Kolaboro / UAE / Dubai / Imtiaz Developments
Cove Edition by Imtiaz: reviews and facts
What is published about Cove Edition by Imtiaz in Dubailand (DLRC), Dubai, Dubai, UAE, what official registers and other sources say, and what changed over time. Facts only, each with its source.
Handover date passed Promised for Q3 2026. That date passed 2 months ago (as of 18 Nov 2026). Our latest research record (checked 17 Nov 2026): under construction. imtiaz.ae Overdue handovers in Dubai
Is it safe? What we know and what we do not: Known: permit, company, handover date, construction, website, official lists.
Six checks at a glance
- Permitconfirmed in a register
- Companylegal name published
- Handover datedate passed 2 mo. ago
- Constructiondeveloper updates only
- Websitesome checks not passed
- Official listsno match on sanctions and warning lists
What each colour means
- Green: published or confirmed.
- Amber: partly.
- Red: not published or the date passed.
- Grey: not checked yet.
Facts, not a verdict.
Cove Edition by Imtiaz is listed as under construction in Dubai, UAE, by Imtiaz Developments. The handover date on record is Q3 2026. That date passed 2 months ago, according to our records. A permit number is published. Transparency score: 86 of 100, rank 31 of 482 in Dubai. 6 of 13 developer claims we tested are confirmed.
Official register: Permit or licence number, Deposit protection, Construction progress · Not found: Floor or site plans, Developer track record, No guaranteed returns
- 3 sources: 2 official register, 1 developer. Sources
- Permit check: the register entry 3248 (Dubai DLD project register (published on dubairealestateiq.com), looked up 18 Nov 2026) appears in the number the developer publishes. Official register
- Reviewed on 18 Nov 2026 under review checklist n27 and method version 1.0: a desk review of public sources, no site visit. Accountable for data and method: Ignacio Hojas García-Plaza.
- Current until 16 Feb 2027: a review older than 90 days is marked out of date here.
- What we cannot know from public sources · Who pays us, conflicts of interest
- Something wrong? Use the flag button next to any line, or write to hello@kolaboro.com.
All key facts
- Developer
- Imtiaz Developments imtiaz.ae
- Location
- Dubailand (DLRC), Dubai, Dubai, UAE
- Stage
- under construction imtiaz.ae
- Handover on record
- Q3 2026 imtiaz.ae
- Permit or licence number
- DLD project registration 3248 imtiaz.ae
- DLD register
- project 3248 · Active
90.22 % built at the DLD inspection of 12 Oct 2026
182 units
completion date on the register: 25 Aug 2026
registered with the DLD: 16 Sept 2024 dubairealestateiq.com - Deposit protection
- stated imtiaz.ae
- Page we read
- imtiaz.ae imtiaz.ae
- Last checked
- 17 Nov 2026
- Open data record
- DXB-206
Ranked #31 of 482 for transparency in Dubai
One email when what is published about Cove Edition by Imtiaz changes: handover date, prices, documents or register results. Alert emails start once our sending opens; we confirm your address now.
Free: a PDF report of Cove Edition by Imtiaz with every fact and its source. The link appears here once you add your email. Download the free PDF report
We send a link to confirm first. Every email has a link to stop.
In short
- Cove Edition by Imtiaz is listed as under construction in Dubailand (DLRC), Dubai, Dubai, UAE, by Imtiaz Developments. imtiaz.ae
- The handover date on record is Q3 2026. imtiaz.ae
- That date passed 2 months ago, according to our records. promise tracker
- A permit or licence number is published. imtiaz.ae
- Of 13 developer claims we checked: 6 confirmed by a register or an independent source, 7 not yet verified, 0 contradicted by another source. Open data record
Is Cove Edition by Imtiaz legit? What we could check
Transparency score 86 of 100, computed on 18 Nov 2026 from public sources. kolaboro.com
What is published and checkable about Cove Edition by Imtiaz, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.
Published or confirmed: 7 of 10 items we could check.
- Developer identified by legal name: Legal name: Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) 10 of 10
- Developer found in an official company register: Not found in GLEIF by exact legal name 0 of 5GLEIF
- Permit or licence number published: Number published: DLD project registration 3248 15 of 15
- Permit confirmed by a register or independent source: Confirmed (registry) 5 of 5kolaboro.com
- Handover date published: Published: Q3 2026 10 of 10
- Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
- Deposit protection stated: Escrow, bank guarantee or insurance stated 15 of 15
- Address or plot location published: Precise enough for a map pin 10 of 10
- Developer website health: answers; valid TLS certificate; domain expiry within 60 days or unknown; lookalike-domain notice on record 7 of 10kolaboro.com
- Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
- Price published: No price in the pages we read 0 of 5
- page we read: imtiaz.ae Kolaboro
How much does Cove Edition by Imtiaz cost?
- Prices and payment plan as published on the pages we read (copy of 17 Nov 2026). imtiaz.ae
- Asking price: not published in the pages we read.
- Registered sales from AED 1,000,000 to AED 1,100,000 (DLD, 18 Feb 2026 - 12 Mar 2026) dubairealestateiq.com
- Permit authority: Dubai Land Department (project register) imtiaz.ae
- Construction start: August 2024 imtiaz.ae
- Handover promised: Q3 2026 imtiaz.ae
- 5 statements of the developer or listing are compared with the records in "Developer claims we tested".
Payment plan of Cove Edition by Imtiaz
- Payment plan: • 50/50 Plan: 20% on booking, followed by construction-linked installments, with 50% payable on completion in June 2026 imtiaz.ae
- Page read on 17 Nov 2026.
Total cost to buy at Cove Edition by Imtiaz: taxes and fees
Purchase taxes and fees in UAE, each with its source. Typical figures, not advice: confirm them with your notary or lawyer.
- Dubai Land Department transfer fee: 4 % hausandhaus.com
- Registration trustee fee: AED 2,100 / 4,200 propertyfinder.ae
- Title deed and admin fees: AED 270
- Notary, lawyer, agent, bank and other registration fees: not published in our guide. Ask for a written quote.
The published price is in another currency, so no amount is worked out here.
Work it out with your own figures · Taxes and fees on buying off-plan in Dubai
Can foreigners buy at Cove Edition by Imtiaz, and can it be let to tourists?
- What the law says (UAE): Dubai Law No. 7 of 2006, Article 4: ownership is for UAE and GCC nationals and their companies; other foreigners may, with the Ruler’s approval and only in areas he designates, hold freehold without time limit, or usufruct or leasehold for up to 99 years. Dubai Law No. 7 of 2006, Art. 4 (14 Nov 2026)
- Short lets, Dubai: No one may lease out holiday homes regularly unless licensed by the tourism department (DTCM in the decree, now the Department of Economy and Tourism). The licence lasts one year and is renewable. Government of Dubai
Prices over time
We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON
Rent and resale near the site
Can you legally short-let here?
What the official source we read says. Rules change and cities add their own, so check the source before you count on short-let income.
| Where | Licence or registration | Caps or zones | Nights and stays | Building and owners |
|---|---|---|---|---|
| Dubai | No one may lease out holiday homes regularly unless licensed by the tourism department (DTCM in the decree, now the Department of Economy and Tourism). The licence lasts one year and is renewable. Government of Dubai, law of 24 Nov 2013 | Not stated in the official sources we read | Holiday homes may be leased on a daily, weekly, monthly or annual basis. Units must be leased whole, not as separate rooms or bed spaces. Government of Dubai, law of 24 Nov 2013 | Not stated in the official sources we read |
Price per m² against official data
No official comparison available for this project. The developer does not publish both a starting price and a unit size (no price found), so there is no price per m² to compare.
Compared only with official open data (registered sale prices or official appraised values). How we use data.
When will Cove Edition by Imtiaz be completed?
Handover on record: Q3 2026, as seen on imtiaz.ae on 17 Nov 2026.
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover date on record: Q3 2026. Not moved in our records. imtiaz.ae
- No dated promise found in the sources we read.
- Handover date on record passed 2 months ago (our overdue watcher). promise tracker
Delivery forecast
Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.
No dated handover promise in our records, so there is no forecast.
Where it should be by now
By today (18 Nov 2026), the developer's own schedule says:
- Handover or completion: due by Q3 2026 (2 months ago).
Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself
Dated promises on record: 2, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.
Permits and licences
Permit or licence number DLD project registration 3248, published by imtiaz.ae.
- Number published: DLD project registration 3248. imtiaz.ae
- Registered as DLD project 3248, status Active, on the DLD project register (register read 18 Nov 2026, published on dubairealestateiq.com; read 18 Nov 2026) imtiaz.ae
- Official register check: Dubai DLD project register (published on dubairealestateiq.com), project registration: active, project 3248, completion on the register 25 Aug 2026, 90.22% built at the DLD inspection of 12 Oct 2026 (checked 18 Nov 2026). kolaboro.com/registers
- Official register for Dubai: DLD Project Status Enquiry (opens in a browser, checked 13 Nov 2026) dubailand.gov.ae
Live check in the official registers
Asks the official registers of this country now. Each answer is hashed (SHA-256).
Where is Cove Edition by Imtiaz?
Location as published: Dubailand (DLRC), Dubai, Dubai, on imtiaz.ae (checked 17 Nov 2026).
- Area as published: Dubailand (DLRC), Dubai, Dubai, UAE. imtiaz.ae
- Pin on the map: from a published address or coordinates. imtiaz.ae




Map © OpenStreetMap contributors. Pin as recorded.
The six buyer checks
4 of 6 buyer checks public, 3 confirmed by a register or an independent source (checked 17 Nov 2026). kolaboro.com
Public means the information is published. The level says who confirms it. Method: how we score.
| Check | Public | Who confirms it | What we found |
|---|---|---|---|
| Permit or licence number | yes | confirmed in an official register | Registered as DLD project 3248, status Active, on the DLD project register (register read 18 Nov 2026, published on dubairealestateiq.com; read 18 Nov 2026) imtiaz.ae |
| Deposit protection | yes | confirmed in an official register | DLD register: escrow account bank First Abu Dhabi Bank (register read 18 Nov 2026, published on dubairealestateiq.com) imtiaz.ae |
| Construction progress | yes | confirmed in an official register | DLD inspection of 12 Oct 2026: 90.22% built (DLD project register, published on dubairealestateiq.com, register read 18 Nov 2026) imtiaz.ae |
| Floor or site plans | no | not published | |
| Developer track record | no | not published | |
| No guaranteed returns | yes | not published |
Developer claims we tested
Reviewed on 18 Nov 2026: developer page or official register read, register looked up, handover date checked.
| What the developer or listing says | What the records show |
|---|---|
| "ESTIMATED COMPLETION DATE Q3 2026"; construction progress shown as 95 overall on the developer page (undated) imtiaz.ae developer | not verified yet |
| Studios, 1-bedroom and 2-bedroom apartments as listed on the developer page imtiaz.ae developer | not verified yet |
| Payment plans published: 50/50 with 50% payable on completion in June 2026, or a 3-year post-handover plan imtiaz.ae developer | not verified yet |
| Map embedded on the developer page points to 25.09025, 55.36589 imtiaz.ae developer | not verified yet |
| DLD project register row for "Cove Edition Residence 1 by Imtiaz" (DLD project 3248, Dubai Land Residence Complex): completion date on the register 25 Aug 2026, 66.5% built at the DLD inspection of 13 Jul 2026 (register read 13 Oct 2026 as mirrored on dubairealestateiq.com, page read 17 Nov 2026) dubairealestateiq.com official register | not verified yet |
| Pin: 25.090253, 55.365893 (map embedded on the developer page); coordinates as published on the source page imtiaz.ae developer | not verified yet |
| DLD project register: project 3248, status Active, completion date on the register 25 Aug 2026, 90.22% built at the DLD inspection of 12 Oct 2026, 7 inspections on the register, start date 25 Aug 2024, registered 16 Sep 2024 (register read 18 Nov 2026 as published on dubairealestateiq.com; page read 18 Nov 2026) dubairealestateiq.com official register | verified Official register |
| Registered developer entity on the DLD register: Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) dubairealestateiq.com official register | verified Official register |
| 182 units on the DLD register dubairealestateiq.com official register | verified Official register |
| Escrow account bank on the DLD register: First Abu Dhabi Bank dubairealestateiq.com official register | verified Official register |
| DLD registered sales, Nov 2025 to Oct 2026: 5 sales, median home price AED 1,000,000 (registered sale prices, not asking prices; sales to 2 Nov 2026) dubairealestateiq.com official register | verified Official register |
| Latest registered home sales listed on the page (3, 18 Feb 2026 to 12 Mar 2026): AED 1,000,000 to AED 1,100,000, 992 to 992 sq ft (registered sale prices as rounded on the page, not asking prices) dubairealestateiq.com official register | verified Official register |
| Payment plan printed on the developer page (read 18 Nov 2026): "• 50/50 Plan: 20% on booking, followed by construction-linked installments, with 50% payable on completion in June 2026." imtiaz.ae developer | not verified yet |
What changed, with dates
Last checked 17 Nov 2026.
Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026).
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
Who is the developer of Cove Edition by Imtiaz?
Developer as published: Imtiaz Developments, on imtiaz.ae (checked 17 Nov 2026).
- Cove Edition by Imtiaz is developed by Imtiaz Developments, as published on the pages we read. Projects by Imtiaz Developments that we track: 36. imtiaz.ae
- Dated promises on record: 7; 0 kept, 0 passed without delivery, 1 moved later, 6 still ahead. promise tracker
- Legal entity: Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) imtiaz.ae
- Projects of Imtiaz Developments we track: 36 (not yet completed: 35, completed: 1). kolaboro.com
- 3 of the 36 projects by Imtiaz Developments on our record are past their handover date. Projects by Imtiaz Developments with a delay
Other Imtiaz Developments projects in Dubai
- Beach Walk Residences 4 by Imtiaz Dubai Islands
- Cove Grand by Imtiaz Dubailand Residence Complex
- The Symphony by Imtiaz Mohammed Bin Rashid City
- Sea Cliff by Imtiaz Dubai Islands
- Pearl House 4 by Imtiaz Jumeirah Village Circle (JVC)
- Wynwood Horizon Meydan Horizon, MBR City
- The Archive by Imtiaz Dubailand Residence Complex
- Cove Edition 6 Dubailand Residence Complex
- Raw District Downtown Jebel Ali, Sheikh Zayed Road
- Kore by Imtiaz Dubailand Residence Complex
- Le Blanc by Imtiaz Dubailand Residence Complex
- Enre Residence Dubai South
All facts about Imtiaz Developments Delivery record of Imtiaz Developments
Website health
We check the developer's own website once a day: whether the homepage answers, when its TLS certificate and its domain registration expire, and when it was last updated. A site that stops answering or lets its domain lapse is a reason to ask questions, not proof of anything.
Website imtiaz.ae
- The homepage answered with HTTP 200 on 18 Nov 2026 (2.4 s). homepage
- Answered on all of the last 7 daily checks. our daily checks
- Answered on 11 daily checks in a row. our daily checks
- TLS certificate expires 7 Jan 2027. certificate log
- TLS certificate issued by Let's Encrypt on 9 Oct 2026 (certificate transparency log, read 18 Nov 2026) crt.sh
- Newest date in the site's sitemap: 22 Oct 2026. sitemap
Last 11 daily checks, oldest first
Checked 18 Nov 2026. Method and data: One request to the homepage per domain per day, user agent KolaboroResearchAgent, after reading robots.txt (weekly). TLS expiry from the certificate the server presents; domain expiry from the registry RDAP record (weekly); sitemap weekly. No page text is kept.
Alternatives to Cove Edition by Imtiaz
Projects in Dubai with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 86 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works
This project publishes no price, so we cannot list alternatives by price in Dubai.
Compared side by side
Similar projects
Closest projects with a pin: Cove Edition 2 by Imtiaz (0.4 km), Cove Edition III by Imtiaz (1.2 km), Forest City 2 (1.4 km). Compare the four side by side
- Sunset Bay by Imtiaz Dubai · under construction
- Beach Walk 2 by Imtiaz Dubai · under construction
- Luxor by Imtiaz Dubai · under construction
- Cove Edition 4 by Imtiaz Dubai · under construction
Market context: Dubai
- We track 482 projects in Dubai. 96% publish a permit or licence number and 96% state deposit protection. kolaboro.com/m/dubai/
- In Dubai, 12 tracked projects are past their first handover date on record: a median of 5 months (range 1 to 50). Historical statistic from our records, not a forecast. This project: 2 months past its first date on record (Q3 2026). How this is computed
- Delay index for Dubai: the handover date on record moved for 8 of 73 projects with a dated promise; mean shift over all of them: 1.6 months; over those that moved: 15 months. kolaboro.com/handover
Buyer reviews
There are no verified buyer reviews of Cove Edition by Imtiaz yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
No reply from the developer on record (checked 17 Nov 2026).
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Questions to ask the developer about Cove Edition by Imtiaz
- What is the legal name and registration number of the company that sells the units and signs the contract?
- The handover date on record (Q3 2026) has passed. What is the new date in writing, and what compensation does the contract give?
- Can you send dated photos or the latest inspection report of the construction?
- Who owns the land, and can I see the title or lease document?
Before you pay
Before you sign: your checklist for UAE
Tick each step as you do it. Your ticks stay in this browser only.
Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are being set up.
What next
- Compare with similar projects
- Alert me if the date or price changes
- Ask the developer
- Timeline of every dated record
Share this page: WhatsApp My projects
Questions buyers ask
Is Cove Edition by Imtiaz legit?
Kolaboro does not label projects or developers. What the public record shows: A permit or licence number is published. Of 13 developer claims we checked: 6 confirmed by a register or an independent source, 7 not yet verified, 0 contradicted by another source. The handover date on record is Q3 2026. That date passed 2 months ago, according to our records. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 7 of 10 items we could check. Transparency score: 86 of 100, rank 31 of 482 in Dubai. Check the sources on this page and ask the developer for documents before paying.
Where is Cove Edition by Imtiaz?
Cove Edition by Imtiaz is in Dubailand (DLRC), Dubai, Dubai, UAE, according to the sources listed on this page. Pin on the map: from a published address or coordinates.
When will Cove Edition by Imtiaz be completed?
The handover date on record is Q3 2026. That date passed 2 months ago, according to our records.
Is Cove Edition by Imtiaz delayed?
According to our records the handover date on record passed 2 months ago. The latest handover date on record is Q3 2026.
Who is the developer of Cove Edition by Imtiaz?
Imtiaz Developments, according to the sources listed on this page. Projects by Imtiaz Developments that we track: 36. Dated promises on record: 7; 0 kept, 0 passed without delivery, 1 moved later, 6 still ahead.
Does Cove Edition by Imtiaz have a permit or licence?
A permit or licence is confirmed in an official register (see Permits and licences).
What do buyers say about Cove Edition by Imtiaz?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
How much does Cove Edition by Imtiaz cost?
Asking price: not published in the pages we read. Registered sales from AED 1,000,000 to AED 1,100,000 (DLD, 18 Feb 2026 - 12 Mar 2026).
What is the payment plan of Cove Edition by Imtiaz?
Payment plan as published: • 50/50 Plan: 20% on booking, followed by construction-linked installments, with 50% payable on completion in June 2026. Ask the developer for the current terms before paying.
What is the transparency score of Cove Edition by Imtiaz?
Transparency score: 86 of 100, rank 31 of 482 in Dubai. It counts what is published and checkable, not quality.
When was Cove Edition by Imtiaz last checked, and what changed?
Last checked 17 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026). No change to the published facts is recorded.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- imtiaz.ae developer
- dubairealestateiq.com /developer/imtiaz official register
- dubairealestateiq.com /project/cove-edition-residence-1-by-imtiaz official register
- Earlier copies of the tracked page in the Internet Archive: first 6 Aug 2024, latest 13 Jul 2026. all copies
Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate
Last checked 17 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.