Nov 1DATAAll 646 projects re-verified: 6,419 developer claims tested against registers, courts and pressNov 1DATAMalaysia TEDUH and Philippines DHSUD licence checks: expired licences and approved delays foundNov 1DATAThailand ONEP register: 2 condos found selling before environmental approvalNov 1DATAMexico PROFECO contract register checks: one sales registration belonged to a laundryNov 1DATAAbu Dhabi ADREC inspections and RAK RERA permit list added: % built straight from the regulatorNov 1SHIPPEDNew stage filter: completed but still sellingNov 1SHIPPEDPublic database page: verification levels, disclosure distribution, every marketNov 1DATA+212 projects in one day, round 3: USA, Caribbean, Gulf, Africa, Japan, AustraliaNov 1SHIPPEDStage on every case: off-plan or under constructionOct 31SHIPPEDVerification level per check on every case card: registry, independent, developer, contradicted
Changelog →

Kolaboro / Projects / Cartagena

Morros Vita: reviews and facts

What is published about Morros Vita in Manzanillo del Mar, Serena del Mar, Cartagena, Cartagena, Colombia, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Location
Manzanillo del Mar, Serena del Mar, Cartagena, Cartagena, Colombia
Stage
under construction · active semana.com
Handover on record
Q4 2028 semana.com
Permit or licence number
not published
Deposit protection
stated semana.com
Page we read
semana.com semana.com
Last checked
5 Nov 2026
Open data record
CAR-001

In short

  • Morros Vita is listed as under construction in Manzanillo del Mar, Serena del Mar, Cartagena, Cartagena, Colombia, by Epic Diseño + Construcción. semana.com
  • The handover date on record is Q4 2028. semana.com
  • No permit or licence number is published in the sources we read. morrosvita.com
  • Of 10 developer claims we checked, 4 are confirmed by a register or an independent source, 4 are not yet verified and 2 are contradicted by another source. Open data record
  • The handover date moved 1 times in our records, by 6 months in total. promise tracker

What is promised

As published by the developer or on listing pages, in the wording of the source.

  • Price from: COP 549,090,000 semana.com
  • Units: 226 semana.com
  • Unit sizes: 38.5 - 236 m² semana.com
  • Unit types: 1BR, 1BR + study, 2BR, 3BR, house-type with private pool semana.com
  • Payment plan: 5% reservation, 45% during construction, 50% on delivery semana.com
  • Ownership: Foreigners may own property in Colombia directly (foreign investment registration with Banco de la Republica) semana.com
  • Service charge: Administration about COP 450,000/month for a 42.5 m2 unit (agent) semana.com
  • Permit authority: Curadurias Urbanas de Cartagena (licencia de construccion) semana.com
  • Deposit: 5% semana.com
  • Construction start: March 2026 semana.com
  • Handover promised: Q4 2028 semana.com
  • Original handover date: 2028-Q2 (agents) semana.com
  • fiduciary scheme with Alianza Fiduciaria; works started only after break-even (Nov 2025) and licence approval morrosvita.com
  • groundbreaking 12 Mar 2026, 30-month build, delivery end 2028 morrosvita.com
  • 226 apartments in a 5-storey tower plus attic (news) / 240 (agents) morrosvita.com
  • 1, 2 and 3BR from about 38.5-42.5 m2 to 236 m2; prices from COP 549m (2024) to COP 804m (Mar 2026) morrosvita.com
  • payment plan 5% reservation, 45% over up to 42 months, 50% on delivery morrosvita.com
  • track record: five finished Morros condominiums (eco, io, zoe, eos, kai) morrosvita.com
  • project company Morros Vita S.A.S., NIT 901825235 morrosvita.com

Delivery and delay record

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover or completion: Q4 2028 date moved later · moved 1 times, 6 months in total
    developer or listing page, copy of 5 Nov 2026 (SHA-256 907015c1de9d3358) · Earlier dates on record: Q2 2028 (1 Nov 2026), H2 2028 (3 Nov 2026) semana.com

Permits and licences

  • No permit or licence number is published in the sources we read.
  • News says licence approval was a precondition met before works began; no licence or curaduria resolution number published (the news items relay the promoter; counted as developer-level) morrosvita.com

Live check in the official registers

Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.

The six buyer checks

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numbernostated only by the developerNews says licence approval was a precondition met before works began; no licence or curaduria resolution number published (the news items relay the promoter; counted as developer-level) morrosvita.com
Deposit protectionyesconfirmed by an independent sourceCaracol Radio and Semana report Alianza Fiduciaria administers buyer funds and set the release conditions (break-even, licence, financing, buyer linkage) morrosvita.com
Construction progressyesconfirmed by an independent sourceGroundbreaking on 12 Mar 2026 reported by Caracol Radio and El Universal; no later % or photo log found morrosvita.com
Floor or site plansnonot publishedOnly typologies and sizes (e.g. Type B 58.4 m2, Type C 65.2 m2) on portals; no floor plans seen morrosvita.com
Developer track recordyesconfirmed by an independent sourceCaracol Radio reports five finished Morros projects and 1,300 apartments across eight projects; Park I due for delivery July 2026 morrosvita.com
No guaranteed returnsyesnot publishedMarketing mentions valorisation; no yield figure or guarantee morrosvita.com

Developer claims we tested

Claim (source wording)ResultChecked againstSource
Funds administered by Alianza Fiduciaria with release conditionsverifiedindependent caracol.com.co
Break-even reached in November 2025verifiedindependent caracol.com.co
Construction licence approved before startverifiedindependent semana.com
Works started March 2026 (news) vs 'began construction in March 2025' (developer site)contradictedindependent epicconstructora.com
Delivery end 2028 (news) vs June 2028 (agents)not verified yet habitarcaribe.com
226 apartments (news) vs 240 apartments (agents)contradictedindependent nicanorcarazorealtor.com
Five Morros projects finished (eco, io, zoe, eos, kai)verifiedindependent caracol.com.co
Project company Morros Vita S.A.S. registered, NIT 901825235not verified yet empresite.eleconomistaamerica.co
Prices from COP 638m (Jan 2025) rising to COP 804m (Mar 2026)not verified yet eltiempo.com
Epic has about 40 projects and 40+ years of experiencenot verified yet semana.com

What changed, with dates

  • 5 Nov 2026 · Hourly page check: handover now promised for 2028 on the developer page (was H2 2028 when we last read it on 5 Nov) (SHA-256 907015c1de9d3358...) semana.com
  • 5 Nov 2026 · Hourly page check: developer page says permits are obtained but publishes no permit number (checked 08:05 UTC) (SHA-256 0b37e61077d1cf88...) semana.com
  • 1 Nov 2026: plans published: - to no semana.com
  • 31 Oct 2026: plans published: no to - semana.com
  • Fingerprint of the developer page text on 5 Nov 2026: SHA-256 907015c1de9d3358.... Anyone can check it on kolaboro.com/verify. kolaboro.com/verify

Public reports

What public sources report, with the link. We list reports; we do not judge the developer.

  • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

About the developer

  • Head office: Cartagena, Colombia semana.com
  • Legal entity: EPIC Constructora S.A.S.; project company Morros Vita S.A.S. (NIT 901825235) semana.com
  • Projects delivered: 5 semana.com
  • Caracol Radio reports five finished Morros projects and 1,300 apartments across eight projects; Park I due for delivery July 2026 semana.com

All facts about Epic Diseño + Construcción

Similar projects

Market context: Cartagena

  • We track 1 projects in Cartagena. 0% publish a permit or licence number and 100% state deposit protection. kolaboro.com/m

All projects in Cartagena

Buyer reviews

There are no verified buyer reviews of Morros Vita yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

Reviews waiting for moderation are not shown.

Bought here? Submit a verified review

Right of reply

Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

Reply as the developer Report a correction Questions to ask the developer

Before you pay

Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.

Free live check Pre-purchase check, €490

Questions buyers ask

Is Morros Vita legit?

Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 10 developer claims we checked, 4 are confirmed by a register or an independent source, 4 are not yet verified and 2 are contradicted by another source. The handover date on record is Q4 2028. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.

When will Morros Vita be delivered?

The handover date on record is Q4 2028. The handover date moved 1 times in our records, by 6 months in total.

Who is the developer of Morros Vita?

Epic Diseño + Construcción, according to the sources listed on this page.

Does Morros Vita have a permit or licence?

No permit or licence number is published in the sources we read.

Are there reviews of Morros Vita?

There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

Sources

Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

  1. semana.com https://www.semana.com/mejor-colombia/articulo/nuevo-proyecto-inmobiliario-en-cartagena-as...
  2. morrosvita.com https://www.morrosvita.com/es/inicio
  3. caracol.com.co https://caracol.com.co/2026/03/16/morros-vita-asi-sera-el-ultimo-proyecto-en-la-linea-de-p...
  4. empresite.eleconomistaamerica.co https://empresite.eleconomistaamerica.co/MORROS-7-SAS.html
  5. habitarcaribe.com https://habitarcaribe.com/suite-venta-serena-del-mar-cartagena-de-indias/9014126
  6. inmobiliariotu360.bancolombia.com https://inmobiliariotu360.bancolombia.com/proyecto-de-vivienda-morros-vita/p
  7. nicanorcarazorealtor.com https://nicanorcarazorealtor.com/apartamento-venta-zona-norte-serena-del-mar-cartagena-de-...
  8. serenadelmar.com.co https://serenadelmar.com.co/properties/morros-vita/
  9. eltiempo.com https://www.eltiempo.com/mas-contenido/morros-vita-inicia-construccion-3540702
  10. eltiempo.com https://www.eltiempo.com/mas-contenido/morros-vita-una-expresion-elevada-de-estilo-de-vida...
  11. eluniversal.com.co https://www.eluniversal.com.co/sociales/2026/03/21/inicio-de-la-construccion-de-morros-vit...
  12. epicconstructora.com https://www.epicconstructora.com/es/morros-vita
  13. semana.com https://www.semana.com/hablan-las-marcas/articulo/morros-estrena-nuevo-proyecto-de-viviend...

Archived copies of the page we read (Internet Archive)

Last checked 5 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.