Kolaboro / UAE / Sharjah / Arada
Safa at Aljada
Public records and facts
Kolaboro ID: SHJ-015
What is published about Safa at Aljada in Aljada (West Boulevard), Sharjah, UAE, what official registers and other sources say, and what changed over time. Facts only, each with its source.
Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work
Is it safe? What we know and what we do not: Known: handover date, website, official lists. Not known yet: permit, company, construction.
Six checks at a glance
Last checked 25 Nov 20261 source
- Permitno number published
- Companyno legal name found
- Handover datedate published
- Constructionnot checked yet
- Websiteall our checks passed
- Official listsno match on sanctions and warning lists
Next question to ask Ask for the permit or licence number and look it up in the official register. All questions
What each colour means
- Green: published or confirmed.
- Amber: partly.
- Red: not published or the date passed.
- Grey: not checked yet.
Facts, not a verdict.
Safa at Aljada is listed as under construction in Aljada (West Boulevard), Sharjah, UAE, by Arada. The handover date on record is Q2 2028. No permit number is published. Transparency score: 28 of 100, rank 10 of 16 in Sharjah. Not yet reviewed by Kolaboro (added 25 Nov 2026). There are no verified buyer reviews yet.
The 10 key facts, by where they come from Facts, not a verdict. Each value, its source and date are in the record. How we verify a fact
Confirmed 0 of 10
In an official register or by our satellite reading
Published, not confirmed 1 of 10
By the developer, a listing portal or another web page
- Handover date
Not found yet 9 of 10
- Permit or registration number
- Units
- Starting price
- Developer legal entity
- Escrow or deposit protection
- Construction progress
- Satellite reading (built-up share, first > last)
- Official register entry
- Court cases on record (developer)
Not reviewed yet: no official register looked up for this project so far.
- 1 source: 1 developer. Sources
- Facts last checked on 25 Nov 2026.
- What we cannot know from public sources · Who pays us, conflicts of interest
- Something wrong? Use the flag button next to any line, or write to hello@kolaboro.com.
All key facts
- Location
- Aljada (West Boulevard), Sharjah, UAE
- Stage
- under construction arada.com
- Handover on record
- Q2 2028 arada.com
- Permit or licence number
- not published
- Kolaboro
- Not yet reviewed by Kolaboro (added 25 Nov 2026)
- Deposit protection
- not yet reviewed
- Page we read
- arada.com arada.com
- Last checked
- 25 Nov 2026
- Open data record
- SHJ-015
Ranked #10 of 16 for transparency in Sharjah
One email when what is published about Safa at Aljada changes: handover date, prices, documents or register results. We check every day; first we send a link to confirm your address.
Free: a PDF report of Safa at Aljada with every fact and its source. The link appears here once you add your email. Download the free PDF report
We send a link to confirm first. Every email has a link to stop.
In short
The record field by field: 1 of 10 key facts held, each with its source and date; 9 still unknown, with how to find them.One-page brief to print
Arada: 13 projects in our record, 4 followed day by day; 0 had their handover moved later and 1 have a passed date while the register shows building unfinished. Developer timeline
Document checklistPayment plan stress testDeveloper timelineFind a project by permit or register number
Is Safa at Aljada legit? What we could check
Transparency score 28 of 100, computed on 25 Nov 2026 from public sources. kolaboro.com
What is published and checkable about Safa at Aljada, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.
Published or confirmed: 3 of 10 items we could check.
This checklist is computed from public facts; our own review of this project is not done yet.
- Developer identified by legal name: No legal company name in the pages we read 0 of 10
- Developer found in an official company register: Not found in the global company register (GLEIF) under this exact name 0 of 5GLEIF
- Permit or licence number published: No permit or licence number in the pages we read 0 of 15
- Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
- Handover date published: Published: Q2 2028 10 of 10
- Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
- Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
- Address or plot location published: No precise address or plot location published 0 of 10
- Developer website health: answers; valid security certificate (TLS); domain registered for 60+ days more; no lookalike-domain notice 10 of 10kolaboro.com
- Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
- Price published: No price in the pages we read 0 of 5
- page we read: arada.com Kolaboro
How much does Safa at Aljada cost?
- Prices and payment plan as published on the pages we read (copy of 25 Nov 2026). arada.com
- Price: not published in the pages we read.
- Construction start: March 2026 arada.com
- Handover promised: Q2 2028 arada.com
- 2 statements of the developer or listing are compared with the records in "Developer claims we tested".
Payment plan of Safa at Aljada
- No payment plan was published on the pages we read (read on 25 Nov 2026).
Unit types, sizes and floor plans of Safa at Aljada
- No unit types, sizes or floor plans were published on the pages we read (read on 25 Nov 2026).
Total cost to buy at Safa at Aljada: taxes and fees
Purchase taxes and fees in UAE: not published in our country guide yet. Work it out with your own figures
Prices over time
We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON
Price per m² against official data
No official comparison available for this project. The developer does not publish both a starting price and a unit size, so there is no price per m² to compare.
Compared only with official open data (registered sale prices or official appraised values). How we use data.
When will Safa at Aljada be completed?
Handover on record: Q2 2028, as seen on arada.com on 25 Nov 2026.
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover date on record: Q2 2028. Not moved in our records. arada.com
- No dated promise found in the sources we read.
Delivery forecast
Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.
No dated handover promise in our records, so there is no forecast.
Where it should be by now
By today (25 Nov 2026), the developer's own schedule says:
- Construction start: due by March 2026 (8 months ago).
- Next on the schedule: Handover or completion, Q2 2028 (in 17 months).
Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself
Dated promises on record: 2, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.
Permits and licences
No permit or licence number published in the sources we read (checked 25 Nov 2026).
- No permit or licence number is published in the sources we read.
Live check in the official registers
Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.
Developer claims we tested
| What the developer or listing says | What the records show |
|---|---|
| Arada release of 12 Mar 2026: main construction contract awarded for the five Safa buildings on West Boulevard (contractor China Tiesiju Civil Engineering Group); the two contracts cover 2,210 homes in 14 blocks arada.com developer | not verified yet developer |
| Arada release of 12 Mar 2026: contracts run over 26 months, with all blocks scheduled to be delivered in the second quarter of 2028; units from one to four bedrooms; the release says construction is now under way on more than 2,200 new homes arada.com developer | not verified yet developer |
What changed, with dates
Last checked 25 Nov 2026.
Nothing to compare yet: changes show here once we hold a second dated copy (first copy 25 Nov 2026).
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
Who is the developer of Safa at Aljada?
Developer as published: Arada, on arada.com (checked 25 Nov 2026).
- Safa at Aljada is developed by Arada, as published on the pages we read. Projects by Arada that we track: 13. arada.com
- Dated promises on record: 5; 0 kept, 0 passed without delivery, 0 moved later, 4 still ahead. promise tracker
- Projects of Arada we track: 13 (not yet completed: 13, completed: 0). kolaboro.com
- 1 of the 13 projects by Arada on our record is past its handover date. Projects by Arada with a delay
Other Arada projects in Sharjah
- The Gate 6 at Aljada Aljada (West Boulevard)
- Dalia at Masaar 3 Masaar 3, Rowdat / Suyoh area
- Jenna (Aljada) Aljada, Sharjah
- Layan at Masaar 3 Masaar 3, Suyoh, Sharjah
- Masaar 2 Masaar 2, Suyoh, Sharjah
- Nesba at Aljada Aljada (East Boulevard), Sharjah
- The Gate 3-4 at Aljada Aljada (East Boulevard), Sharjah
Other projects by Arada that we track
Website health
We check the developer's own website once a day: whether the homepage answers, when its TLS certificate and its domain registration expire, and when it was last updated. A site that stops answering or lets its domain lapse is a reason to ask questions, not proof of anything.
Website arada.com
- The homepage answered with HTTP 200 on 24 Nov 2026 (2.5 s). homepage
- Answered on all of the last 7 daily checks. our daily checks
- Answered on 7 daily checks in a row. our daily checks
- Security certificate (TLS) expires 24 Jan 2027. certificate log
- Domain registration expires 5 Sept 2027. domain register (RDAP)
- Domain registered on 5 Sept 2001 (25 years before our check), registry RDAP, read 24 Nov 2026 domain register (RDAP)
- TLS certificate issued by Google Trust Services on 26 Oct 2026 (certificate transparency log, read 24 Nov 2026) crt.sh
- Newest date in the site's sitemap: 16 Nov 2026. sitemap
Last 17 daily checks, oldest first
Checked 24 Nov 2026. Method and data: One request to the homepage per domain per day, user agent KolaboroResearchAgent, after reading robots.txt (weekly). TLS expiry from the certificate the server presents; domain expiry from the registry RDAP record (weekly); sitemap weekly. No page text is kept.
Alternatives to Safa at Aljada
Projects in Sharjah with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 28 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works
This project publishes no price, so we cannot list alternatives by price in Sharjah.
Compared side by side
Market context: Sharjah
- We track 16 projects in Sharjah. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m/sharjah/
- In Sharjah, fewer than 5 projects are past their first handover date on record. Across all markets: a median of 6 months past (282 projects). How this is computed
- Delay index for Sharjah: the handover date on record moved for 1 of 10 projects with a dated promise; mean shift over all of them: 4.2 months; over those that moved: 42 months. kolaboro.com/handover
How this record compares with Sharjah, field by field
Supply at handover: 6 other projects in Sharjah have a handover date in 2028. Handover pipeline by year
Compare with the closest projects
The three projects in the same market with the nearest handover date (same area first), with the facts we hold and how many an official register confirms.
| Project | Area | Handover date | Fields held | Confirmed by a register |
|---|---|---|---|---|
| Safa at Aljada | Aljada (West Boulevard), Sharjah | Q2 2028 | 1 / 10 | 0 |
| Sukoon by Sanzen | Al Tay East, Al Suyoh | 2028-Q2 | 3 / 10 | 0 |
| Nesba at Aljada | Aljada (East Boulevard), Sharjah | Q2 2028 | 1 / 10 | 0 |
| The Gate 3-4 at Aljada | Aljada (East Boulevard), Sharjah | Q2 2028 | 1 / 10 | 0 |
Buyer reviews
There are no verified buyer reviews of Safa at Aljada yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
No reply from the developer on record (checked 25 Nov 2026).
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Questions to ask the developer about Safa at Aljada
- What is the permit or licence number of Safa at Aljada, which authority issued it, and on what date?
- What is the legal name and registration number of the company that sells the units and signs the contract?
- Is the handover date of Q2 2028 written into the contract, with a penalty if it is missed?
- Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
- Can you send dated photos or the latest inspection report of the construction?
Prepare these questions as an email · All questions, with the reason for each
Before you pay
Before you sign: your checklist for UAE
Tick each step as you do it. Your ticks stay in this browser only.
Buyer journey for this project, from reservation to handover
Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are on request: we confirm a local agent for your location before you pay.
What next
- Compare with similar projects
- Alert me if the date or price changes
- Ask the developer
- Timeline of every dated record
- Embed these facts on your site
Share this page: WhatsApp My projects
Questions buyers ask
Is Safa at Aljada legit?
Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 25 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is Q2 2028. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 3 of 10 items we could check. Transparency score: 28 of 100, rank 10 of 16 in Sharjah. Check the sources on this page and ask the developer for documents before paying.
Where is Safa at Aljada?
Safa at Aljada is in Aljada (West Boulevard), Sharjah, UAE, according to the sources listed on this page. Pin on the map: none, because no address or coordinates precise enough are published.
When will Safa at Aljada be completed?
The handover date on record is Q2 2028.
Is Safa at Aljada delayed?
The handover date on record is Q2 2028.
Who is the developer of Safa at Aljada?
Arada, according to the sources listed on this page. Projects by Arada that we track: 13. Dated promises on record: 5; 0 kept, 0 passed without delivery, 0 moved later, 4 still ahead.
Does Safa at Aljada have a permit or licence?
No permit or licence number is published in the sources we read.
What do buyers say about Safa at Aljada?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
How much does Safa at Aljada cost?
No price is published in the pages we read. Ask the developer for the current price list.
What is the payment plan of Safa at Aljada?
No payment plan was published on the pages we read (read on 25 Nov 2026).
What unit types and sizes does Safa at Aljada have?
No unit types, sizes or floor plans were published on the pages we read (read on 25 Nov 2026).
What is the transparency score of Safa at Aljada?
Transparency score: 28 of 100, rank 10 of 16 in Sharjah. It counts what is published and checkable, not quality.
When was Safa at Aljada last checked, and what changed?
Last checked 25 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 25 Nov 2026). No change to the published facts is recorded.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- arada.com developer
Archived copies of the page we read (Internet Archive)
Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate
Last checked 25 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.