AURA at Melbourne Square:评价与事实
关于位于 Southbank (Melbourne Square precinct, Kavanagh Street), Melbourne, Australia 的 AURA at Melbourne Square 公开发布了什么、官方登记册和其他来源怎么说,以及随时间发生了哪些变化。只列事实,每条都有来源。
- 位置
- Southbank (Melbourne Square precinct, Kavanagh Street), Melbourne, Australia
- 记录中的交付日期
- 2031 melbournesquare.com.au
- 许可证或执照编号
- 未公布
- 定金保护
- 尚未研究
- 我们阅读的页面
- melbournesquare.com.au melbournesquare.com.au
- 最近核查
- 2026年11月5日
- 开放数据记录
- MEL-001
简要
- AURA at Melbourne Square 列为期房,位于 Southbank (Melbourne Square precinct, Kavanagh Street), Melbourne, Australia,开发商为 OSK Property。 melbournesquare.com.au
- 记录中的交付日期为 2031。 melbournesquare.com.au
- 我们阅读的来源中未公布许可证或执照编号。 melbournesquare.com.au
- 在我们核查的 12 条开发商声明中,7 条已由登记册或独立来源确认,4 条尚未核实,1 条与其他来源相矛盾。 开放数据记录
承诺内容
按开发商或房源页面的发布内容,保留来源原文。
- 起价: AUD 565,000 melbournesquare.com.au
- 单位数: 673 melbournesquare.com.au
- 面积: 43 - 139 m² melbournesquare.com.au
- 户型: studio, 1BR, 2BR, 3BR, penthouse, Mira Terrace melbournesquare.com.au
- 产权形式: Strata units; foreign buyers may buy new off-the-plan dwellings under FIRB rules, outside the 1 Apr 2025 to 31 Mar 2027 established-dwelling ban melbournesquare.com.au
- 发证机关: Victorian Minister for Planning / Department of Transport and Planning melbournesquare.com.au
- 开工: 2026年9月 melbournesquare.com.au
- 承诺交付: Q1 2030 melbournesquare.com.au
- 67-storey tower, 673 residences from studio to 3BR plus penthouses and Mira Terraces melbournesquare.com.au
- prices from AUD 565,000 melbournesquare.com.au
- groundbreaking 22 September 2026, builder Multiplex melbournesquare.com.au
- completion planned early 2030 melbournesquare.com.au
- sizes 463 to 1,496 sq ft (Malaysian launch coverage) melbournesquare.com.au
交付与延期记录
我们找到的每一项带日期的承诺、它如何变化以及日期是否已过。规则:承诺跟踪。
- 交付或竣工: 2031 日期尚未到来
我们 2026年10月31日 的研究记录 melbournesquare.com.au
许可证与执照
- 我们阅读的来源中未公布许可证或执照编号。
- No permit number on developer page; precinct approved by Planning Minister on 24 Dec 2015 (Wikipedia); Victorian ministerial permit register not matched to this site melbournesquare.com.au
官方登记册实时核查
立即查询该国可访问的官方登记册,并显示每个登记册的返回结果。每个回复都做 SHA-256 哈希;不编造任何内容,登记册没有数据时会如实显示。
买家的六项核查
“公开”表示信息已公布。级别说明由谁确认。方法:评分方法。
| 核查项 | 公开 | 由谁确认 | 我们的发现 |
|---|---|---|---|
| 许可证或执照编号 | 否 | 经独立来源确认 | No permit number on developer page; precinct approved by Planning Minister on 24 Dec 2015 (Wikipedia); Victorian ministerial permit register not matched to this site melbournesquare.com.au |
| 定金保护 | 否 | 未公布 | No deposit holding statement published melbournesquare.com.au |
| 施工进度 | 是 | 经独立来源确认 | Developer site reports groundbreaking 22 September 2026 with Multiplex melbournesquare.com.au |
| 户型图或总平面图 | 否 | 未公布 | No floor plans found (project microsite auramsq.com.au could not be opened) melbournesquare.com.au |
| 开发商业绩 | 是 | 经独立来源确认 | Stage 1 towers completed 2021 and BLVD settling in 2026 melbournesquare.com.au |
| 无保证回报 | 是 | 仅开发商声明 | Rental demand described, no yield figure or guarantee melbournesquare.com.au |
我们核查的开发商声明
| 声明(来源原文) | 结果 | 对照来源 | 来源 |
|---|---|---|---|
| Melbourne Square precinct planning approval granted by the Planning Minister (24 Dec 2015) | 已核实 | independent | en.wikipedia.org |
| Stage 1 construction Nov 2017 to May 2021 by Multiplex | 已核实 | independent | en.wikipedia.org |
| Groundbreaking 22 September 2026 with Multiplex | 已核实 | independent | edgeprop.my |
| Syndicated construction loan from Maybank, HSBC, Bank of China Malaysia and ICBC Malaysia | 已核实 | independent | edgeprop.my |
| 673 apartments, 67 storeys, GDV AUD 800m | 已核实 | independent | thestar.com.my |
| More than 140 units sold since soft launch | 尚未核实 | apartments.com.au | |
| Prices from AUD 565,000 vs AUD 568,000 on related listing | 相矛盾 | apartments.com.au | |
| Completion early 2030 | 尚未核实 | melbournesquare.com.au | |
| Precinct permit requires completion by 2031 | 已核实 | independent | en.wikipedia.org |
| Freehold title for Aura units | 尚未核实 | thestar.com.my | |
| Planning permit number for the Aura tower | 尚未核实 | planning.vic.gov.au | |
| Foreign buyers can buy new off-the-plan dwellings | 已核实 | independent | propertymarkets.news |
变化记录(含日期)
- 尚无带日期的变化记录。
- 2026年11月5日 开发商页面文本指纹:SHA-256
f97f18f89a229ef5...。任何人都可以在 kolaboro.com/verify 核验。 kolaboro.com/verify
公开报道
公开来源的报道,附链接。我们只列出报道,不评判开发商。
- 在我们阅读的来源中未发现有关纠纷、监管行动、停工或财务困难的报道。
关于开发商
- 总部: Kuala Lumpur, Malaysia melbournesquare.com.au
- 上市或经审计: Parent OSK Holdings is listed on Bursa Malaysia (not checked in filings for this project) melbournesquare.com.au
- Stage 1 towers completed 2021 and BLVD settling in 2026 melbournesquare.com.au
类似项目
- Moray House Melbourne · 期房
- Elysium Fields (Helios and stage 1 towers) Melbourne · 在建
- South Beach Gold Coast · 期房
- Harmony on Broadbeach Gold Coast · 期房
- Teneriffe Banks Brisbane · 期房
市场背景:Melbourne
- 我们在 Melbourne 跟踪 3 个项目。67% 公布许可证编号,0% 说明定金保护。 kolaboro.com/m
买家评价
AURA at Melbourne Square 尚无经核实的买家评价。我们只发布能证明购买的买家的评价(合同或收据的指纹,用通行密钥签名),并且须经审核员阅读后才发布。
等待审核的评价不会显示。
答复权
您是开发商吗?请发送文件,我们会把您的答复加到本页。发现事实有误?告诉我们,我们会更正并注明日期。
付款之前
粘贴项目链接,免费实时查看官方登记册的结果。如需完整的案头审查和本地代理实地走访,请订购购前核查。
买家常见问题
AURA at Melbourne Square 可靠吗?
Kolaboro 不给项目或开发商贴标签。公开记录显示:我们阅读的来源中未公布许可证或执照编号。 在我们核查的 12 条开发商声明中,7 条已由登记册或独立来源确认,4 条尚未核实,1 条与其他来源相矛盾。 记录中的交付日期为 2031。 在我们阅读的来源中未发现有关纠纷、监管行动、停工或财务困难的报道。 付款前请查看本页来源,并向开发商索取文件。
AURA at Melbourne Square 什么时候交付?
记录中的交付日期为 2031。
AURA at Melbourne Square 的开发商是谁?
根据本页所列来源,是 OSK Property。
AURA at Melbourne Square 有许可证或执照吗?
我们阅读的来源中未公布许可证或执照编号。
有关于 AURA at Melbourne Square 的评价吗?
尚无经核实的买家评价。能证明购买的买家可以提交评价,经审核后发布。
来源
本页每条事实都链接到其来源。我们阅读的页面会按日期保存指纹。
- melbournesquare.com.au https://www.melbournesquare.com.au/
- en.wikipedia.org https://en.wikipedia.org/wiki/Melbourne_Square_(complex)
- propertymarkets.news https://propertymarkets.news/updated-firb-regulations-explained-off-the-plan-apartments-un...
- apartments.com.au https://www.apartments.com.au/news/vic/osk-multiplex-commence-construction-melbourne-squar...
- edgeprop.my https://www.edgeprop.my/content/1917527/osk-property-starts-work-a800m-aura-tower-melbourn...
- planning.vic.gov.au https://www.planning.vic.gov.au/planning-approvals/ministerial-permits-register/ministeria...
- thestar.com.my https://www.thestar.com.my/metro/metro-news/2026/04/25/creating-contemporary-urban-living-...
最近核查 2026年11月5日。我们如何收集数据:数据政策。引用的事实以来源语言显示。