Nouveau chaque jour
Nov 12SHIPPEDTransparency rankings for 30 islands and 30 cities: every tracked off-plan project scored 0 to 100 on what is published and checkable (legal name, permit, handover date and its record, deposit protection, location, website, official lists), with the method and weights public, a source on every line, a right of reply on every row and the full analysis by email on request; Sumba is ranked with a disclosure, and the founder's own project there is excludedNov 12DATA27 more projects added in 11 countries of the Americas and Asia-Pacific, filling markets the previous batch left empty: the Dominican Republic, Panama, Mexico, Belize, the Bahamas, Vietnam, Indonesia and Fiji, plus Texas, New York, California, Colombia and Sri Lanka (1,294 tracked in total): 13 have a handover date as the developer publishes it and 9 have a map pin from the developer's own map, page data or address; every fact has a source link and none is reviewed or scored yetNov 12SHIPPEDError sweep after the 11 November release: market pages no longer jump while they load (layout shift 1.5 to 0), the sealed X-ray page holds its place too, stale totals removed from the French and Russian home pages and the database page in 8 languages, one airport route that ran on an airfield service road taken out of the distance check, the Berlin short-let rule linked to the official page that is online, 26 broken links on translated pages repaired (payment email check, market pages, booking), the verify page now says its file list is weekly, singular forms in the bulk check, and the deploy guard's browser set-up repairedNov 12DATA33 more projects added in 11 countries across the Americas and Asia-Pacific, from Canada, the USA, Brazil and Colombia to Japan, Malaysia, the Philippines, Australia and New Zealand (1,267 tracked in total): 25 have a handover date as the developer publishes it and 12 have a map pin from the developer's own map or address; every fact has a source link and none is reviewed or scored yetNov 12DATA60 more projects added in 17 countries across Europe, the Middle East and Africa, from France, Germany and Spain to the UAE, Oman, Egypt, Kenya and South Africa (1,234 tracked in total): 43 have a handover date as the developer publishes it and 25 have a map pin from the developer's own map or address; every fact has a source link and none is reviewed or scored yetNov 11SHIPPEDDeveloper pages now list official gazette notices about the developer's company when it is identified by its exact legal name: Spain's BORME (every daily issue of the last 12 months), France's BODACC (by SIREN number) and The Gazette in the UK, with notice type, date and link; no names of people are copiedNov 11SHIPPEDAround the site: project pages with a reliable pin now show the nearest sea, beach, airport, runway end, hospital, school, supermarket and transport stop from OpenStreetMap, and the yearly PM2.5 and NO2 of the Copernicus atmosphere modelNov 11SHIPPEDDistance claims check: distances and travel times stated on the project page we track are quoted from our sealed copy next to the straight-line and road distance measured from the pinNov 11SHIPPEDClimate at the plot: hot days, warm nights, yearly rain and heavy-rain days for 1995 to 2014 against 2040 to 2059, with the range across climate models (World Bank CMIP6 data)Nov 11SHIPPED39 developer pages of listed companies now show the exchange, the ticker and a link to the official filings, with the latest annual report date for those filing with the US SEC. No share prices, no adviceNov 11SHIPPEDStricter script rules on every page: a script runs only when our own page loaded it, so injected code is blocked by the browser; tested first on 271 pages, every tool, the portal and the adminNov 11DATA50 more projects added in 21 countries, from the UAE, Spain and the UK to Australia, Malaysia and Greece (1,174 tracked in total): each has its developer page, the handover date as published or "not published", and a source link for every fact; none is reviewed or scored yetNov 11SHIPPEDCan you legally short-let there? Project pages and a new guide show licence or registration, caps and zones, night limits and building rules for 23 places, each linked to the official source and its dateNov 11SHIPPEDDeveloper pages now compare the company name with official regulator warning lists of unauthorised firms (FCA, AMF, MAS, SFC, FINMA, Central Bank of Ireland, SEC) and show a no-match result with each list's date; possible matches go to a private review and are never publishedNov 11SHIPPEDAccessibility pass on 271 pages with an automated checker: charts and status strips are announced correctly, sideways-scrolling boxes work from the keyboard, small links are easier to tap; Russian pages use the right word form after numbers; project links open the project page directlyNov 11SHIPPEDProject pages now say where the developer's own schedule puts the project today, and the promised dates download as a calendar file (.ics) or a subscription that updates when a date moves; the portal exports your payment schedule the same way
Nouveautés →

Kolaboro / Classements / Transparence / Nairobi

Projets sur plan les plus transparents à Nairobi

Le score de transparence mesure ce qui est publié et vérifiable pour chaque projet, à partir de faits sourcés. Ce n'est pas une note de qualité, de sécurité ou de valeur. « Non publié » signifie que nous n'avons trouvé aucune source publique.

9projets notés
33score de transparence médian
0%publient un numéro de permis ou de licence
89%publient une date de livraison
0%indiquent une protection du dépôt

Données lues le 12 novembre 2026. Comment fonctionne le score

Comptés ici : tous les projets de notre marché Nairobi.

Le classement

RangProjetPromoteurScoreRaison socialePermisDate de livraisonHistorique de la dateProtection du dépôtEmplacement
1Amethyst Springs (Amethyst Kilimani)Promoteur ? Envoyez ce qui manqueGY Group Real Estate60OuiNon publiéOuiOuiNon publiéOui
2237 Lulu
Pas encore examiné par nousPromoteur ? Envoyez ce qui manque
Mi Vida Homes44Non publiéNon publiéOuiNon vérifiéNon publiéOui
2265 Elmer One ApartmentsPromoteur ? Envoyez ce qui manqueCentum Real Estate Limited44OuiNon publiéOuiOuiNon publiéNon publié
4Luna Oak ResidencyPromoteur ? Envoyez ce qui manqueOAK Group40Non publiéNon publiéOuiOuiNon publiéNon publié
5156 ElaraPromoteur ? Envoyez ce qui manqueMi Vida Homes33Non publiéNon publiéOuiOuiNon publiéNon publié
5Keza Laika
Pas encore examiné par nousPromoteur ? Envoyez ce qui manque
Mi Vida Homes33Non publiéNon publiéOuiNon vérifiéNon publiéNon publié
7Santorini Residences Westlands
Pas encore examiné par nousPromoteur ? Envoyez ce qui manque
Non publié31Non publiéNon publiéOuiOuiNon publiéNon publié
8Stellar Bay
Pas encore examiné par nousPromoteur ? Envoyez ce qui manque
Non publié25Non publiéNon publiéOuiOuiNon publiéNon publié
9KEZA Riruta Phase 2
Pas encore examiné par nousPromoteur ? Envoyez ce qui manque
Mi Vida Homes15Non publiéNon publiéNon publiéNon publiéNon publiéNon publié

Recevez l'analyse complète de Nairobi par e-mail

Le détail de chaque projet, les documents vérifiés et un message quand un score change ici. Le classement de cette page reste gratuit et public.

Votre demande arrive à l'équipe Kolaboro, qui répond par e-mail. Les alertes automatiques de changement de score ne sont pas encore ouvertes ; nous vous préviendrons. Pour être retiré, répondez à l'un de nos e-mails.

Vous êtes le promoteur ? Envoyez-nous ce qui manque

Si votre projet publie quelque chose que nous n'avons pas trouvé (numéro de permis, séquestre, date de livraison, adresse), envoyez le document ou le lien. Après modération, le score est mis à jour.

Envoyer ce qui manque Corrections

Questions et réponses

Combien de projets sur plan à Nairobi Kolaboro note-t-il pour la transparence ?

9 projets, d'après les données lues le 12 novembre 2026.

Quel est le score de transparence médian à Nairobi ?

33 sur 100.

Combien de projets sur plan à Nairobi publient un numéro de permis ou de licence ?

0 sur 9 (0 %).

Combien de projets sur plan à Nairobi indiquent une protection du dépôt ?

0 sur 9 (0 %). 8 sur 9 publient une date de livraison.

Quel projet sur plan à Nairobi a le score de transparence le plus haut ?

Amethyst Springs (Amethyst Kilimani) (60 sur 100). Le score mesure ce qui est publié et vérifiable, pas la qualité ni la sécurité.

Protéger mon achat