Shipping daily
Nov 1DATAAll 646 projects re-verified: 6,419 developer claims tested against registers, courts and pressNov 1DATAMalaysia TEDUH and Philippines DHSUD licence checks: expired licences and approved delays foundNov 1DATAThailand ONEP register: 2 condos found selling before environmental approvalNov 1DATAMexico PROFECO contract register checks: one sales registration belonged to a laundryNov 1DATAAbu Dhabi ADREC inspections and RAK RERA permit list added: % built straight from the regulatorNov 1SHIPPEDNew stage filter: completed but still sellingNov 1SHIPPEDPublic database page: verification levels, disclosure distribution, every marketNov 1DATA+212 projects in one day, round 3: USA, Caribbean, Gulf, Africa, Japan, AustraliaNov 1SHIPPEDStage on every case: off-plan or under constructionOct 31SHIPPEDVerification level per check on every case card: registry, independent, developer, contradicted
Changelog →

Kolaboro / Projects / Mérida

Casa Mitos (Torre Mitos): reviews and facts

What is published about Casa Mitos (Torre Mitos) in Vía Montejo, Prolongación Montejo con Calle 60, Mérida, Mérida, Mexico, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Location
Vía Montejo, Prolongación Montejo con Calle 60, Mérida, Mérida, Mexico
Stage
off-plan torremitos.com
Handover on record
2027 torremitos.com
Permit or licence number
not published
Deposit protection
not researched yet
Page we read
torremitos.com torremitos.com
Last checked
5 Nov 2026
Open data record
MID-003

In short

  • Casa Mitos (Torre Mitos) is listed as off-plan in Vía Montejo, Prolongación Montejo con Calle 60, Mérida, Mérida, Mexico, by Inmobilia Desarrollos. torremitos.com
  • The handover date on record is 2027. torremitos.com
  • No permit or licence number is published in the sources we read. inmobilia.mx
  • Of 8 developer claims we checked, 1 are confirmed by a register or an independent source, 6 are not yet verified and 1 are contradicted by another source. Open data record

What is promised

As published by the developer or on listing pages, in the wording of the source.

Delivery and delay record

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover or completion: 2027 date still ahead
    our research record of 31 Oct 2026 torremitos.com

Permits and licences

  • No permit or licence number is published in the sources we read.

Live check in the official registers

Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.

The six buyer checks

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numbernonot published
Deposit protectionnonot published
Construction progressnonot publishedNo progress published; launch article states 30-month construction from Nov 2024 inmobilia.mx
Floor or site plansyesstated only by the developerUnit type cards with areas and room lists on torremitos.com/departamentos inmobilia.mx
Developer track recordyesstated only by the developerEarlier towers in the same master plan named by developer inmobilia.mx
No guaranteed returnsyesstated only by the developerNo return figures or guarantees inmobilia.mx

Developer claims we tested

Claim (source wording)ResultChecked againstSource
125 units on 19 levels, 61 to 131 m2not verified yet yucatan.com.mx
Presale started 28 Nov 2024; construction to take 30 monthsnot verified yet yucatan.com.mx
Three earlier Vía Montejo towers with 450 units delivered and occupiednot verified yet yucatan.com.mx
Starting price MXN 3.3Mcontradicted torremitos.com
Agent price range MXN 5.1M to 12.2M, delivery 2027not verified yet dvelopers.mx
A Vía Montejo-based company (1416 Desarrollos Inmobiliarios, S.A. de C.V.) registered a presale adhesion contract with PROFECO (7133-2024) on 13 Nov 2024; its link to Casa Mitos is not statedverifiedregistry rpca.profeco.gob.mx
Vía Montejo won Best Mixed-Use Development in Mexico (International Property Awards 2019)not verified yet inmobilia.mx
Licences and permits obtainednot verified yet inmobilia.mx

What changed, with dates

Public reports

What public sources report, with the link. We list reports; we do not judge the developer.

  • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

About the developer

All facts about Inmobilia Desarrollos

Similar projects

Market context: Mérida

  • We track 8 projects in Mérida. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m

All projects in Mérida

Buyer reviews

There are no verified buyer reviews of Casa Mitos (Torre Mitos) yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

Reviews waiting for moderation are not shown.

Bought here? Submit a verified review

Right of reply

Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

Reply as the developer Report a correction Questions to ask the developer

Before you pay

Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.

Free live check Pre-purchase check, €490

Questions buyers ask

Is Casa Mitos (Torre Mitos) legit?

Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 8 developer claims we checked, 1 are confirmed by a register or an independent source, 6 are not yet verified and 1 are contradicted by another source. The handover date on record is 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.

When will Casa Mitos (Torre Mitos) be delivered?

The handover date on record is 2027.

Who is the developer of Casa Mitos (Torre Mitos)?

Inmobilia Desarrollos, according to the sources listed on this page.

Does Casa Mitos (Torre Mitos) have a permit or licence?

No permit or licence number is published in the sources we read.

Are there reviews of Casa Mitos (Torre Mitos)?

There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

Sources

Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

  1. torremitos.com https://torremitos.com/
  2. inmobilia.mx https://www.inmobilia.mx/proyecto/casa-mitos-en-via-montejo
  3. dvelopers.mx https://dvelopers.mx/desarrollo/casa-mitos
  4. rpca.profeco.gob.mx https://rpca.profeco.gob.mx/getDoc?p=7133-2024
  5. torremitos.com https://torremitos.com/departamentos/
  6. casamitos.com https://www.casamitos.com/
  7. inmobilia.mx https://www.inmobilia.mx/viamontejo
  8. inmobilia.mx https://www.inmobilia.mx/viamontejo/proyectos/casa-mitos
  9. yucatan.com.mx https://www.yucatan.com.mx/merida/2024/11/29/via-montejo-se-engalana.html

Archived copies of the page we read (Internet Archive)

Last checked 5 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

Protect my purchase