Kolaboro / Malaysia / Paramount Property

The Atera: reviews and facts

Kolaboro ID: MYS-053

What is published about The Atera in Petaling Jaya, Selangor, Malaysia, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Is it safe? What we know and what we do not: Known: permit, company, handover date, official lists. Not known yet: construction, website.

Six checks at a glance

Last checked 22 Nov 20263 sources

Next question to ask Find the developer company in the official company register of Malaysia. All questions

What each colour means
  • Green: published or confirmed.
  • Amber: partly.
  • Red: not published or the date passed.
  • Grey: not checked yet.

Facts, not a verdict.

The Atera is listed as under construction in Petaling Jaya, Selangor, Malaysia, by Paramount Property. The handover date on record is Q4 2027. A permit number is published. Transparency score: 94 of 100. 13 of 17 developer claims we tested are confirmed. There are no verified buyer reviews yet. Last checked 22 Nov 2026.

Did you buy here? Tell us

The 10 key facts, by where they come from Facts, not a verdict. Each value, its source and date are in the record. How we verify a fact

  • 0 / 10 Confirmed in an official register or by our satellite reading
  • 4 / 10 Published by the developer, a listing portal or another web page, not yet confirmed: Handover date, Permit or registration number, Starting price, Developer legal entity
  • 6 / 10 Not found yet: Units, Escrow or deposit protection, Construction progress, Satellite reading (built-up share, first > last), Official register entry, Court cases on record (developer)

Malaysian housing developer register (KPKT TEDUH)

What the official register of the Ministry of Housing and Local Government says about this project, entry by entry. Dates are those printed on the register.

Register entry 30161-1

Register status
As printed ()
Advertising and sales permit
30161-1/10-2026/0845(A)-(S) valid 28 Oct 2025 to 27 Oct 2026 expired on 27 Oct 2026
Source
teduh.kpkt.gov.my read 23 Nov 2026

Register entry {c}

Register status
On track (Lancar)
Construction progress (latest report)
46%
Vacant possession due
9 Jun 2027 (first sale agreement 9 Jun 2024, delivery period 36 months)
Approved extension
16 months approved, new date 9 Oct 2028
Developer licence
30161/08-2027/0160(A) valid to 25 Aug 2027
Source
teduh.kpkt.gov.my read

Register entry 30161-2

Register status
As printed ()
Advertising and sales permit
30161-2/04-2027/0314(A)-(S) valid 16 Apr 2024 to 15 Apr 2027 expires in 143 days
Source
teduh.kpkt.gov.my read 23 Nov 2026

Register status of every Malaysian project we track · Paramount Property: register record across markets

Official register: Permit or licence number, Deposit protection · Not found: Construction progress, Floor or site plans, Developer track record, No guaranteed returns
All key facts
Location
Petaling Jaya, Selangor, Malaysia
Stage
under construction rumavi.com
Handover on record
Q4 2027 rumavi.com
Permit or licence number
Developer licence 30161/08-2027/0160(A); Advertising and sales permit 30161-1/10-2026/0845(A)-(S) rumavi.com
Deposit protection
stated rumavi.com
Page we read
rumavi.com
listing page (not the developer's site) rumavi.com
Last checked
22 Nov 2026
Open data record
MYS-053
Alert me if the date or price changes

One email when what is published about The Atera changes: handover date, prices, documents or register results. We check every day; first we send a link to confirm your address.

Free: a PDF report of The Atera with every fact and its source. The link appears here once you add your email.

We send a link to confirm first. Every email has a link to stop.

Follow changes in a feed reader: Atom JSON Feed API

In short

  • The Atera is listed as under construction in Petaling Jaya, Selangor, Malaysia, by Paramount Property. rumavi.com
  • The handover date on record is Q4 2027. rumavi.com
  • A permit or licence number is published. rumavi.com
  • Of 17 developer claims we checked: 13 confirmed by a register or an independent source, 4 not yet verified, 0 contradicted by another source. Open data record

The record field by field: 4 of 10 key facts held, each with its source and date; 6 still unknown, with how to find them. · One-page brief to print

Is The Atera legit? What we could check

Transparency score 94 of 100, computed on 23 Nov 2026 from public sources. kolaboro.com

kolaboro.com

What is published and checkable about The Atera, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.

Published or confirmed: 8 of 9 items we could check.

  • Developer identified by legal name: Legal name: Aneka Sepakat Sdn. Bhd. 10 of 10
  • Developer found in an official company register: Not found in the global company register (GLEIF) under this exact name 0 of 5GLEIF
  • Permit or licence number published: Number published: Developer licence 30161/08-2027/0160(A); Advertising and sales permit 30161-1/10-2026/0845(A)-(S) 15 of 15
  • Permit confirmed by a register or independent source: Confirmed (registry) 5 of 5kolaboro.com
  • Handover date published: Published: Q4 2027 10 of 10
  • Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
  • Deposit protection stated: Escrow, bank guarantee or insurance stated 15 of 15
  • Address or plot location published: Precise enough for a map pin 10 of 10
  • Developer website health: Developer website not checked by us Not checked by us: left out of this project's total.
  • Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
  • Price published: Price published 5 of 5
  • page we read: rumavi.com Kolaboro

How the transparency score is made

How much does The Atera cost?

Payment plan of The Atera

  • No payment plan was published on the pages we read (read on 22 Nov 2026).

Unit types, sizes and floor plans of The Atera

  • Unit types: 2-bedroom apartment, 3-bedroom apartment, 4-bedroom apartment rumavi.com
  • Unit sizes: 72 - 132 m² rumavi.com
  • Units: 756 rumavi.com
  • Page read on 22 Nov 2026.
Unit typesSizePrice fromPrice per m² (from)Median in Malaysia
2-bedroom apartment, 3-bedroom apartment, 4-bedroom apartment72 - 132 m²MYR 503,000MYR 6,986MYR 11,358

Starting price divided by the smallest size, as published; not per unit type. Median of 45 projects in Malaysia with both figures, same currency.

Total cost to buy at The Atera: taxes and fees

Purchase taxes and fees in Malaysia: not published in our country guide yet. Work it out with your own figures

Prices over time

We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON

Price per m² against official data

  • Project, as advertised: MYR 6986 per m² (starting price MYR 503000 divided by the smallest unit size 72 m²; the cheapest unit may not be the smallest) developer page

No official comparison available for this project. We know of no official open dataset of sale prices per m² for Malaysia that we can compare with.

Compared only with official open data (registered sale prices or official appraised values). How we use data.

When will The Atera be completed?

Handover on record: Q4 2027, as seen on rumavi.com on 22 Nov 2026.

rumavi.com

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover date on record: Q4 2027. Not moved in our records. rumavi.com
  • No dated promise found in the sources we read.

Delivery forecast

Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.

No dated handover promise in our records, so there is no forecast.

Where it should be by now

By today (23 Nov 2026), the developer's own schedule says:

  • No promised date has come due yet.
  • Next on the schedule: Handover or completion, Q4 2027 (in 11 months).

Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself

Dated promises on record: 1, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.

Permits and licences

Permit or licence number Developer licence 30161/08-2027/0160(A); Advertising and sales permit 30161-1/10-2026/0845(A)-(S), published by rumavi.com.

rumavi.com

  • Number published: Developer licence 30161/08-2027/0160(A); Advertising and sales permit 30161-1/10-2026/0845(A)-(S). rumavi.com
  • Official register for Malaysia: KPKT TEDUH (opens in a browser, checked 13 Nov 2026) teduh.kpkt.gov.my

Live check in the official registers

Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.

Where is The Atera?

Location as published: Petaling Jaya, Selangor, Malaysia, on rumavi.com (checked 22 Nov 2026).

rumavi.com

  • Area as published: Petaling Jaya, Selangor, Malaysia. rumavi.com
  • Pin on the map: from a published address or coordinates. rumavi.com

Map © OpenStreetMap contributors. Pin as recorded.

The six buyer checks

3 of 6 buyer checks public, 2 confirmed by a register or an independent source (checked 22 Nov 2026). kolaboro.com

kolaboro.com

Public means the information is published. The level says who confirms it. Method: how we score.

CheckPublicWho confirms itWhat we found
Permit or licence numberyesconfirmed in an official register
Deposit protectionyesconfirmed in an official register
Construction progressnonot published
Floor or site plansnonot published
Developer track recordnonot published
No guaranteed returnsyesnot published

Developer claims we tested

What the developer or listing saysWhat the records show
Development profile lists The Atera by Paramount Property in Petaling Jaya, Selangor, Malaysia, status "Under Construction", expected completion "Q4 2027" (profile dated 2026-07-16, read 22 Nov 2026) rumavi.com
listing portal
not verified yet
756 units in total, 48 floors as listed on the profile rumavi.com
listing portal
not verified yet
Listed price range on the profile: MYR 503,000 to MYR 1,374,471 (asking prices as listed, read 22 Nov 2026) rumavi.com
listing portal
not verified yet
4 unit types listed on the profile: 2 Bedroom, 72 sqm, MYR 520,000; City 3 Bedroom, 100 sqm, MYR 850,000; City/Park 4 Bedroom, 120 sqm, MYR 1,200,000; Panoramic Dual-Key, 132 sqm, MYR 1,462,300 rumavi.com
listing portal
not verified yet
Phase 30161-1 (matches the 756 units on this record): KPKT TEDUH register lists advertising and sales permit 30161-1/10-2026/0845(A)-(S) for The Atera (project code 30161-1), valid 2025-10-28 to 2026-10-27 (register read 23 Nov 2026) teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-1 (matches the 756 units on this record): Developer Aneka Sepakat Sdn. Bhd. holds KPKT developer licence 30161/08-2027/0160(A) (valid 2022-08-26 to 2027-08-25); register status Aktif teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-1 (matches the 756 units on this record): Register overall status "Siap Dengan CCC" (Malay for completed with CCC), construction progress 100.00% per component (latest 7(f) report in HIMS) teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-1 (matches the 756 units on this record): 756 units on the register (serviced apartments), up to 48 floors teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-1 (matches the 756 units on this record): Register price range for the units: RM 270,000 to RM 1,374,500 teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-1 (matches the 756 units on this record): Sale agreement type Jadual H (Housing Development Act statutory form, stage payments into a Housing Development Account), delivery period 36 months; first sale agreement 11 November 2022, vacant possession due 11 November 2025; the register records an approved extension of 24 months, new vacant possession date 11 November 2027 teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-2 (a second phase of 876 units, not counted in the 756 on this record): KPKT TEDUH register lists advertising and sales permit 30161-2/04-2027/0314(A)-(S) for The Atera (project code 30161-2), valid 2024-04-16 to 2027-04-15 (register read 23 Nov 2026) teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-2 (a second phase of 876 units, not counted in the 756 on this record): Developer Aneka Sepakat Sdn. Bhd. holds KPKT developer licence 30161/08-2027/0160(A) (valid 2022-08-26 to 2027-08-25); register status Aktif teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-2 (a second phase of 876 units, not counted in the 756 on this record): Register overall status "Lancar" (Malay for on track), construction progress 46.00% per component (latest 7(f) report in HIMS) teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-2 (a second phase of 876 units, not counted in the 756 on this record): 876 units on the register (serviced apartments), up to 51 floors teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-2 (a second phase of 876 units, not counted in the 756 on this record): Register price range for the units: RM 270,000 to RM 1,462,300 teduh.kpkt.gov.my
official register
verified Official register
Phase 30161-2 (a second phase of 876 units, not counted in the 756 on this record): Sale agreement type Jadual H (Housing Development Act statutory form, stage payments into a Housing Development Account), delivery period 36 months; first sale agreement 9 June 2024, vacant possession due 9 June 2027; the register records an approved extension of 16 months, new vacant possession date 9 October 2028 teduh.kpkt.gov.my
official register
verified Official register
KPKT TEDUH register status for phase 30161-1 is "Siap Dengan CCC" (completed with a certificate of completion and compliance), 100% built; the record stage was not changed in this pass teduh.kpkt.gov.my
official register
verified Official register

Claim evidence · Record history API

What changed, with dates

Last checked 22 Nov 2026.

Nothing to compare yet: changes show here once we hold a second dated copy (first copy 22 Nov 2026).

    Public reports

    What public sources report, with the link. We list reports; we do not judge the developer.

    • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

    Who is the developer of The Atera?

    Developer as published: Paramount Property, on rumavi.com (checked 22 Nov 2026).

    rumavi.com

    • The Atera is developed by Paramount Property, as published on the pages we read. Projects by Paramount Property that we track: 2. rumavi.com
    • Dated promises on record: 1; 0 kept, 0 passed without delivery, 0 moved later, 1 still ahead. promise tracker
    • Legal entity: Aneka Sepakat Sdn. Bhd. rumavi.com
    • Projects of Paramount Property we track: 2 (not yet completed: 2, completed: 0). kolaboro.com
    • None of the 2 projects by Paramount Property on our record is past its handover date.
    • Official company register (Malaysia): KPKT TEDUH teduh.kpkt.gov.my

    Other projects by Paramount Property that we track

    All facts about Paramount Property Delivery record of Paramount Property

    Alternatives to The Atera

    Projects in Malaysia with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 94 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works

    Compared side by side

    Similar projects

    Closest projects with a pin: Pangsapuri Servis Ceria (3.1 km), Residensi Newurban (3.1 km), Kondominium Stellar Damansara (3.9 km). Compare the four side by side

    Market context: Malaysia

    • We track 272 projects in Malaysia. 93% publish a permit or licence number and 93% state deposit protection. kolaboro.com/m/malaysia/
    • In Malaysia, 17 tracked projects are past their first handover date on record: a median of 4 months (range 1 to 47). Historical statistic from our records, not a forecast. How this is computed
    • Delay index for Malaysia: the handover date on record moved for 10 of 15 projects with a dated promise; mean shift over all of them: 19 months; over those that moved: 28.5 months. kolaboro.com/handover

    All projects in Malaysia

    Malaysia, November 2026: monthly data story

    How this record compares with Malaysia, field by field

    Buyer reviews

    There are no verified buyer reviews of The Atera yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

    Reviews waiting for moderation are not shown.

    Bought here? Submit a verified review

    How we moderate reports and replies

    Right of reply

    No reply from the developer on record (checked 22 Nov 2026).

    Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

    Reply as the developer Report a correction Questions to ask the developer

    Questions to ask the developer about The Atera

    1. What is the legal name and registration number of the company that sells the units and signs the contract?
    2. Is the handover date of Q4 2027 written into the contract, with a penalty if it is missed?
    3. Can you send dated photos or the latest inspection report of the construction?
    4. Who owns the land, and can I see the title or lease document?

    Prepare these questions as an email · All questions, with the reason for each

    Before you pay

    Before you sign: your checklist for Malaysia

    Tick each step as you do it. Your ticks stay in this browser only.

    Buyer journey for this project, from reservation to handover

    Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are on request: we confirm a local agent for your location before you pay.

    Free live check Pre-purchase check, €490

    Buying off-plan in Malaysia: what to check

    What next

    Share this page: WhatsApp My projects

    Questions buyers ask

    Is The Atera legit?

    Kolaboro does not label projects or developers. What the public record shows: A permit or licence number is published. Of 17 developer claims we checked: 13 confirmed by a register or an independent source, 4 not yet verified, 0 contradicted by another source. The handover date on record is Q4 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 8 of 9 items we could check. Transparency score: 94 of 100. Check the sources on this page and ask the developer for documents before paying.

    Where is The Atera?

    The Atera is in Petaling Jaya, Selangor, Malaysia, according to the sources listed on this page. Pin on the map: from a published address or coordinates.

    When will The Atera be completed?

    The handover date on record is Q4 2027.

    Is The Atera delayed?

    The handover date on record is Q4 2027.

    Who is the developer of The Atera?

    Paramount Property, according to the sources listed on this page. Projects by Paramount Property that we track: 2. Dated promises on record: 1; 0 kept, 0 passed without delivery, 0 moved later, 1 still ahead.

    Does The Atera have a permit or licence?

    A permit or licence is confirmed in an official register (see Permits and licences).

    What do buyers say about The Atera?

    There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

    How much does The Atera cost?

    The lowest price in the sources we read is MYR 503,000 and the highest MYR 1,374,471. Prices are as published and can change; ask the developer for the current price list.

    What is the payment plan of The Atera?

    No payment plan was published on the pages we read (read on 22 Nov 2026).

    What unit types and sizes does The Atera have?

    As published: 2-bedroom apartment, 3-bedroom apartment, 4-bedroom apartment; 72 - 132 m²; Units: 756.

    Is Paramount Property a registered company?

    Legal entity: Aneka Sepakat Sdn. Bhd. Source: our research record of The Atera.

    What is the transparency score of The Atera?

    Transparency score: 94 of 100. It counts what is published and checkable, not quality.

    When was The Atera last checked, and what changed?

    Last checked 22 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 22 Nov 2026). No change to the published facts is recorded.

    Sources

    Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

    1. rumavi.com listing portal
    2. teduh.kpkt.gov.my /api/projek-swasta/30161-1 official register
    3. teduh.kpkt.gov.my /api/projek-swasta/30161-2 official register

    Archived copies of the page we read (Internet Archive)

    Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate

    Last checked 22 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

    Check this project€490 · written report usually within 7 days