Ubud Dream:评价与事实
关于位于 Penestanan, Ubud, Bali, Indonesia 的 Ubud Dream 公开发布了什么、官方登记册和其他来源怎么说,以及随时间发生了哪些变化。只列事实,每条都有来源。
- 位置
- Penestanan, Ubud, Bali, Indonesia
- 阶段
- 在建 · active ubuddream.com
- 记录中的交付日期
- Q3 2027 ubuddream.com
- 许可证或执照编号
- 未公布
- 定金保护
- 尚未研究
- 我们阅读的页面
- ubuddream.com ubuddream.com
- 最近核查
- 2026年11月1日
- 开放数据记录
- BALI-033
简要
- Ubud Dream 列为在建,位于 Penestanan, Ubud, Bali, Indonesia,开发商为 LOYO & BONDAR。 ubuddream.com
- 记录中的交付日期为 Q3 2027。 ubuddream.com
- 我们阅读的来源中未公布许可证或执照编号。 loyobondar.com
- 在我们核查的 11 条开发商声明中,0 条已由登记册或独立来源确认,10 条尚未核实,1 条与其他来源相矛盾。 开放数据记录
承诺内容
按开发商或房源页面的发布内容,保留来源原文。
- 起价: IDR 1,100,000,000 ubuddream.com
- 单位数: 41 ubuddream.com
- 面积: 18 - 103 m² ubuddream.com
- 户型: 1BR apartment, 2BR apartment, 1BR villa, 2BR villa ubuddream.com
- 付款计划: 30% down, five 14% instalments every 3 months, last at transfer of rights ubuddream.com
- 发证机关: Gianyar Regency (PBG via SIMBG) ubuddream.com
- 定金: 30% ubuddream.com
- 承诺交付: Q3 2027 ubuddream.com
- 41 villas and apartments: villas 1BR 70 m2 and 2BR 82 m2, apartments 18 m2 (1BR) and 35 m2 (2BR) loyobondar.com
- apartments from 1.1 bln IDR (LB homepage) loyobondar.com
- layouts per unit type loyobondar.com
- general plan loyobondar.com
- construction completion Q3 2027 loyobondar.com
- payment: 30% down, five 14% payments every 3 months, last at transfer of rights loyobondar.com
- LB construction feed Oct 2026: villa MEP 93%, partition walls 97%, roofing 94%, finishing 26%, apartment excavation 28% loyobondar.com
- LB completed projects listed loyobondar.com
交付与延期记录
我们找到的每一项带日期的承诺、它如何变化以及日期是否已过。规则:承诺跟踪。
- 交付或竣工: Q3 2027 日期尚未到来
我们 2026年10月31日 的研究记录 ubuddream.com
许可证与执照
- 我们阅读的来源中未公布许可证或执照编号。
官方登记册实时核查
立即查询该国可访问的官方登记册,并显示每个登记册的返回结果。每个回复都做 SHA-256 哈希;不编造任何内容,登记册没有数据时会如实显示。
买家的六项核查
“公开”表示信息已公布。级别说明由谁确认。方法:评分方法。
| 核查项 | 公开 | 由谁确认 | 我们的发现 |
|---|---|---|---|
| 许可证或执照编号 | 否 | 未公布 | |
| 定金保护 | 否 | 未公布 | |
| 施工进度 | 是 | 仅开发商声明 | loyobondar.com 'Our Construction' October 2026: villa MEP 93%, partition walls 97%, roofing 94%, finishing 26%; apartment excavation 28% (no overall %) loyobondar.com |
| 户型图或总平面图 | 是 | 仅开发商声明 | ubuddream.com 'Ubud Dream layouts' per unit type with areas loyobondar.com |
| 开发商业绩 | 是 | 仅开发商声明 | LB homepage 'Completed Projects': Jungle Flower Villas (Ubud), U Villas (Bukit), Loyo Villas (Ubud), Melasti Dream (Bukit), XO Canggu (Canggu); homepage says 12 complexes, 6 completed; the LB presentation says 5 completed; loyo-development.com/lb_group says 4 delivered loyobondar.com |
| 无保证回报 | 是 | 未公布 | No yield guarantee on the project page; LB homepage offer '20% of the cost is covered by rental income after construction is completed' loyobondar.com |
我们核查的开发商声明
| 声明(来源原文) | 结果 | 对照来源 | 来源 |
|---|---|---|---|
| Construction completion Q3 2027 | 尚未核实 | ubuddream.com | |
| Villa roofing 94%, finishing 26%, apartment excavation 28% (Oct 2026) | 尚未核实 | loyobondar.com | |
| Villa roofing works had started by Nov 2025 (developer post on a portal) | 尚未核实 | balinsky.info | |
| 41 villas and apartments | 尚未核实 | ubuddream.com | |
| Apartments from 1.1 bln IDR | 尚未核实 | loyobondar.com | |
| 20% of the villa cost covered by rental income after completion ('villas in Ubud for 80% of the price') | 尚未核实 | loyobondar.com | |
| Completed complexes: 6 (homepage), 5 (presentation) or 4 (LB Group page) | 相矛盾 | loyo-development.com | |
| Completed projects Jungle Flower Villas, U Villas, Loyo Villas, Melasti Dream bookable as stays | 尚未核实 | palmera.realestate | |
| Building permit (PBG) issued | 尚未核实 | ubuddream.com | |
| Deposit protected in escrow | 尚未核实 | ubuddream.com | |
| Tenure for foreign buyers (not stated) | 尚未核实 | ubuddream.com |
变化记录(含日期)
- 尚无带日期的变化记录。
- 2026年11月1日 开发商页面文本指纹:SHA-256
da0303dbc453735f...。任何人都可以在 kolaboro.com/verify 核验。 kolaboro.com/verify
公开报道
公开来源的报道,附链接。我们只列出报道,不评判开发商。
- 在我们阅读的来源中未发现有关纠纷、监管行动、停工或财务困难的报道。
关于开发商
- 成立: 2007 ubuddream.com
- 总部: Badung, Bali, Indonesia ubuddream.com
- LB homepage 'Completed Projects': Jungle Flower Villas (Ubud), U Villas (Bukit), Loyo Villas (Ubud), Melasti Dream (Bukit), XO Canggu (Canggu); homepage says 12 complexes, 6 completed; the LB presentation says 5 completed; loyo-development.com/lb_group says 4 delivered ubuddream.com
我们跟踪的 LOYO & BONDAR 其他项目
类似项目
- Pandawa Dream Bali · 在建
- EDEM I Villas Bali · 在建
- Pandawa Hills Bali · 在建
- Temple Heights Bali · 在建
- Amari Villas III Bali · 在建
市场背景:Bali
- 我们在 Bali 跟踪 78 个项目。1% 公布许可证编号,15% 说明定金保护。 kolaboro.com/m
- 在 Bali,9 个被跟踪项目已超过记录中的首个交付日期;中位数为 5 个月。 kolaboro.com/index/delays
买家评价
Ubud Dream 尚无经核实的买家评价。我们只发布能证明购买的买家的评价(合同或收据的指纹,用通行密钥签名),并且须经审核员阅读后才发布。
等待审核的评价不会显示。
答复权
您是开发商吗?请发送文件,我们会把您的答复加到本页。发现事实有误?告诉我们,我们会更正并注明日期。
付款之前
粘贴项目链接,免费实时查看官方登记册的结果。如需完整的案头审查和本地代理实地走访,请订购购前核查。
买家常见问题
Ubud Dream 可靠吗?
Kolaboro 不给项目或开发商贴标签。公开记录显示:我们阅读的来源中未公布许可证或执照编号。 在我们核查的 11 条开发商声明中,0 条已由登记册或独立来源确认,10 条尚未核实,1 条与其他来源相矛盾。 记录中的交付日期为 Q3 2027。 在我们阅读的来源中未发现有关纠纷、监管行动、停工或财务困难的报道。 付款前请查看本页来源,并向开发商索取文件。
Ubud Dream 什么时候交付?
记录中的交付日期为 Q3 2027。
Ubud Dream 的开发商是谁?
根据本页所列来源,是 LOYO & BONDAR。
Ubud Dream 有许可证或执照吗?
我们阅读的来源中未公布许可证或执照编号。
有关于 Ubud Dream 的评价吗?
尚无经核实的买家评价。能证明购买的买家可以提交评价,经审核后发布。
来源
本页每条事实都链接到其来源。我们阅读的页面会按日期保存指纹。
- ubuddream.com https://ubuddream.com/
- loyobondar.com https://loyobondar.com/en/
- balinsky.info https://balinsky.info/en/news/construction-progress-key-stages-completed
- loyo-development.com https://loyo-development.com/lb_group
- loyobondar.com https://loyobondar.com/wp-content/uploads/presentation_eng.pdf
- palmera.realestate https://www.palmera.realestate/indonesia/developer/loyo-bondar-development/
最近核查 2026年11月1日。我们如何收集数据:数据政策。引用的事实以来源语言显示。