Shipping daily
Nov 9SHIPPEDFull working test of the site (checks, tools, accounts, feeds, API): a saved X-ray now shows in your dashboard, project pages have a Save to my list button again, and the update feed is currentNov 9SHIPPEDSecurity hardening: pages now refuse inline script handlers, links built from third-party data cannot run scripts, the map and text-reading libraries are pinned with integrity hashes, and payment-check lookups are rate limitedNov 9SHIPPEDSpeed: the browser no longer restyles the whole page after every small change, project and developer pages are answered from an edge copy before any data is read, sections far from the screen are drawn as you get near them, and the open numbers page keeps its figures for a minuteNov 9SHIPPEDLookalike websites: a daily watch for new websites whose names resemble the developer and project websites we track, with registration and certificate dates, on developer pages and at /watch/lookalikes/Nov 9DATASanctions lists: developer company names are screened daily against the entity entries of the OFAC, UK and UN lists; developer pages show the lists and date when there is no matchNov 9DATACorporate family on developer pages: parents and subsidiaries from the GLEIF register (CC0) for 39 developers matched by exact legal name, and a new family link type in the developer graphNov 9DATATwo Birmingham project pins corrected (they sat one degree too far north); their map-based sections stay hidden until the next monthly rebuild uses the new pinsNov 9SHIPPEDProtected land near the pin on 125 project pages: Natura 2000 sites within 2 km, England green belt and other designations, the Spanish coast law easements and mapped nature reserves, with distances and layer datesNov 9SHIPPEDThe map's own history at each plot: when the buildings, roads and land use within 150 m were first drawn in OpenStreetMap and last changed, as a small timeline on 125 project pagesNov 9SHIPPEDSite check on 560 page views and 3,078 links: the two account checks merged into one, clearer tool descriptions and jump links, a country search, an accessible pricing table and a tidier free check on phonesNov 9SHIPPEDShort-let reality check on 28 project pages: Inside Airbnb listings within 1 km, median nightly price and their occupancy estimate, next to any rental yield the page we track printsNov 9DATARecorded sale prices within 1 km on 14 project pages: HM Land Registry (England), DVF (France) and NYC rolling sales, medians and price per m2 next to the developer's own headline priceNov 9SHIPPEDProject and developer pages are easier to read: identical price copies merged into one row, the overdue date sits next to the date it is about, correct singular wording, Arabic names no longer flip punctuation, and the website-health method is translatedNov 9SHIPPEDAny plot from space: pin any spot and get one clear Sentinel-2 picture per quarter since 2017, made on demand, and turn it or a project's time machine into a shareable time-lapse GIFNov 8DATASatellite images back to January 2017: the monthly Sentinel-2 series on 125 project pages now covers almost ten yearsNov 8SHIPPEDSee the site: open street-level photos within 200 m of the pin on 59 project pages, and a 3D view with terrain and 12,328 mapped buildings on 125
Changelog →

Kolaboro / Tools / Resale exit

Can you sell before handover?

Selling an off-plan unit before it is finished usually means assigning your contract to a new buyer. Answer eight questions from your contract. See how flexible your exit is and what to ask the developer before you count on it.

Your purchase

1Does the contract allow assignment before handover?

Look for "assignment", "transfer of rights", "resale" or "nomination".

2Does the developer have to consent?
3Is there an assignment or transfer fee?
4Must you have paid a minimum share first?
5Is there a lock-in period after signing?

A time during which you cannot resell at all.

6Where is the assignment recorded?
7Do you know the taxes and fees on an assignment?

Transfer taxes, capital gains on your profit, registration fees, and who pays each.

8Is there a buyer of last resort?

A written buy-back, a developer resale programme, or a right to sell back at a set price.

Exit flexibility

0/ 100

Higher means an easier exit before handover. It reads only what you answer about the contract, not the market: a flexible contract does not mean there is a buyer at your price.

Before you count on reselling

What to ask the developer

    How the score works

    • 25 points: assignment allowed in writing (8 if silent, 0 if forbidden; a ban caps the score at 20).
    • 15: no developer consent needed (10 with written conditions, 4 at discretion).
    • 15: no fee (12 up to 1%, 9 up to 2%, 5 up to 4%, 2 above).
    • 15: no minimum share paid (12 up to 20%, 8 up to 40%, 4 above).
    • 10: no lock-in (7 up to 6 months, 4 up to 12, 1 longer).
    • 10: recorded in an official registry (5 developer records only).
    • 5: taxes confirmed (3 roughly). 5: written buyer of last resort (2 if only promised).
    • "Not sure" scores low on purpose: an unknown term is a risk until you see it in writing. Nothing you enter leaves your browser.
    Protect my purchase