Shipping daily
Nov 1DATAAll 646 projects re-verified: 6,419 developer claims tested against registers, courts and pressNov 1DATAMalaysia TEDUH and Philippines DHSUD licence checks: expired licences and approved delays foundNov 1DATAThailand ONEP register: 2 condos found selling before environmental approvalNov 1DATAMexico PROFECO contract register checks: one sales registration belonged to a laundryNov 1DATAAbu Dhabi ADREC inspections and RAK RERA permit list added: % built straight from the regulatorNov 1SHIPPEDNew stage filter: completed but still sellingNov 1SHIPPEDPublic database page: verification levels, disclosure distribution, every marketNov 1DATA+212 projects in one day, round 3: USA, Caribbean, Gulf, Africa, Japan, AustraliaNov 1SHIPPEDStage on every case: off-plan or under constructionOct 31SHIPPEDVerification level per check on every case card: registry, independent, developer, contradicted
Changelog →

Kolaboro / Projects / Georgia

Al Mare Green: reviews and facts

What is published about Al Mare Green in Makhinjauri, Batumi, Georgia, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Location
Makhinjauri, Batumi, Georgia
Stage
stage not published korter.ge
Handover on record
Q4 2027 korter.ge
Permit or licence number
not published
Deposit protection
not researched yet
Page we read
korter.ge korter.ge
Last checked
5 Nov 2026
Open data record
GEO-004

In short

  • Al Mare Green is listed as stage not published in Makhinjauri, Batumi, Georgia, by Midtown Group. korter.ge
  • The handover date on record is Q4 2027. korter.ge
  • No permit or licence number is published in the sources we read. korter.ge
  • Of 6 developer claims we checked, 0 are confirmed by a register or an independent source, 5 are not yet verified and 1 are contradicted by another source. Open data record

What is promised

As published by the developer or on listing pages, in the wording of the source.

  • Unit sizes: 29 - 114 m² korter.ge
  • Unit types: studio, 1BR, 2BR, 3BR, 4BR korter.ge
  • Payment plan: Full payment or TBC Bank mortgage korter.ge
  • Permit authority: Batumi City Hall (construction permit) korter.ge
  • portal: dated construction photos Mar 2025 to Oct 2026 korter.ge
  • portal: layouts studio to 4-room, 29-114 m2, prices on request korter.ge
  • portal: delivery Q4 2027 korter.ge
  • portal: cadastral number 05.34.23.776 (not a permit) korter.ge
  • portal: TBC Bank mortgage or full payment korter.ge
  • intermediary (Alori): 'guaranteed +20% buyback' on promotional units from 1 Jan 2027 korter.ge

Delivery and delay record

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover or completion: Q4 2027 date still ahead
    developer or listing page, copy of 5 Nov 2026 (SHA-256 ab684cadd511b453) korter.ge

Permits and licences

  • No permit or licence number is published in the sources we read.
  • Only cadastral number 05.34.23.776 korter.ge

Live check in the official registers

Queries the official registers we can reach for this country now and shows what each returns. Each answer is hashed (SHA-256); nothing is invented, a register with no data says so.

The six buyer checks

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numbernonot publishedOnly cadastral number 05.34.23.776 korter.ge
Deposit protectionnonot published
Construction progressyesstated only by the developerKorter photos dated Mar 2025 to Oct 2026; no % korter.ge
Floor or site plansyesstated only by the developerLayouts studio to 4-room on Korter korter.ge
Developer track recordyesstated only by the developerKorter developer page: Harmonia and Al Mare (2022) completed korter.ge
No guaranteed returnsyescontradicted by another sourceAlori: 'Guaranteed Buyback: 20%+ (Jan 2027)', 'structured contractually with the developer'; Korter mentions rental potential only korter.ge

Developer claims we tested

Claim (source wording)ResultChecked againstSource
Guaranteed +20% buyback from 1 Jan 2027not verified yet aloriinternationalholdings.com
Delivery Q4 2027not verified yet korter.ge
Building permit issuednot verified yet korter.ge
Midtown completed Al Mare (2022) and Harmonianot verified yet korter.ge
Founded 2014 (Korter) or 2015 (Batumi Estate, Alori)contradicted batumi.estate
Bank mortgage available from TBC Banknot verified yet korter.ge

What changed, with dates

Public reports

What public sources report, with the link. We list reports; we do not judge the developer.

  • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

About the developer

  • Founded: 2014 korter.ge
  • Head office: Batumi, Georgia korter.ge
  • Legal entity: Midtown Group LLC (registration number not published) korter.ge
  • Projects delivered: 2 korter.ge
  • Korter developer page: Harmonia and Al Mare (2022) completed korter.ge

All facts about Midtown Group

Similar projects

Market context: Georgia

  • We track 12 projects in Georgia. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m

All projects in Georgia

Buyer reviews

There are no verified buyer reviews of Al Mare Green yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

Reviews waiting for moderation are not shown.

Bought here? Submit a verified review

Right of reply

Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

Reply as the developer Report a correction Questions to ask the developer

Before you pay

Paste the project link for a free live check of what official registers say. For a full desk review and a site visit by a local agent, order the pre-purchase check.

Free live check Pre-purchase check, €490

Questions buyers ask

Is Al Mare Green legit?

Kolaboro does not label projects or developers. What the public record shows: No permit or licence number is published in the sources we read. Of 6 developer claims we checked, 0 are confirmed by a register or an independent source, 5 are not yet verified and 1 are contradicted by another source. The handover date on record is Q4 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Check the sources on this page and ask the developer for documents before paying.

When will Al Mare Green be delivered?

The handover date on record is Q4 2027.

Who is the developer of Al Mare Green?

Midtown Group, according to the sources listed on this page.

Does Al Mare Green have a permit or licence?

No permit or licence number is published in the sources we read.

Are there reviews of Al Mare Green?

There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

Sources

Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

  1. korter.ge https://korter.ge/en/al-mare-green-batumi
  2. batumi.estate https://batumi.estate/en/developers/midtown-group
  3. korter.ge https://korter.ge/en/midtown-group
  4. aloriinternationalholdings.com https://www.aloriinternationalholdings.com/investment-opportunity/beachside-residential-to...
  5. midtowngroup.ge https://www.midtowngroup.ge/

Archived copies of the page we read (Internet Archive)

Last checked 5 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

Protect my purchase