Kolaboro / Off-plan projects we track
Compare off-plan projects side by side
Two or three projects on the same facts: developer, location, handover date on record, permit number, prices as published, transparency score and when we last checked.
| Compare | The Rider at Wynwood × | Edition Residences Miami × |
|---|---|---|
| Developer | Cipres and Rilea Group | Two Roads Development |
| Location | 94 NE 29th Street, Wynwood, Miami, Miami, USA | Edgewater (2121 N Bayshore Dr), Miami, Miami, USA |
| Stage | Under construction | Off-plan |
| Handover on record | second half of 2027 | second half of 2029 |
| Permit number | Not published | Florida DBPR condominium filing PR77415; Miami-Dade demolition permit 2026067492 for the existing Biscayne 21 building (issued 26 Aug 2026, not a building permit for the tower) |
| Prices as published | Not published | USD 1,700,000 |
| Transparency score | 29 of 100 | 50 of 100 |
| Rank for transparency | #16 of 39 in Miami | #13 of 39 in Miami |
| Last checked | 12 Nov 2026 | 5 Nov 2026 |
| Facts and sources | Open | Open |
Facts as published by each developer and the registers we read, each with its source on the project page. No verdicts: a higher transparency score means more is published and checkable, not that a project is better. Transparency score