Kolaboro / USA / Austin / Intracorp Homes
Leland South Congress: reviews and facts
What is published about Leland South Congress in 2121 S. Congress Ave., South Congress, Austin, Austin, USA, what official registers and other sources say, and what changed over time. Facts only, each with its source.
Short answer Leland South Congress is listed as under construction in 2121 S. Congress Ave., South Congress, Austin, Austin, USA, by Intracorp Homes. The handover date on record is 2029. No permit number is published. Transparency score: 29 of 100. Not yet reviewed by Kolaboro (added 13 Nov 2026). There are no verified buyer reviews yet. Last checked 12 Nov 2026.
Six checks at a glance
- ●Permitno number published
- ●Companyno legal name found
- ●Handover datedate published
- ○Constructionnot checked yet
- ○Websitenot monitored yet
- ○Official listsnot screened yet
What each colour means
Green: published or confirmed. Amber: partly. Red: not published or the date passed. Grey: not checked yet. Facts, not a verdict.
All key facts
- Developer
- Intracorp Homes elliman.com
- Location
- 2121 S. Congress Ave., South Congress, Austin, Austin, USA
- Stage
- under construction elliman.com
- Handover on record
- 2029 elliman.com
- Permit or licence number
- not published
- Kolaboro
- Not yet reviewed by Kolaboro (added 13 Nov 2026)
- Deposit protection
- not yet reviewed
- Page we read
- elliman.com elliman.com
- Last checked
- 12 Nov 2026
- Open data record
- AUS-004
One email when what is published about Leland South Congress changes: handover date, prices, documents or register results.
Free: a PDF report of Leland South Congress with every fact and its source. Download the free PDF report
We send a link to confirm first. Every email has a link to stop.
In short
- Not yet reviewed by Kolaboro (added 13 Nov 2026). Our research agent has not reviewed this project yet. Below are only the facts we have, each with its source. No checks, score or label are shown until the review is done.
- Leland South Congress is listed as under construction in 2121 S. Congress Ave., South Congress, Austin, Austin, USA, by Intracorp Homes. elliman.com
- The handover date on record is 2029. elliman.com
- No permit or licence number is published in the sources we read. elliman.com
What changed since the last check
Last checked 12 Nov 2026.
Nothing to compare yet: changes show here once we hold a second dated copy (first copy 12 Nov 2026).
Is Leland South Congress legit? What we could check
Transparency score 29 of 100, computed on 13 Nov 2026 from public sources. kolaboro.com
What is published and checkable about Leland South Congress, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.
Published or confirmed: 2 of 7 items we could check.
This checklist is computed from public facts; our own review of this project is not done yet.
- Developer identified by legal name: No legal company name in the pages we read 0 of 10
- Developer found in an official company register: Not checked Not checked by us: left out of this project's total.
- Permit or licence number published: No permit or licence number in the pages we read 0 of 15
- Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
- Handover date published: Published: 2029 10 of 10
- Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
- Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
- Address or plot location published: Precise enough for a map pin 10 of 10
- Developer website health: Developer website not checked by us Not checked by us: left out of this project's total.
- Official lists screened: not screened yet Not checked by us: left out of this project's total.
- Price published: No price in the pages we read 0 of 5
- page we read: elliman.com Kolaboro
How much does Leland South Congress cost?
- Prices and payment plan as published on the pages we read (copy of 12 Nov 2026). elliman.com
- Price: not published in the pages we read.
- Payment plan: not published in the pages we read.
- Units: 265 elliman.com
- Unit types: studio, apartment, penthouse elliman.com
- Handover promised: 2029 elliman.com
- Intracorp Homes announced that construction of Leland South Congress at 2121 S. Congress Ave. has commenced after closing construction financing with BGO; completion is expected in 2029 elliman.com
- Seven-story building with 265 studio, one-, two- and three-bedroom residences plus penthouses and about 22,000 sq ft of ground-floor retail; 45% of the building pre-sold at the time of the announcement; general contractor ANDRES Construction; marketed by Douglas Elliman Development Marketing elliman.com
- Pin: 30.2426481, -97.7523394 (2121 South Congress Avenue, Austin, geocoded with OpenStreetMap Nominatim (house-level match)); the street address is the one printed in the source page elliman.com
Total cost to buy at Leland South Congress: taxes and fees
Purchase taxes and fees in USA: not published in our country guide yet. Work it out with your own figures
Prices over time
We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON
Price per m² against official data
No official comparison available for this project. The developer does not publish both a starting price and a unit size, so there is no price per m² to compare.
Compared only with official open data (registered sale prices or official appraised values). How we use data.
When will Leland South Congress be completed?
Handover on record: 2029, as seen on elliman.com on 12 Nov 2026.
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover date on record: 2029. Not moved in our records. elliman.com
- No dated promise found in the sources we read.
Delivery forecast
Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.
No dated handover promise in our records, so there is no forecast.
Where it should be by now
By today (13 Nov 2026), the developer's own schedule says:
- No promised date has come due yet.
- Next on the schedule: Handover or completion, 2029 (in 2 years).
Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself
Dated promises on record: 1, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.
Permits and licences
No permit or licence number published in the sources we read (checked 12 Nov 2026).
- No permit or licence number is published in the sources we read.
- County and city permit portals: no official online register (checked 4 Nov 2026) kolaboro.com/registers
Live check in the official registers
Asks the official registers of this country now. Each answer is hashed (SHA-256).
Where is Leland South Congress?
Location as published: 2121 S. Congress Ave., South Congress, Austin, Austin, on elliman.com (checked 12 Nov 2026).
- Area as published: 2121 S. Congress Ave., South Congress, Austin, Austin, USA. elliman.com
- Pin on the map: from a published address or coordinates. elliman.com
The six buyer checks
Not yet reviewed by Kolaboro (added 13 Nov 2026). Our research agent has not reviewed this project yet. Below are only the facts we have, each with its source. No checks, score or label are shown until the review is done.
Developer claims we tested
| Claim (source wording) | Result | Checked against | Source |
|---|---|---|---|
| Intracorp Homes announced that construction of Leland South Congress at 2121 S. Congress Ave. has commenced after closing construction financing with BGO; completion is expected in 2029 | not verified yet | elliman.com | |
| Seven-story building with 265 studio, one-, two- and three-bedroom residences plus penthouses and about 22,000 sq ft of ground-floor retail; 45% of the building pre-sold at the time of the announcement; general contractor ANDRES Construction; marketed by Douglas Elliman Development Marketing | not verified yet | elliman.com | |
| Pin: 30.2426481, -97.7523394 (2121 South Congress Avenue, Austin, geocoded with OpenStreetMap Nominatim (house-level match)); the street address is the one printed in the source page | not verified yet | elliman.com |
What changed, with dates
- No dated change recorded yet.
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
Who is the developer of Leland South Congress?
Developer as published: Intracorp Homes, on elliman.com (checked 12 Nov 2026).
- Leland South Congress is developed by Intracorp Homes, as published on the pages we read. elliman.com
- Projects of Intracorp Homes we track: 1 (not yet completed: 1, completed: 0). kolaboro.com
Alternatives to Leland South Congress
Projects in Austin with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 29 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works
This project publishes no price, so we cannot list alternatives by price in Austin.
Compared side by side
Market context: Austin
- We track 4 projects in Austin. 25% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m/austin/
Buyer reviews
There are no verified buyer reviews of Leland South Congress yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Before you pay
Before you sign: your checklist for USA
Tick each step as you do it. Your ticks stay in this browser only.
Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.
What next
Share this page: WhatsApp My projects
Questions buyers ask
Is Leland South Congress legit?
Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 13 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is 2029. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 2 of 7 items we could check. Transparency score: 29 of 100. Check the sources on this page and ask the developer for documents before paying.
Where is Leland South Congress?
Leland South Congress is in 2121 S. Congress Ave., South Congress, Austin, Austin, USA, according to the sources listed on this page. Pin on the map: from a published address or coordinates.
When will Leland South Congress be completed?
The handover date on record is 2029.
Is Leland South Congress delayed?
The handover date on record is 2029.
Who is the developer of Leland South Congress?
Intracorp Homes, according to the sources listed on this page.
Does Leland South Congress have a permit or licence?
No permit or licence number is published in the sources we read.
What do buyers say about Leland South Congress?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
How much does Leland South Congress cost?
No price is published in the pages we read. Ask the developer for the current price list.
What is the transparency score of Leland South Congress?
Transparency score: 29 of 100. It counts what is published and checkable, not quality.
When was Leland South Congress last checked, and what changed?
Last checked 12 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 12 Nov 2026). No change to the published facts is recorded.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- elliman.com https://www.elliman.com/insider/construction-begins-on-leland-south-congress-austins-best-...
Last checked 12 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.