Publicamos cada día
Nov 12SHIPPEDTransparency rankings for 30 islands and 30 cities: every tracked off-plan project scored 0 to 100 on what is published and checkable (legal name, permit, handover date and its record, deposit protection, location, website, official lists), with the method and weights public, a source on every line, a right of reply on every row and the full analysis by email on request; Sumba is ranked with a disclosure, and the founder's own project there is excludedNov 12DATA27 more projects added in 11 countries of the Americas and Asia-Pacific, filling markets the previous batch left empty: the Dominican Republic, Panama, Mexico, Belize, the Bahamas, Vietnam, Indonesia and Fiji, plus Texas, New York, California, Colombia and Sri Lanka (1,294 tracked in total): 13 have a handover date as the developer publishes it and 9 have a map pin from the developer's own map, page data or address; every fact has a source link and none is reviewed or scored yetNov 12SHIPPEDError sweep after the 11 November release: market pages no longer jump while they load (layout shift 1.5 to 0), the sealed X-ray page holds its place too, stale totals removed from the French and Russian home pages and the database page in 8 languages, one airport route that ran on an airfield service road taken out of the distance check, the Berlin short-let rule linked to the official page that is online, 26 broken links on translated pages repaired (payment email check, market pages, booking), the verify page now says its file list is weekly, singular forms in the bulk check, and the deploy guard's browser set-up repairedNov 12DATA33 more projects added in 11 countries across the Americas and Asia-Pacific, from Canada, the USA, Brazil and Colombia to Japan, Malaysia, the Philippines, Australia and New Zealand (1,267 tracked in total): 25 have a handover date as the developer publishes it and 12 have a map pin from the developer's own map or address; every fact has a source link and none is reviewed or scored yetNov 12DATA60 more projects added in 17 countries across Europe, the Middle East and Africa, from France, Germany and Spain to the UAE, Oman, Egypt, Kenya and South Africa (1,234 tracked in total): 43 have a handover date as the developer publishes it and 25 have a map pin from the developer's own map or address; every fact has a source link and none is reviewed or scored yetNov 11SHIPPEDDeveloper pages now list official gazette notices about the developer's company when it is identified by its exact legal name: Spain's BORME (every daily issue of the last 12 months), France's BODACC (by SIREN number) and The Gazette in the UK, with notice type, date and link; no names of people are copiedNov 11SHIPPEDAround the site: project pages with a reliable pin now show the nearest sea, beach, airport, runway end, hospital, school, supermarket and transport stop from OpenStreetMap, and the yearly PM2.5 and NO2 of the Copernicus atmosphere modelNov 11SHIPPEDDistance claims check: distances and travel times stated on the project page we track are quoted from our sealed copy next to the straight-line and road distance measured from the pinNov 11SHIPPEDClimate at the plot: hot days, warm nights, yearly rain and heavy-rain days for 1995 to 2014 against 2040 to 2059, with the range across climate models (World Bank CMIP6 data)Nov 11SHIPPED39 developer pages of listed companies now show the exchange, the ticker and a link to the official filings, with the latest annual report date for those filing with the US SEC. No share prices, no adviceNov 11SHIPPEDStricter script rules on every page: a script runs only when our own page loaded it, so injected code is blocked by the browser; tested first on 271 pages, every tool, the portal and the adminNov 11DATA50 more projects added in 21 countries, from the UAE, Spain and the UK to Australia, Malaysia and Greece (1,174 tracked in total): each has its developer page, the handover date as published or "not published", and a source link for every fact; none is reviewed or scored yetNov 11SHIPPEDCan you legally short-let there? Project pages and a new guide show licence or registration, caps and zones, night limits and building rules for 23 places, each linked to the official source and its dateNov 11SHIPPEDDeveloper pages now compare the company name with official regulator warning lists of unauthorised firms (FCA, AMF, MAS, SFC, FINMA, Central Bank of Ireland, SEC) and show a no-match result with each list's date; possible matches go to a private review and are never publishedNov 11SHIPPEDAccessibility pass on 271 pages with an automated checker: charts and status strips are announced correctly, sideways-scrolling boxes work from the keyboard, small links are easier to tap; Russian pages use the right word form after numbers; project links open the project page directlyNov 11SHIPPEDProject pages now say where the developer's own schedule puts the project today, and the promised dates download as a calendar file (.ics) or a subscription that updates when a date moves; the portal exports your payment schedule the same way
Novedades →

Kolaboro / Rankings / Transparencia / Mallorca

Proyectos sobre plano en Mallorca: ranking de transparencia

La puntuación de transparencia mide lo que está publicado y se puede comprobar de cada proyecto, con datos que tenemos con fuente. No califica la calidad, la seguridad ni el valor. «No publicado» significa que no encontramos ninguna fuente pública.

8proyectos puntuados
28puntuación de transparencia mediana
0%publican número de licencia o permiso
88%publican fecha de entrega
25%declaran protección del depósito

Datos leídos el 12 de noviembre de 2026. Cómo funciona la puntuación

Se cuentan aquí: los proyectos de nuestro mercado Balearics, Spain cuya zona publicada nombra Mallorca.

El ranking

PosiciónProyectoPromotorPuntuaciónRazón socialLicenciaFecha de entregaHistorial de la fechaProtección del depósitoUbicación
1Infinity¿Promotor? Envíe lo que nos faltóTaylor Wimpey España61No publicadoNo publicadoSíSíSíSí
2Oliu¿Promotor? Envíe lo que nos faltóTaylor Wimpey España50No publicadoNo publicadoSíSíSíNo publicado
3XO Parq¿Promotor? Envíe lo que nos faltóXOJAY40No publicadoNo publicadoSíSíNo publicadoNo publicado
4Exclusive new development in Son Cladera (EOS)¿Promotor? Envíe lo que nos faltóNo publicado31No publicadoNo publicadoSíSíNo publicadoNo publicado
56 Palma
Aún no revisado por nosotros¿Promotor? Envíe lo que nos faltó
Taylor Wimpey España25No publicadoNo publicadoSíSin comprobarNo publicadoNo publicado
6Aire de Llevant¿Promotor? Envíe lo que nos faltóMetrovacesa22SíNo publicadoNo publicadoNo publicadoNo publicadoNo publicado
7Cor 39
Aún no revisado por nosotros¿Promotor? Envíe lo que nos faltó
Taylor Wimpey España19No publicadoNo publicadoSíSin comprobarNo publicadoNo publicado
7Eclipse (Sant Elm)
Aún no revisado por nosotros¿Promotor? Envíe lo que nos faltó
Taylor Wimpey Espana19No publicadoNo publicadoSíSin comprobarNo publicadoNo publicado

Reciba por email el análisis completo de Mallorca

Los detalles de cada proyecto, los documentos que comprobamos y un aviso cuando cambie una puntuación de aquí. El ranking de esta página sigue siendo gratuito y público.

Su solicitud llega al equipo de Kolaboro, que responde por email. Los avisos automáticos de cambio de puntuación aún no están abiertos; le avisaremos cuando lo estén. Para darse de baja, responda a cualquier email nuestro.

¿Es usted el promotor? Envíenos lo que nos faltó

Si su proyecto publica algo que no encontramos (un número de licencia, datos de la cuenta de garantía, una fecha de entrega, una dirección), envíe el documento o el enlace. Tras la moderación, la puntuación se actualiza.

Enviar lo que faltó Correcciones

Preguntas y respuestas

¿Cuántos proyectos sobre plano de Mallorca puntúa Kolaboro por transparencia?

8 proyectos, con los datos leídos el 12 de noviembre de 2026.

¿Cuál es la puntuación de transparencia mediana en Mallorca?

28 sobre 100.

¿Cuántos proyectos sobre plano de Mallorca publican un número de licencia o permiso?

0 de 8 (0 %).

¿Cuántos proyectos sobre plano de Mallorca declaran protección del depósito?

2 de 8 (25 %). 7 de 8 publican una fecha de entrega.

¿Qué proyecto sobre plano de Mallorca tiene la puntuación de transparencia más alta?

Infinity (61 sobre 100). La puntuación mide lo publicado y comprobable, no la calidad ni la seguridad.

Proteger mi compra