Hyde Metropolitan:评价与事实
关于位于 Sydney CBD (Hyde Park), Sydney, Australia 的 Hyde Metropolitan 公开发布了什么、官方登记册和其他来源怎么说,以及随时间发生了哪些变化。只列事实,每条都有来源。
- 位置
- Sydney CBD (Hyde Park), Sydney, Australia
- 记录中的交付日期
- H2 2027 hydemetropolitan.com.au
- 许可证或执照编号
- D/2022/495 apartments.com.au
- 定金保护
- 尚未研究
- 我们阅读的页面
- hydemetropolitan.com.au hydemetropolitan.com.au
- 最近核查
- 2026年11月5日
- 开放数据记录
- SYD-003
简要
- Hyde Metropolitan 列为在建,位于 Sydney CBD (Hyde Park), Sydney, Australia,开发商为 Deicorp。 hydemetropolitan.com.au
- 记录中的交付日期为 H2 2027。 hydemetropolitan.com.au
- 已公布许可证或执照编号。 apartments.com.au
- 在我们核查的 11 条开发商声明中,4 条已由登记册或独立来源确认,5 条尚未核实,2 条与其他来源相矛盾。 开放数据记录
承诺内容
按开发商或房源页面的发布内容,保留来源原文。
- 起价: AUD 1,480,000 hydemetropolitan.com.au
- 单位数: 168 hydemetropolitan.com.au
- 户型: 1BR, 2BR, 3BR, penthouse hydemetropolitan.com.au
- 发证机关: City of Sydney / Central Sydney Planning Committee hydemetropolitan.com.au
- 开工: 2025 hydemetropolitan.com.au
- 承诺交付: Q4 2027 hydemetropolitan.com.au
- DA D/2022/495 approved by Central Sydney Planning Committee 17 Aug 2023 (council decision PDF) apartments.com.au
- 168 residences, 51-55 storeys, about 200 m apartments.com.au
- 1BR from AUD 1,480,000, 2BR from 3,270,000, 3BR from 5,070,000 (listing) apartments.com.au
- completion late 2027 (listing) apartments.com.au
- 10-year latent defects insurance (listing) apartments.com.au
- construction update video link on developer site, no dated text apartments.com.au
- brochure dated May 2025 apartments.com.au
交付与延期记录
我们找到的每一项带日期的承诺、它如何变化以及日期是否已过。规则:承诺跟踪。
- 交付或竣工: H2 2027 日期尚未到来
我们 2026年10月31日 的研究记录 hydemetropolitan.com.au - 其他施工节点: 2025年11月 已兑现
我们 2026年10月31日 的研究记录 hydemetropolitan.com.au
许可证与执照
- 公布的编号:D/2022/495。 apartments.com.au
- City of Sydney printed decision: D/2022/495, 133-141 Liverpool Street, consent granted unanimously by the Central Sydney Planning Committee on 17 Aug 2023, with a AUD 398,250 site rectification bank guarantee condition apartments.com.au
官方登记册实时核查
立即查询该国可访问的官方登记册,并显示每个登记册的返回结果。每个回复都做 SHA-256 哈希;不编造任何内容,登记册没有数据时会如实显示。
买家的六项核查
“公开”表示信息已公布。级别说明由谁确认。方法:评分方法。
| 核查项 | 公开 | 由谁确认 | 我们的发现 |
|---|---|---|---|
| 许可证或执照编号 | 是 | 经官方登记册确认 | City of Sydney printed decision: D/2022/495, 133-141 Liverpool Street, consent granted unanimously by the Central Sydney Planning Committee on 17 Aug 2023, with a AUD 398,250 site rectification bank guarantee condition apartments.com.au |
| 定金保护 | 否 | 未公布 | |
| 施工进度 | 否 | 经独立来源确认 | Wikipedia (citing press) says demolition finished by July 2025 and six-level basement excavation was due to end Nov 2025; realcommercial.com.au reported work about to start; developer site has a construction update video but no dated text or %; listing says pre-construction apartments.com.au |
| 户型图或总平面图 | 否 | 未公布 | Floor plans only via brochure apartments.com.au |
| 开发商业绩 | 是 | 经独立来源确认 | Deicorp says 12,000+ homes across 40 Sydney suburbs since 1999; SBS (2016) independently names Deicorp as developer of the completed Star Printery apartments, Erskineville apartments.com.au |
| 无保证回报 | 是 | 仅开发商声明 | No yield or guarantee apartments.com.au |
我们核查的开发商声明
| 声明(来源原文) | 结果 | 对照来源 | 来源 |
|---|---|---|---|
| Development consent D/2022/495 granted | 已核实 | registry | meetings.cityofsydney.nsw.gov.au |
| Consent covers residential levels up to Level 54 | 相矛盾 | registry | meetings.cityofsydney.nsw.gov.au |
| Construction stage: demolition complete, excavation under way (2025) | 已核实 | independent | en.wikipedia.org |
| Project is pre-construction (listing status) | 相矛盾 | independent | en.wikipedia.org |
| Completion late 2027 | 尚未核实 | apartments.com.au | |
| Site bought by Deicorp in 2021 for over AUD 200m | 已核实 | independent | en.wikipedia.org |
| 1BR from AUD 1,480,000 | 尚未核实 | apartments.com.au | |
| Over 12,000 homes delivered across 40 Sydney suburbs since 1999 | 尚未核实 | hydemetropolitan.com.au | |
| Deicorp developed and completed Star Printery, Erskineville | 已核实 | independent | sbs.com.au |
| 10-year latent defects insurance | 尚未核实 | apartments.com.au | |
| Deposits held in trust | 尚未核实 | hydemetropolitan.com.au |
变化记录(含日期)
- 尚无带日期的变化记录。
- 2026年11月5日 开发商页面文本指纹:SHA-256
ac009cfc3b177dc5...。任何人都可以在 kolaboro.com/verify 核验。 kolaboro.com/verify
公开报道
公开来源的报道,附链接。我们只列出报道,不评判开发商。
- 在我们阅读的来源中未发现有关纠纷、监管行动、停工或财务困难的报道。
关于开发商
- 成立: 1999 hydemetropolitan.com.au
- 总部: Sydney, Australia hydemetropolitan.com.au
- 已交付单位: 12000 hydemetropolitan.com.au
- Deicorp says 12,000+ homes across 40 Sydney suburbs since 1999; SBS (2016) independently names Deicorp as developer of the completed Star Printery apartments, Erskineville hydemetropolitan.com.au
类似项目
- Sydney House Sydney · 在建
- The Anderson, Chatswood Sydney · 在建
- Harbourside Residences Sydney · 在建
- Waterstone Sydney · 在建
- The Bryson of Chatswood Sydney · 在建
市场背景:Sydney
- 我们在 Sydney 跟踪 6 个项目。83% 公布许可证编号,17% 说明定金保护。 kolaboro.com/m
买家评价
Hyde Metropolitan 尚无经核实的买家评价。我们只发布能证明购买的买家的评价(合同或收据的指纹,用通行密钥签名),并且须经审核员阅读后才发布。
等待审核的评价不会显示。
答复权
您是开发商吗?请发送文件,我们会把您的答复加到本页。发现事实有误?告诉我们,我们会更正并注明日期。
付款之前
粘贴项目链接,免费实时查看官方登记册的结果。如需完整的案头审查和本地代理实地走访,请订购购前核查。
买家常见问题
Hyde Metropolitan 可靠吗?
Kolaboro 不给项目或开发商贴标签。公开记录显示:已公布许可证或执照编号。 在我们核查的 11 条开发商声明中,4 条已由登记册或独立来源确认,5 条尚未核实,2 条与其他来源相矛盾。 记录中的交付日期为 H2 2027。 在我们阅读的来源中未发现有关纠纷、监管行动、停工或财务困难的报道。 付款前请查看本页来源,并向开发商索取文件。
Hyde Metropolitan 什么时候交付?
记录中的交付日期为 H2 2027。
Hyde Metropolitan 的开发商是谁?
根据本页所列来源,是 Deicorp。
Hyde Metropolitan 有许可证或执照吗?
许可证或执照已在官方登记册中得到确认(见“许可证与执照”)。
有关于 Hyde Metropolitan 的评价吗?
尚无经核实的买家评价。能证明购买的买家可以提交评价,经审核后发布。
来源
本页每条事实都链接到其来源。我们阅读的页面会按日期保存指纹。
- hydemetropolitan.com.au https://hydemetropolitan.com.au
- apartments.com.au https://www.apartments.com.au/new-apartments/hyde-metropolitan-sydney-133-141-liverpool-st...
- en.wikipedia.org https://en.wikipedia.org/wiki/Hyde_Metropolitan
- meetings.cityofsydney.nsw.gov.au https://meetings.cityofsydney.nsw.gov.au/documents/d4554/Printed decision Development Appl...
- production-urban-next-git-ude-461-urban-ninja.vercel.app https://production-urban-next-git-ude-461-urban-ninja.vercel.app/news/qld/morris-releases-...
- realcommercial.com.au https://realcommercial.com.au/news/sydneys-apartments-back-on-song-as-city-tower-kicks-off
- sbs.com.au https://www.sbs.com.au/news/article/alarm-after-blocks-developer-taken-to-court-for-allege...
最近核查 2026年11月5日。我们如何收集数据:数据政策。引用的事实以来源语言显示。