Nov 1DATAAll 646 projects re-verified: 6,419 developer claims tested against registers, courts and pressNov 1DATAMalaysia TEDUH and Philippines DHSUD licence checks: expired licences and approved delays foundNov 1DATAThailand ONEP register: 2 condos found selling before environmental approvalNov 1DATAMexico PROFECO contract register checks: one sales registration belonged to a laundryNov 1DATAAbu Dhabi ADREC inspections and RAK RERA permit list added: % built straight from the regulatorNov 1SHIPPEDNew stage filter: completed but still sellingNov 1SHIPPEDPublic database page: verification levels, disclosure distribution, every marketNov 1DATA+212 projects in one day, round 3: USA, Caribbean, Gulf, Africa, Japan, AustraliaNov 1SHIPPEDStage on every case: off-plan or under constructionOct 31SHIPPEDVerification level per check on every case card: registry, independent, developer, contradicted
Changelog →

Kolaboro / Projects / Budapest

Greenway Apartments: reviews and facts

What is published about Greenway Apartments in Angyalföld, District XIII, near Váci út (1138 Budapest, Szekszárdi utca 5), Budapest, Hungary, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Developer
LIVING living.hu
Location
Angyalföld, District XIII, near Váci út (1138 Budapest, Szekszárdi utca 5), Budapest, Hungary
Stage
under construction living.hu
Handover on record
Q4 2028 living.hu
Permit or licence number
not published
Deposit protection
not researched yet
Page we read
living.hu living.hu
Last checked
5 Nov 2026
Open data record
BUD-001

In short

  • Greenway Apartments is listed as under construction in Angyalföld, District XIII, near Váci út (1138 Budapest, Szekszárdi utca 5), Budapest, Hungary, by LIVING. living.hu
  • The handover date on record is Q4 2028. living.hu
  • No permit or licence number is published in the sources we read. living.hu
  • Of 4 developer claims we checked, 0 are confirmed by a register or an independent source, 4 are not yet verified and 0 are contradicted by another source. Open data record

What is promised

As published by the developer or on listing pages, in the wording of the source.

  • Units: 299 living.hu
  • Unit types: studio, apartments up to duplex penthouses, 34 apartments with private garden living.hu
  • Handover promised: Q4 2028 living.hu

Delivery and delay record

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover or completion: Q4 2028 date still ahead
    developer or listing page, copy of 5 Nov 2026 (SHA-256 fa602ec15e98165d) living.hu

Permits and licences

  • No permit or licence number is published in the sources we read.

Live check in the official registers

Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.

The six buyer checks

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numbernonot published
Deposit protectionnonot published
Construction progressyesstated only by the developer
Floor or site plansnonot published
Developer track recordyesstated only by the developer
No guaranteed returnsyesnot published

Developer claims we tested

Claim (source wording)ResultChecked againstSource
Final building permit for the residential project exists (WING announcement when it bought the plot, no permit number given)not verified yet wing.hu
Handover of phase 1 (299 apartments) in Q4 2028not verified yet living.hu
Groundworks finished and base slab under way, announced by LIVING on 29 October (year not shown on the snippet seen)not verified yet hely.hu
Eight LIVING projects completed in District XIIInot verified yet buildingconnections.eu

What changed, with dates

  • 5 Nov 2026 · Hourly page check: developer page now claims 149 units left (was 148 on 5 Nov), a sales claim we cannot verify (SHA-256 fa602ec15e98165d...) living.hu
  • 5 Nov 2026 · Hourly page check: developer page promises handover in 2028-Q4 (first reading by the hourly check) (SHA-256 9f709e24d142eb32...) living.hu
  • 5 Nov 2026 · Hourly page check: developer page claims 148 units left, a sales claim we cannot verify (SHA-256 9f709e24d142eb32...) living.hu

Public reports

What public sources report, with the link. We list reports; we do not judge the developer.

  • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

About the developer

All facts about LIVING

Similar projects

Market context: Budapest

  • We track 4 projects in Budapest. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m

All projects in Budapest

Buyer reviews

There are no verified buyer reviews of Greenway Apartments yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

Reviews waiting for moderation are not shown.

Bought here? Submit a verified review

Right of reply

Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

Reply as the developer Report a correction Questions to ask the developer

Before you pay

Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.

Free live check Pre-purchase check, €490

Questions buyers ask

Is Greenway Apartments legit?

Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 4 developer claims we checked, 0 are confirmed by a register or an independent source, 4 are not yet verified and 0 are contradicted by another source. The handover date on record is Q4 2028. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.

When will Greenway Apartments be delivered?

The handover date on record is Q4 2028.

Who is the developer of Greenway Apartments?

LIVING, according to the sources listed on this page.

Does Greenway Apartments have a permit or licence?

No permit or licence number is published in the sources we read.

Are there reviews of Greenway Apartments?

There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

Sources

Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

  1. living.hu https://living.hu/en/residential-parks/greenway-apartments
  2. buildingconnections.eu https://buildingconnections.eu/en/ingatlan/2026/04/02/utfelujitassal-es-kozteri-fejlesztes...
  3. epiteszforum.hu https://epiteszforum.hu/299-lakasos-lakopark-epul-a-vaci-uton-a-gyongyosi-utcai-metromegal...
  4. hely.hu https://hely.hu/hirek/mar-az-alapoknal-tart-angyalfold-nagyszabasu-lakofejlesztese/
  5. living.hu https://living.hu/en
  6. magyarepitok.hu https://magyarepitok.hu/temak/wing-zrt
  7. wing.hu https://wing.hu/hu/hirek
  8. wing.hu https://wing.hu/hu/hirek/A-Vaci-uton-vett-fejlesztesi-telket-a-WING
  9. wing.hu https://wing.hu/hu/projekt/greenway-apartments