Shipping daily
Changelog →

Kolaboro / UAE / Dubai / SAMANA Developers

SAMANA Ocean Pearl 2: reviews and facts

What is published about SAMANA Ocean Pearl 2 in Dubai Islands, Dubai, Dubai, UAE, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Is it safe? What we know and what we do not: Known: permit, company, handover date, construction, website, official lists.

Six checks at a glance

What each colour means
  • Green: published or confirmed.
  • Amber: partly.
  • Red: not published or the date passed.
  • Grey: not checked yet.

Facts, not a verdict.

SAMANA Ocean Pearl 2 is listed as under construction in Dubai Islands, Dubai, Dubai, UAE, by SAMANA Developers. The handover date on record is Q4 2027. A permit number is published. Transparency score: 83 of 100, rank 13 of 23 in Dubai Islands. 6 of 10 developer claims we tested are confirmed. There are no verified buyer reviews yet.

Did you buy here? Tell us

Official register: Permit or licence number, Deposit protection, Construction progress · Not found: Floor or site plans, Developer track record, No guaranteed returns
All key facts
Location
Dubai Islands, Dubai, Dubai, UAE
Stage
under construction samanadevelopers.com
Handover on record
Q4 2027 samanadevelopers.com
Permit or licence number
DLD project registration 3238 samanadevelopers.com
DLD register
project 3238 · Active
23.3 % built at the DLD inspection of 17 Sept 2026
96 units
completion date on the register: 31 Mar 2027
registered with the DLD: 5 Nov 2024 dubairealestateiq.com
Deposit protection
stated samanadevelopers.com
Page we read
samanadevelopers.com samanadevelopers.com
Last checked
17 Nov 2026
Open data record
DXB-220

Ranked #13 of 23 for transparency in Dubai Islands · Ranked #55 of 482 for transparency in Dubai

Alert me if the date or price changes

One email when what is published about SAMANA Ocean Pearl 2 changes: handover date, prices, documents or register results. Alert emails start once our sending opens; we confirm your address now.

Free: a PDF report of SAMANA Ocean Pearl 2 with every fact and its source. The link appears here once you add your email.

We send a link to confirm first. Every email has a link to stop.

Follow changes in a feed reader: Atom JSON Feed API

In short

  • SAMANA Ocean Pearl 2 is listed as under construction in Dubai Islands, Dubai, Dubai, UAE, by SAMANA Developers. samanadevelopers.com
  • The handover date on record is Q4 2027. samanadevelopers.com
  • A permit or licence number is published. samanadevelopers.com
  • Of 10 developer claims we checked: 6 confirmed by a register or an independent source, 4 not yet verified, 0 contradicted by another source. Open data record

Is SAMANA Ocean Pearl 2 legit? What we could check

Transparency score 83 of 100, computed on 18 Nov 2026 from public sources. kolaboro.com

kolaboro.com

What is published and checkable about SAMANA Ocean Pearl 2, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.

Published or confirmed: 8 of 10 items we could check.

  • Developer identified by legal name: Legal name: Samana Star Real Estate Development L.L.C (DLD developer 1688) 10 of 10
  • Developer found in an official company register: Not found in GLEIF by exact legal name 0 of 5GLEIF
  • Permit or licence number published: Number published: DLD project registration 3238 15 of 15
  • Permit confirmed by a register or independent source: Confirmed (registry) 5 of 5kolaboro.com
  • Handover date published: Published: Q4 2027 10 of 10
  • Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
  • Deposit protection stated: Escrow, bank guarantee or insurance stated 15 of 15
  • Address or plot location published: No precise address or plot location published 0 of 10
  • Developer website health: answers; valid TLS certificate; domain registered for 60+ days more; no lookalike-domain notice 10 of 10kolaboro.com
  • Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
  • Price published: Price published 5 of 5
  • page we read: samanadevelopers.com Kolaboro

How the transparency score is made

How much does SAMANA Ocean Pearl 2 cost?

Payment plan of SAMANA Ocean Pearl 2

  • No payment plan was published on the pages we read (read on 17 Nov 2026).

Unit types, sizes and floor plans of SAMANA Ocean Pearl 2

Unit typesSizePrice fromPrice per m² (from)Median in Dubai
2-bedroom apartment, 3-bedroom apartment, 4-bedroom apartment147 - 183 m²AED 4,278,811AED 29,108AED 23,936

Starting price divided by the smallest size, as published; not per unit type. Median of 88 projects in Dubai with both figures, same currency.

Total cost to buy at SAMANA Ocean Pearl 2: taxes and fees

Purchase taxes and fees in UAE, each with its source. Typical figures, not advice: confirm them with your notary or lawyer.

  • Dubai Land Department transfer fee: 4 % · AED 171,152 hausandhaus.com
  • Registration trustee fee: AED 2,100 / 4,200 · AED 4,200 propertyfinder.ae
  • Title deed and admin fees: AED 270
  • Notary, lawyer, agent, bank and other registration fees: not published in our guide. Ask for a written quote.

On the published "from" price of AED 4,278,811: about AED 175,622 in these taxes and fees, about AED 4,454,433 in total.

Work it out with your own figures · Taxes and fees on buying off-plan in Dubai

Can foreigners buy at SAMANA Ocean Pearl 2, and can it be let to tourists?

  • What the law says (UAE): Dubai Law No. 7 of 2006, Article 4: ownership is for UAE and GCC nationals and their companies; other foreigners may, with the Ruler’s approval and only in areas he designates, hold freehold without time limit, or usufruct or leasehold for up to 99 years. Dubai Law No. 7 of 2006, Art. 4 (14 Nov 2026)
  • Short lets, Dubai: No one may lease out holiday homes regularly unless licensed by the tourism department (DTCM in the decree, now the Department of Economy and Tourism). The licence lasts one year and is renewable. Government of Dubai

Prices over time

We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON

Price history of Dubai: 48 projects compared

Rent and resale near the site

Can you legally short-let here?

What the official source we read says. Rules change and cities add their own, so check the source before you count on short-let income.

WhereLicence or registrationCaps or zonesNights and staysBuilding and owners
Dubai
No one may lease out holiday homes regularly unless licensed by the tourism department (DTCM in the decree, now the Department of Economy and Tourism). The licence lasts one year and is renewable. Government of Dubai, law of 24 Nov 2013
Not stated in the official sources we read
Holiday homes may be leased on a daily, weekly, monthly or annual basis. Units must be leased whole, not as separate rooms or bed spaces. Government of Dubai, law of 24 Nov 2013
Not stated in the official sources we read

All places and sources

Price per m² against official data

  • Project, as advertised: AED 29108 per m² (starting price AED 4278811 divided by the smallest unit size 147 m²; the cheapest unit may not be the smallest) developer page

No official comparison available for this project. We could not match this project or its area to a Dubai Land Department project or area name, so we do not guess.

Compared only with official open data (registered sale prices or official appraised values). How we use data.

When will SAMANA Ocean Pearl 2 be completed?

Handover on record: Q4 2027, as seen on samanadevelopers.com on 17 Nov 2026.

samanadevelopers.com

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover date on record: Q4 2027. Not moved in our records. samanadevelopers.com
  • No dated promise found in the sources we read.

Delivery forecast

Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.

No dated handover promise in our records, so there is no forecast.

Where it should be by now

By today (18 Nov 2026), the developer's own schedule says:

  • Construction start: due by January 2024 (2 years ago).
  • Next on the schedule: Handover or completion, Q4 2027 (in 11 months).

Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself

Dated promises on record: 2, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.

Permits and licences

Permit or licence number DLD project registration 3238, published by samanadevelopers.com.

samanadevelopers.com

  • Number published: DLD project registration 3238. samanadevelopers.com
  • Registered as DLD project 3238, status Active, on the DLD project register (register read 18 Nov 2026, published on dubairealestateiq.com; read 18 Nov 2026) samanadevelopers.com
  • Official register check: Dubai DLD project register (published on dubairealestateiq.com), project registration: active, project 3238, completion on the register 31 Mar 2027, 23.3% built at the DLD inspection of 17 Sep 2026 (checked 18 Nov 2026). kolaboro.com/registers
  • Official register for Dubai: DLD Project Status Enquiry (opens in a browser, checked 13 Nov 2026) dubailand.gov.ae

Live check in the official registers

Asks the official registers of this country now. Each answer is hashed (SHA-256).

Where is SAMANA Ocean Pearl 2?

Location as published: Dubai Islands, Dubai, Dubai, on samanadevelopers.com (checked 17 Nov 2026).

samanadevelopers.com

The six buyer checks

4 of 6 buyer checks public, 3 confirmed by a register or an independent source (checked 17 Nov 2026). kolaboro.com

kolaboro.com

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numberyesconfirmed in an official registerRegistered as DLD project 3238, status Active, on the DLD project register (register read 18 Nov 2026, published on dubairealestateiq.com; read 18 Nov 2026) samanadevelopers.com
Deposit protectionyesconfirmed in an official registerDLD register: escrow account bank First Abu Dhabi Bank (register read 18 Nov 2026, published on dubairealestateiq.com) samanadevelopers.com
Construction progressyesconfirmed in an official registerDLD inspection of 17 Sep 2026: 23.3% built (DLD project register, published on dubairealestateiq.com, register read 18 Nov 2026) samanadevelopers.com
Floor or site plansnonot published
Developer track recordnonot published
No guaranteed returnsyesnot published

Developer claims we tested

Reviewed on 18 Nov 2026: developer page or official register read, register looked up, handover date checked.

What the developer or listing saysWhat the records show
Developer page FAQ: "The anticipated handover date for SAMANA Ocean Pearl 2 is Q4 2027." samanadevelopers.com
developer
not verified yet
Unit types on the developer page: SAMANA Ocean Pearl 2 offers 1-, 2-, 3-and 4-bedroom apartments from 843 sq ft. samanadevelopers.com
developer
not verified yet
Starting price printed on the developer page: AED 4,278,811 (marked with an asterisk) samanadevelopers.com
developer
not verified yet
DLD project register row for "Ocean Pearl 2 by Sd" (DLD project 3238, Palm Deira): completion date on the register 31 Mar 2027, 23.3% built at the DLD inspection of 17 Sep 2026 (register read 13 Oct 2026 as mirrored on dubairealestateiq.com, page read 17 Nov 2026) dubairealestateiq.com
official register
not verified yet
DLD project register: project 3238, status Active, completion date on the register 31 Mar 2027, 23.3% built at the DLD inspection of 17 Sep 2026, 6 inspections on the register, start date 12 Jan 2024, registered 5 Nov 2024 (register read 18 Nov 2026 as published on dubairealestateiq.com; page read 18 Nov 2026) dubairealestateiq.com
official register
verified Official register
Registered developer entity on the DLD register: Samana Star Real Estate Development L.L.C (DLD developer 1688) dubairealestateiq.com
official register
verified Official register
96 units on the DLD register dubairealestateiq.com
official register
verified Official register
Escrow account bank on the DLD register: First Abu Dhabi Bank dubairealestateiq.com
official register
verified Official register
DLD registered sales, Nov 2025 to Oct 2026: 4 sales, median home price AED not shown (registered sale prices, not asking prices; sales to 2 Nov 2026) dubairealestateiq.com
official register
verified Official register
Latest registered home sales listed on the page (3, 9 Mar 2026 to 13 Aug 2026): AED 3,500,000 to AED 4,100,000, 1,582 to 1,972 sq ft (registered sale prices as rounded on the page, not asking prices) dubairealestateiq.com
official register
verified Official register

What changed, with dates

Last checked 17 Nov 2026.

Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026).

    Public reports

    What public sources report, with the link. We list reports; we do not judge the developer.

    • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

    Who is the developer of SAMANA Ocean Pearl 2?

    Developer as published: SAMANA Developers, on samanadevelopers.com (checked 17 Nov 2026).

    samanadevelopers.com

    • SAMANA Ocean Pearl 2 is developed by SAMANA Developers, as published on the pages we read. Projects by SAMANA Developers that we track: 41. samanadevelopers.com
    • Dated promises on record: 9; 0 kept, 0 passed without delivery, 0 moved later, 9 still ahead. promise tracker
    • Legal entity: Samana Star Real Estate Development L.L.C (DLD developer 1688) samanadevelopers.com
    • Projects of SAMANA Developers we track: 41 (not yet completed: 41, completed: 0). kolaboro.com
    • None of the 41 projects by SAMANA Developers on our record is past its handover date.

    Other SAMANA Developers projects in Dubai

    All facts about SAMANA Developers Delivery record of SAMANA Developers

    Website health

    We check the developer's own website once a day: whether the homepage answers, when its TLS certificate and its domain registration expire, and when it was last updated. A site that stops answering or lets its domain lapse is a reason to ask questions, not proof of anything.

    Website samanadevelopers.com

    • The homepage answered with HTTP 200 on 18 Nov 2026 (2.5 s). homepage
    • Answered on all of the last 7 daily checks. our daily checks
    • Answered on 11 daily checks in a row. our daily checks
    • TLS certificate expires 12 Jan 2027. certificate log
    • Domain registration expires 8 Jun 2031. registry RDAP
    • Domain registered on 8 Jun 2015 (11 years before our check), registry RDAP, read 17 Nov 2026 registry RDAP
    • TLS certificate issued by Let's Encrypt on 14 Oct 2026 (certificate transparency log, read 18 Nov 2026) crt.sh
    • Newest date in the site's sitemap: 11 Nov 2026. sitemap

    Last 11 daily checks, oldest first

    Checked 18 Nov 2026. Method and data: One request to the homepage per domain per day, user agent KolaboroResearchAgent, after reading robots.txt (weekly). TLS expiry from the certificate the server presents; domain expiry from the registry RDAP record (weekly); sitemap weekly. No page text is kept.

    Alternatives to SAMANA Ocean Pearl 2

    Projects in Dubai with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 83 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works

    Compared side by side

    Similar projects

    Market context: Dubai

    • We track 482 projects in Dubai. 96% publish a permit or licence number and 96% state deposit protection. kolaboro.com/m/dubai/
    • In Dubai, 12 tracked projects are past their first handover date on record: a median of 5 months (range 1 to 50). Historical statistic from our records, not a forecast. How this is computed
    • Delay index for Dubai: the handover date on record moved for 8 of 73 projects with a dated promise; mean shift over all of them: 1.6 months; over those that moved: 15 months. kolaboro.com/handover

    All projects in Dubai

    Dubai, November 2026: monthly data story

    Buyer reviews

    There are no verified buyer reviews of SAMANA Ocean Pearl 2 yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

    Reviews waiting for moderation are not shown.

    Bought here? Submit a verified review

    How we moderate reports and replies

    Right of reply

    No reply from the developer on record (checked 17 Nov 2026).

    Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

    Reply as the developer Report a correction Questions to ask the developer

    Questions to ask the developer about SAMANA Ocean Pearl 2

    1. What is the legal name and registration number of the company that sells the units and signs the contract?
    2. Is the handover date of Q4 2027 written into the contract, with a penalty if it is missed?
    3. Can you send dated photos or the latest inspection report of the construction?
    4. Who owns the land, and can I see the title or lease document?

    Prepare these questions as an email

    Before you pay

    Before you sign: your checklist for UAE

    Tick each step as you do it. Your ticks stay in this browser only.

    Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are being set up.

    Free live check Pre-purchase check, €490

    Buying off-plan in Dubai: what to check

    What next

    Share this page: WhatsApp My projects

    Questions buyers ask

    Is SAMANA Ocean Pearl 2 legit?

    Kolaboro does not label projects or developers. What the public record shows: A permit or licence number is published. Of 10 developer claims we checked: 6 confirmed by a register or an independent source, 4 not yet verified, 0 contradicted by another source. The handover date on record is Q4 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 8 of 10 items we could check. Transparency score: 83 of 100, rank 13 of 23 in Dubai Islands. Check the sources on this page and ask the developer for documents before paying.

    Where is SAMANA Ocean Pearl 2?

    SAMANA Ocean Pearl 2 is in Dubai Islands, Dubai, Dubai, UAE, according to the sources listed on this page. Pin on the map: none, because no address or coordinates precise enough are published.

    When will SAMANA Ocean Pearl 2 be completed?

    The handover date on record is Q4 2027.

    Is SAMANA Ocean Pearl 2 delayed?

    The handover date on record is Q4 2027.

    Who is the developer of SAMANA Ocean Pearl 2?

    SAMANA Developers, according to the sources listed on this page. Projects by SAMANA Developers that we track: 41. Dated promises on record: 9; 0 kept, 0 passed without delivery, 0 moved later, 9 still ahead.

    Does SAMANA Ocean Pearl 2 have a permit or licence?

    A permit or licence is confirmed in an official register (see Permits and licences).

    What do buyers say about SAMANA Ocean Pearl 2?

    There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

    How much does SAMANA Ocean Pearl 2 cost?

    The lowest price in the sources we read is AED 4,278,811. Prices are as published and can change; ask the developer for the current price list.

    What is the transparency score of SAMANA Ocean Pearl 2?

    Transparency score: 83 of 100, rank 13 of 23 in Dubai Islands. It counts what is published and checkable, not quality.

    When was SAMANA Ocean Pearl 2 last checked, and what changed?

    Last checked 17 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026). No change to the published facts is recorded.

    Sources

    Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

    1. samanadevelopers.com developer
    2. dubairealestateiq.com /developer/samana official register
    3. dubairealestateiq.com /project/ocean-pearl-2-by-sd official register

    Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate

    Last checked 17 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

    Check this project€490 · written report usually within 7 days