Shipping daily
Changelog →

Kolaboro / Malaysia / Kuala Lumpur / Sunway Property

Sunway Flora 2: reviews and facts

What is published about Sunway Flora 2 in Bukit Jalil, Kuala Lumpur, Kuala Lumpur, Malaysia, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work

Is it safe? What we know and what we do not: Known: handover date, official lists. Not known yet: permit, company, construction, website.

Six checks at a glance

What each colour means
  • Green: published or confirmed.
  • Amber: partly.
  • Red: not published or the date passed.
  • Grey: not checked yet.

Facts, not a verdict.

Sunway Flora 2 is listed as under construction in Bukit Jalil, Kuala Lumpur, Kuala Lumpur, Malaysia, by Sunway Property. The handover date on record is Q2 2029. No permit number is published. Transparency score: 25 of 100, rank 35 of 40 in Kuala Lumpur. Not yet reviewed by Kolaboro (added 17 Nov 2026). There are no verified buyer reviews yet.

Did you buy here? Tell us

Not reviewed yet: no official register looked up for this project so far.
All key facts
Location
Bukit Jalil, Kuala Lumpur, Kuala Lumpur, Malaysia
Stage
under construction rumavi.com
Handover on record
Q2 2029 rumavi.com
Permit or licence number
not published
Kolaboro
Not yet reviewed by Kolaboro (added 17 Nov 2026)
Deposit protection
not yet reviewed
Page we read
rumavi.com
listing page (not the developer's site) rumavi.com
Last checked
17 Nov 2026
Open data record
KUA-022

Ranked #35 of 40 for transparency in Kuala Lumpur

Alert me if the date or price changes

One email when what is published about Sunway Flora 2 changes: handover date, prices, documents or register results. Alert emails start once our sending opens; we confirm your address now.

Free: a PDF report of Sunway Flora 2 with every fact and its source. The link appears here once you add your email.

We send a link to confirm first. Every email has a link to stop.

Follow changes in a feed reader: Atom JSON Feed API

In short

  • Sunway Flora 2 is listed as under construction in Bukit Jalil, Kuala Lumpur, Kuala Lumpur, Malaysia, by Sunway Property. rumavi.com
  • The handover date on record is Q2 2029. rumavi.com
  • No permit or licence number is published in the sources we read. rumavi.com

Is Sunway Flora 2 legit? What we could check

Transparency score 25 of 100, computed on 18 Nov 2026 from public sources. kolaboro.com

kolaboro.com

What is published and checkable about Sunway Flora 2, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.

Published or confirmed: 3 of 9 items we could check.

This checklist is computed from public facts; our own review of this project is not done yet.

  • Developer identified by legal name: No legal company name in the pages we read 0 of 10
  • Developer found in an official company register: Not found in GLEIF by exact legal name 0 of 5GLEIF
  • Permit or licence number published: No permit or licence number in the pages we read 0 of 15
  • Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
  • Handover date published: Published: Q2 2029 10 of 10
  • Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
  • Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
  • Address or plot location published: No precise address or plot location published 0 of 10
  • Developer website health: Developer website not checked by us Not checked by us: left out of this project's total.
  • Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
  • Price published: Price published 5 of 5
  • page we read: rumavi.com Kolaboro

How the transparency score is made

How much does Sunway Flora 2 cost?

Payment plan of Sunway Flora 2

  • No payment plan was published on the pages we read (read on 17 Nov 2026).

Unit types, sizes and floor plans of Sunway Flora 2

Total cost to buy at Sunway Flora 2: taxes and fees

Purchase taxes and fees in Malaysia: not published in our country guide yet. Work it out with your own figures

Prices over time

We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON

Price per m² against official data

No official comparison available for this project. The developer does not publish both a starting price and a unit size (no size found), so there is no price per m² to compare.

Compared only with official open data (registered sale prices or official appraised values). How we use data.

When will Sunway Flora 2 be completed?

Handover on record: Q2 2029, as seen on rumavi.com on 17 Nov 2026.

rumavi.com

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover date on record: Q2 2029. Not moved in our records. rumavi.com
  • No dated promise found in the sources we read.

Delivery forecast

Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.

No dated handover promise in our records, so there is no forecast.

Where it should be by now

By today (18 Nov 2026), the developer's own schedule says:

  • No promised date has come due yet.
  • Next on the schedule: Handover or completion, Q2 2029 (in 2 years).

Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself

Dated promises on record: 1, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.

Permits and licences

No permit or licence number published in the sources we read (checked 17 Nov 2026).

  • No permit or licence number is published in the sources we read.
  • Official register for Kuala Lumpur: KPKT TEDUH (opens in a browser, checked 13 Nov 2026) teduh.kpkt.gov.my

Live check in the official registers

Asks the official registers of this country now. Each answer is hashed (SHA-256).

Where is Sunway Flora 2?

Location as published: Bukit Jalil, Kuala Lumpur, Kuala Lumpur, on rumavi.com (checked 17 Nov 2026).

rumavi.com

  • Area as published: Bukit Jalil, Kuala Lumpur, Kuala Lumpur, Malaysia. rumavi.com
  • Pin on the map: none, because no address or coordinates precise enough are published. rumavi.com

Developer claims we tested

What the developer or listing saysWhat the records show
Development profile lists status "Under Construction" and completion "Q2 2029" rumavi.com
listing portal
not verified yet
686 units in total, 42 floors as listed on the profile rumavi.com
listing portal
not verified yet
3 unit types are listed at Sunway Flora 2, ranging from 2 to 4 bedrooms, between 71 and 117 sqm. Listed prices run from RM568,000 to RM1,294,000. rumavi.com
listing portal
not verified yet

What changed, with dates

Last checked 17 Nov 2026.

Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026).

    Public reports

    What public sources report, with the link. We list reports; we do not judge the developer.

    • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

    Who is the developer of Sunway Flora 2?

    Developer as published: Sunway Property, on rumavi.com (checked 17 Nov 2026).

    rumavi.com

    • Sunway Flora 2 is developed by Sunway Property, as published on the pages we read. Projects by Sunway Property that we track: 3. rumavi.com
    • Projects of Sunway Property we track: 3 (not yet completed: 3, completed: 0). kolaboro.com
    • None of the 3 projects by Sunway Property on our record is past its handover date.
    • Official company register (Malaysia): KPKT TEDUH teduh.kpkt.gov.my

    Other Sunway Property projects in Kuala Lumpur

    Other projects by Sunway Property that we track

    All facts about Sunway Property Delivery record of Sunway Property

    Alternatives to Sunway Flora 2

    Projects in Kuala Lumpur with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 25 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works

    Compared side by side

    Similar projects

    Market context: Kuala Lumpur

    • We track 29 projects in Kuala Lumpur. 41% publish a permit or licence number and 24% state deposit protection. kolaboro.com/m/kuala-lumpur/
    • In Kuala Lumpur, fewer than 5 projects are past their first handover date on record. Across all markets: a median of 8 months past (125 projects). How this is computed

    All projects in Kuala Lumpur

    Kuala Lumpur, November 2026: monthly data story

    Buyer reviews

    There are no verified buyer reviews of Sunway Flora 2 yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

    Reviews waiting for moderation are not shown.

    Bought here? Submit a verified review

    How we moderate reports and replies

    Right of reply

    No reply from the developer on record (checked 17 Nov 2026).

    Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

    Reply as the developer Report a correction Questions to ask the developer

    Questions to ask the developer about Sunway Flora 2

    1. What is the permit or licence number of Sunway Flora 2, which authority issued it, and on what date?
    2. What is the legal name and registration number of the company that sells the units and signs the contract?
    3. Is the handover date of Q2 2029 written into the contract, with a penalty if it is missed?
    4. Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
    5. Can you send dated photos or the latest inspection report of the construction?

    Prepare these questions as an email

    Before you pay

    Before you sign: your checklist for Malaysia

    Tick each step as you do it. Your ticks stay in this browser only.

    Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are being set up.

    Free live check Pre-purchase check, €490

    Buying off-plan in Malaysia: what to check

    What next

    Share this page: WhatsApp My projects

    Questions buyers ask

    Is Sunway Flora 2 legit?

    Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 17 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is Q2 2029. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 3 of 9 items we could check. Transparency score: 25 of 100, rank 35 of 40 in Kuala Lumpur. Check the sources on this page and ask the developer for documents before paying.

    Where is Sunway Flora 2?

    Sunway Flora 2 is in Bukit Jalil, Kuala Lumpur, Kuala Lumpur, Malaysia, according to the sources listed on this page. Pin on the map: none, because no address or coordinates precise enough are published.

    When will Sunway Flora 2 be completed?

    The handover date on record is Q2 2029.

    Is Sunway Flora 2 delayed?

    The handover date on record is Q2 2029.

    Who is the developer of Sunway Flora 2?

    Sunway Property, according to the sources listed on this page. Projects by Sunway Property that we track: 3.

    Does Sunway Flora 2 have a permit or licence?

    No permit or licence number is published in the sources we read.

    What do buyers say about Sunway Flora 2?

    There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

    How much does Sunway Flora 2 cost?

    The lowest price in the sources we read is MYR 500,000 and the highest MYR 1,300,800. Prices are as published and can change; ask the developer for the current price list.

    What is the transparency score of Sunway Flora 2?

    Transparency score: 25 of 100, rank 35 of 40 in Kuala Lumpur. It counts what is published and checkable, not quality.

    When was Sunway Flora 2 last checked, and what changed?

    Last checked 17 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026). No change to the published facts is recorded.

    Sources

    Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

    1. rumavi.com listing portal

    Archived copies of the page we read (Internet Archive)

    Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate

    Last checked 17 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

    Check this project€490 · written report usually within 7 days