Shipping daily
Nov 1DATAAll 646 projects re-verified: 6,419 developer claims tested against registers, courts and pressNov 1DATAMalaysia TEDUH and Philippines DHSUD licence checks: expired licences and approved delays foundNov 1DATAThailand ONEP register: 2 condos found selling before environmental approvalNov 1DATAMexico PROFECO contract register checks: one sales registration belonged to a laundryNov 1DATAAbu Dhabi ADREC inspections and RAK RERA permit list added: % built straight from the regulatorNov 1SHIPPEDNew stage filter: completed but still sellingNov 1SHIPPEDPublic database page: verification levels, disclosure distribution, every marketNov 1DATA+212 projects in one day, round 3: USA, Caribbean, Gulf, Africa, Japan, AustraliaNov 1SHIPPEDStage on every case: off-plan or under constructionOct 31SHIPPEDVerification level per check on every case card: registry, independent, developer, contradicted
Changelog →

Kolaboro / Projects / Albania

Twin Resort: reviews and facts

What is published about Twin Resort in Radhimë, Vlorë, Albania, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Location
Radhimë, Vlorë, Albania
Stage
under construction · active reginaconstruction.al
Handover on record
2026 reginaconstruction.al
Permit or licence number
not published
Deposit protection
not researched yet
Page we read
reginaconstruction.al reginaconstruction.al
Last checked
5 Nov 2026
Open data record
ALB-004

In short

  • Twin Resort is listed as under construction in Radhimë, Vlorë, Albania, by Regina Group. reginaconstruction.al
  • The handover date on record is 2026. reginaconstruction.al
  • No permit or licence number is published in the sources we read. reginaconstruction.al
  • Of 9 developer claims we checked, 3 are confirmed by a register or an independent source, 6 are not yet verified and 0 are contradicted by another source. Open data record

What is promised

As published by the developer or on listing pages, in the wording of the source.

  • Unit types: studio, 1BR, 2BR, penthouse reginaconstruction.al
  • Ownership: Foreigners can own apartments in Albania (land restrictions apply to agricultural land) reginaconstruction.al
  • Permit authority: National Territorial Council (KKT/KKTU), Albania reginaconstruction.al
  • Handover promised: 2026 reginaconstruction.al
  • developer (English page): two 4-storey buildings, hotel and residence structure with tourist services, 1 underground floor, under construction, completion 2026 reginaconstruction.al
  • developer: studios, 1+1, 2+1 and penthouses; two pools, private beach, parking reginaconstruction.al
  • developer homepage: earlier projects Regina Palm and Elite Resort in Radhimë, floor plans for Regina Palm reginaconstruction.al
  • developer LinkedIn (Jan 2025): Twin Resort is its third coastal project in Radhimë, last 11 apartments of section 2 for sale reginaconstruction.al
  • company register mirror: KKT building permit decision no. 48 of 01.08.2023 for the matching 4-storey hotel and residence structure in Radhimë; KKTU agenda 17.04.2026 item 52 to revise conditions during construction reginaconstruction.al

Delivery and delay record

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover or completion: 2026 date still ahead
    developer or listing page, copy of 5 Nov 2026 (SHA-256 6dd9bf1e46d33b54) reginaconstruction.al

Permits and licences

  • No permit or licence number is published in the sources we read.
  • Not on developer page. opencorporates.al file reproduces KKT decision no. 48 of 01.08.2023 granting a building permit for a 'hotel structure and residences with tourist services' in Radhimë, plus KKTU 17.04.2026 agenda item to revise construction conditions reginaconstruction.al

Live check in the official registers

Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.

The six buyer checks

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numbernoconfirmed in an official registerNot on developer page. opencorporates.al file reproduces KKT decision no. 48 of 01.08.2023 granting a building permit for a 'hotel structure and residences with tourist services' in Radhimë, plus KKTU 17.04.2026 agenda item to revise construction conditions reginaconstruction.al
Deposit protectionnonot published
Construction progressnostated only by the developerDeveloper says 'currently under construction, expected 2026'; no % or dated photos reginaconstruction.al
Floor or site plansyesnot publishedUnit type carousel only; floor plans shown for the earlier Regina Palm project reginaconstruction.al
Developer track recordyesstated only by the developerCentury 21 and Dua Shpi listings state Regina Palm buildings 2 and 3 were completed in Oct and Jul 2025; developer homepage claims 800 apartments reginaconstruction.al
No guaranteed returnsyesstated only by the developerNo return or guarantee wording reginaconstruction.al

Developer claims we tested

Claim (source wording)ResultChecked againstSource
Developer company is registered and active (founded 14.12.2020, Vlorë)verifiedregistry opencorporates.al
Building permit for a 4-storey hotel and residence structure in Radhimëverifiedregistry opencorporates.al
Under constructionverifiedregistry opencorporates.al
Completion in 2026not verified yet reginaconstruction.al
Private beach for residentsnot verified yet reginaconstruction.al
Developer has built 800 apartmentsnot verified yet reginaconstruction.al
Regina Palm Resort building 2 completed Oct 2025not verified yet century21albania.com
Regina Palm Resort building 3 completed Jul 2025not verified yet duashpi.al
Twin Resort is the developer's third coastal project in Radhimënot verified yet linkedin.com

What changed, with dates

  • No dated change recorded yet.
  • Fingerprint of the developer page text on 5 Nov 2026: SHA-256 6dd9bf1e46d33b54.... Anyone can check it on kolaboro.com/verify. kolaboro.com/verify
  • Satellite comparison (Sentinel-2, same season a year apart) on 5 Nov 2026: no visible change, 0% of the area changed. kolaboro.com/satellite

Public reports

What public sources report, with the link. We list reports; we do not judge the developer.

  • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

About the developer

All facts about Regina Group

Similar projects

Market context: Albania

  • We track 4 projects in Albania. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m

All projects in Albania

Buyer reviews

There are no verified buyer reviews of Twin Resort yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

Reviews waiting for moderation are not shown.

Bought here? Submit a verified review

Right of reply

Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

Reply as the developer Report a correction Questions to ask the developer

Before you pay

Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.

Free live check Pre-purchase check, €490

Questions buyers ask

Is Twin Resort legit?

Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 9 developer claims we checked, 3 are confirmed by a register or an independent source, 6 are not yet verified and 0 are contradicted by another source. The handover date on record is 2026. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.

When will Twin Resort be delivered?

The handover date on record is 2026.

Who is the developer of Twin Resort?

Regina Group, according to the sources listed on this page.

Does Twin Resort have a permit or licence?

A permit or licence is confirmed in an official register (see Permits and licences).

Are there reviews of Twin Resort?

There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

Sources

Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

  1. reginaconstruction.al https://www.reginaconstruction.al/project_details_en/?id=3
  2. duashpi.al https://duashpi.al/en/property/69e1bad322a6dc9108016cc2/we-sell-21-apartment-in-radhime-wi...
  3. everteta.al https://everteta.al/harta-e-betonit/
  4. century21albania.com https://www.century21albania.com/en/property/5495769/shesim-2-apartamente-ne-radhime-me-pa...
  5. linkedin.com https://www.linkedin.com/posts/regina-group-construction-773b38348_mir%C3%ABsevini-n%C3%AB...
  6. opencorporates.al https://www.opencorporates.al/en/nipt/m07415202d
  7. reginaconstruction.al https://www.reginaconstruction.al/
  8. reginaconstruction.al https://www.reginaconstruction.al/project_details_en/?id=2

Archived copies of the page we read (Internet Archive)

Last checked 5 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

Protect my purchase