI-034: "freehold apartments" changed from contradicted to unverified. The cited decree sets minimum prices for foreigners and does not itself rule on freehold.
  7. 1 Nov 2026 · BAH-003: "expected returns up to 7%" changed from verified to unverified. The source is the developer's press release republished unedited, not an independent source.
  8. 1 Nov 2026 · DXB-005: developer identity changed from contradicted to verified. The register lists the project company among the developer's registered entities.
  9. 1 Nov 2026 · CAB-008: "nearby hotel opened August 2026" changed from verified to unverified. The source announced the opening in advance.
  10. 1 Nov 2026 · AUH-014: "under construction" changed from contradicted to verified. The register also labels the project under construction.
  11. 1 Nov 2026 · MIA-001: "completion by about June 2028 per buyer contracts" changed from contradicted to verified (independent). A news report on the buyers' lawsuit confirms the contract date; whether it can be met is a separate question.

The monthly sampling script and the rules for scoring are open: scoring.py. See also how we collect data.

How to request a correction

  1. Write to us with the project page link and what you think is wrong.
  2. Attach the evidence: a document, a registry extract or a dated photo.
  3. We reply within 10 working days. If the evidence holds, we update the page and log the change here.

Removal requests

We remove personal data on request and correct factual errors. We don't remove accurate, evidenced findings because a project or developer would prefer them hidden; you can always add a public reply.

Protect my purchase