BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Safa at Aljada: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/safa-at
 -aljada-arada/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:SHJ-015-construction_start-1@kolaboro.com
DTSTAMP:20261125T000000Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:Safa at Aljada: Construction start\, promised for March 2026
DESCRIPTION:Date published by the developer: March 2026.\nSource: https://w
 ww.arada.com/en/latest_news/arada-awards-contracts-valued-at-more-than-aed
 2-billion-to-build-14-apartment-blocks-in-sharjah-megaproject-aljada/ (rea
 d on 25 Nov 2026).\nRecord with all sources: https://kolaboro.com/projects
 /safa-at-aljada-arada/#delivery\nThis is the developer's date\, not a conf
 irmation by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/safa-at-aljada-arada/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:SHJ-015-handover-1@kolaboro.com
DTSTAMP:20261125T000000Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:Safa at Aljada: Handover or completion\, promised for Q2 2028
DESCRIPTION:Date published by the developer: Q2 2028.\nSource: https://www.
 arada.com/en/latest_news/arada-awards-contracts-valued-at-more-than-aed2-b
 illion-to-build-14-apartment-blocks-in-sharjah-megaproject-aljada/ (read o
 n 25 Nov 2026).\nRecord with all sources: https://kolaboro.com/projects/sa
 fa-at-aljada-arada/#delivery\nThis is the developer's date\, not a confirm
 ation by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/safa-at-aljada-arada/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
