Nov 1DATAAll 646 projects re-verified: 6,419 developer claims tested against registers, courts and pressNov 1DATAMalaysia TEDUH and Philippines DHSUD licence checks: expired licences and approved delays foundNov 1DATAThailand ONEP register: 2 condos found selling before environmental approvalNov 1DATAMexico PROFECO contract register checks: one sales registration belonged to a laundryNov 1DATAAbu Dhabi ADREC inspections and RAK RERA permit list added: % built straight from the regulatorNov 1SHIPPEDNew stage filter: completed but still sellingNov 1SHIPPEDPublic database page: verification levels, disclosure distribution, every marketNov 1DATA+212 projects in one day, round 3: USA, Caribbean, Gulf, Africa, Japan, AustraliaNov 1SHIPPEDStage on every case: off-plan or under constructionOct 31SHIPPEDVerification level per check on every case card: registry, independent, developer, contradicted
Changelog →

Kolaboro / Projects / Mérida

XO'OK Temozon Norte (Etapa 1): reviews and facts

What is published about XO'OK Temozon Norte (Etapa 1) in Temozon Norte, Merida, Mérida, Mexico, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Location
Temozon Norte, Merida, Mérida, Mexico
Stage
off-plan pincali.com
Handover on record
2029 pincali.com
Permit or licence number
not published
Deposit protection
not researched yet
Page we read
pincali.com pincali.com
Last checked
5 Nov 2026
Open data record
MID-002

In short

  • XO'OK Temozon Norte (Etapa 1) is listed as off-plan in Temozon Norte, Merida, Mérida, Mexico, by Grupo Orve. pincali.com
  • The handover date on record is 2029. pincali.com
  • No permit or licence number is published in the sources we read. assets.easybroker.com
  • Of 11 developer claims we checked, 0 are confirmed by a register or an independent source, 9 are not yet verified and 2 are contradicted by another source. Open data record
  • The handover date moved 1 times in our records, by 21 months in total. promise tracker

What is promised

As published by the developer or on listing pages, in the wording of the source.

Delivery and delay record

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover or completion: 2029 date moved later · moved 1 times, 21 months in total
    our research record of 31 Oct 2026 · Earlier dates on record: March 2028 (31 Oct 2026) pincali.com

Permits and licences

  • No permit or licence number is published in the sources we read.
  • No permit or approval mentioned in brochure or agent listings assets.easybroker.com

Live check in the official registers

Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.

The six buyer checks

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numbernonot publishedNo permit or approval mentioned in brochure or agent listings assets.easybroker.com
Deposit protectionnonot published
Construction progressnonot publishedNo construction status published; Stage 2 towers marked 'proximamente' on master plan assets.easybroker.com
Floor or site plansnonot publishedModel sizes and level only (C, C1, C2, B); no floor-plan drawings seen assets.easybroker.com
Developer track recordyesstated only by the developerBrochure states 10,500 titled lots and 9,000+ clients since 2015, developer claim only assets.easybroker.com
No guaranteed returnsyesnot publishedMarketing speaks of 'altos rendimientos en plusvalia' but no guaranteed income or figure assets.easybroker.com

Developer claims we tested

Claim (source wording)ResultChecked againstSource
Stage 1 has 112 units in two towersnot verified yet pincali.com
Stage 1 delivery December 2028 (earlier input stated 31 Mar 2028 plus up to six months)contradicted pincali.com
Stage 2 Tower 3 delivery 2029not verified yet assets.easybroker.com
Stage 2 has 72 units (brochure also says 72 per tower)contradicted assets.easybroker.com
One-bed 36.27 m2 from MXN 1,942,621not verified yet assets.easybroker.com
Two-bed 62.15 m2 at MXN 2,940,938not verified yet pincali.com
Grupo ORVE founded 2015 in Yucatannot verified yet assets.easybroker.com
10,500 titled lots deliverednot verified yet assets.easybroker.com
Construction licence grantednot verified yet assets.easybroker.com
Buyer deposits held in escrow or trustnot verified yet assets.easybroker.com
Market growth claims (Amazon, Walmart, Gruma investments, +126% FDI)not verified yet assets.easybroker.com

What changed, with dates

Public reports

What public sources report, with the link. We list reports; we do not judge the developer.

  • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

About the developer

All facts about Grupo Orve

Similar projects

Market context: Mérida

  • We track 8 projects in Mérida. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m

All projects in Mérida

Buyer reviews

There are no verified buyer reviews of XO'OK Temozon Norte (Etapa 1) yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

Reviews waiting for moderation are not shown.

Bought here? Submit a verified review

Right of reply

Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

Reply as the developer Report a correction Questions to ask the developer

Before you pay

Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.

Free live check Pre-purchase check, €490

Questions buyers ask

Is XO'OK Temozon Norte (Etapa 1) legit?

Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 11 developer claims we checked, 0 are confirmed by a register or an independent source, 9 are not yet verified and 2 are contradicted by another source. The handover date on record is 2029. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.

When will XO'OK Temozon Norte (Etapa 1) be delivered?

The handover date on record is 2029. The handover date moved 1 times in our records, by 21 months in total.

Who is the developer of XO'OK Temozon Norte (Etapa 1)?

Grupo Orve, according to the sources listed on this page.

Does XO'OK Temozon Norte (Etapa 1) have a permit or licence?

No permit or licence number is published in the sources we read.

Are there reviews of XO'OK Temozon Norte (Etapa 1)?

There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

Sources

Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

  1. pincali.com https://www.pincali.com/en/home/depto-en-venta-merida-temozon-norte-condominio-xo-ok-mod-b...
  2. assets.easybroker.com https://assets.easybroker.com/property_files/5837047/377403/Brochure_XOOK-Torre_3-DIC25_1....
  3. lunaespecialistas.com https://www.lunaespecialistas.com/proyecto-xook
  4. luumorealestate.com https://www.luumorealestate.com/desarrollos/xook/