Shipping daily
Changelog →

Kolaboro / UAE / Abu Dhabi / Aldar Properties

Talay at Marsa Al Saadiyat: reviews and facts

Kolaboro ID: AUH-041

What is published about Talay at Marsa Al Saadiyat in Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, UAE, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work

Is it safe? What we know and what we do not: Known: company, website, official lists. Not known yet: permit, handover date, construction.

Six checks at a glance

Last checked 23 Nov 20261 sources

Next question to ask Ask for the permit or licence number and look it up in the official register. Look the project up in ADREC (Abu Dhabi Real Estate Centre). All questions

What each colour means
  • Green: published or confirmed.
  • Amber: partly.
  • Red: not published or the date passed.
  • Grey: not checked yet.

Facts, not a verdict.

Talay at Marsa Al Saadiyat is listed as off-plan in Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, UAE, by Aldar Properties. No handover date is published in the sources we read. No permit number is published. Transparency score: 18 of 100, rank 10 of 13 in Saadiyat Island. Not yet reviewed by Kolaboro (added 23 Nov 2026).

Did you buy here? Tell us

The 10 key facts, by where they come from Facts, not a verdict. Each value, its source and date are in the record. How we verify a fact

  • 0 / 10 Confirmed in an official register or by our satellite reading
  • 0 / 10 Published by the developer, a listing portal or another web page, not yet confirmed
  • 10 / 10 Not found yet: Handover date, Permit or registration number, Units, Starting price, Developer legal entity, Escrow or deposit protection, Construction progress, Satellite reading (built-up share, first > last), Official register entry, Court cases on record (developer)
Not reviewed yet: no official register looked up for this project so far.
All key facts
Location
Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, UAE
Stage
off-plan aldar.com
Handover on record
not found in the sources we read
Permit or licence number
not published
Kolaboro
Not yet reviewed by Kolaboro (added 23 Nov 2026)
Deposit protection
not yet reviewed
Page we read
aldar.com aldar.com
Last checked
23 Nov 2026
Open data record
AUH-041

Ranked #10 of 13 for transparency in Saadiyat Island · Ranked #35 of 46 for transparency in Abu Dhabi

Alert me if the date or price changes

One email when what is published about Talay at Marsa Al Saadiyat changes: handover date, prices, documents or register results. We check every day; first we send a link to confirm your address.

Free: a PDF report of Talay at Marsa Al Saadiyat with every fact and its source. The link appears here once you add your email.

We send a link to confirm first. Every email has a link to stop.

Follow changes in a feed reader: Atom JSON Feed API

In short

  • Talay at Marsa Al Saadiyat is listed as off-plan in Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, UAE, by Aldar Properties. aldar.com
  • No handover date is published in the sources we read. aldar.com
  • No permit or licence number is published in the sources we read. aldar.com

The record field by field: 0 of 10 key facts held, each with its source and date; 10 still unknown, with how to find them. · One-page brief to print

Is Talay at Marsa Al Saadiyat legit? What we could check

Transparency score 18 of 100, computed on 23 Nov 2026 from public sources. kolaboro.com

kolaboro.com

What is published and checkable about Talay at Marsa Al Saadiyat, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.

Published or confirmed: 2 of 11 items we could check.

This checklist is computed from public facts; our own review of this project is not done yet.

  • Developer identified by legal name: No legal company name in the pages we read 0 of 10
  • Developer found in an official company register: GLEIF record, LEI 98450048CD8AEF13B480 5 of 5GLEIF
  • Permit or licence number published: No permit or licence number in the pages we read 0 of 15
  • Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
  • Handover date published: No handover date in the pages we read 0 of 10
  • Handover date record: No dated handover record 0 of 10kolaboro.com
  • Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
  • Address or plot location published: No precise address or plot location published 0 of 10
  • Developer website health: answers; valid security certificate (TLS); domain registered for 60+ days more; no lookalike-domain notice 10 of 10kolaboro.com
  • Official lists screened: regulator warning lists: no match; not screened yet 2 of 2kolaboro.com
  • Price published: No price in the pages we read 0 of 5
  • page we read: aldar.com Kolaboro

How the transparency score is made

How much does Talay at Marsa Al Saadiyat cost?

Payment plan of Talay at Marsa Al Saadiyat

  • No payment plan was published on the pages we read (read on 23 Nov 2026).

Unit types, sizes and floor plans of Talay at Marsa Al Saadiyat

Total cost to buy at Talay at Marsa Al Saadiyat: taxes and fees

Purchase taxes and fees in UAE: not published in our country guide yet. Work it out with your own figures

Prices over time

We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON

Price history of Abu Dhabi: 11 projects compared

Price per m² against official data

No official comparison available for this project. The developer does not publish both a starting price and a unit size, so there is no price per m² to compare.

Compared only with official open data (registered sale prices or official appraised values). How we use data.

When will Talay at Marsa Al Saadiyat be completed?

No handover date published in the sources we read (checked 23 Nov 2026).

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover date: not published in the sources we read.
  • No dated promise found in the sources we read.

Delivery forecast

Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.

No dated handover promise in our records, so there is no forecast.

Permits and licences

No permit or licence number published in the sources we read (checked 23 Nov 2026).

  • No permit or licence number is published in the sources we read.
  • Official register for Abu Dhabi: ADREC (Abu Dhabi Real Estate Centre) (search form, checked 13 Nov 2026) adrec.gov.ae

Live check in the official registers

Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.

Where is Talay at Marsa Al Saadiyat?

Location as published: Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, on aldar.com (checked 23 Nov 2026).

aldar.com

  • Area as published: Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, UAE. aldar.com
  • Pin on the map: none, because no address or coordinates precise enough are published. aldar.com

Developer claims we tested

Reviewed on 23 Nov 2026: developer page or official register read, register looked up, handover date checked.

What the developer or listing saysWhat the records show
Aldar release of 17 Sep 2026: Talay, 351 standalone four- to six-bedroom villas, the first residential community at Marsa Al Saadiyat (masterplan of about 6.4 million sq m and 8 km of coastline) aldar.com
developer
verified developer

What changed, with dates

Last checked 23 Nov 2026.

Nothing to compare yet: changes show here once we hold a second dated copy (first copy 23 Nov 2026).

    Public reports

    What public sources report, with the link. We list reports; we do not judge the developer.

    • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

    Who is the developer of Talay at Marsa Al Saadiyat?

    Developer as published: Aldar Properties, on aldar.com (checked 23 Nov 2026).

    aldar.com

    • Talay at Marsa Al Saadiyat is developed by Aldar Properties, as published on the pages we read. Projects by Aldar Properties that we track: 27. aldar.com
    • Dated promises on record: 6; 1 kept, 0 passed without delivery, 1 moved later, 4 still ahead. promise tracker
    • Projects of Aldar Properties we track: 27 (not yet completed: 27, completed: 0). kolaboro.com
    • 3 of the 27 projects by Aldar Properties on our record are past their handover date. Projects by Aldar Properties with a delay
    • Official company register (Abu Dhabi): DARI dari.ae

    Other Aldar Properties projects in Abu Dhabi

    All facts about Aldar Properties Delivery record of Aldar Properties

    Website health

    We check the developer's own website once a day: whether the homepage answers, when its TLS certificate and its domain registration expire, and when it was last updated. A site that stops answering or lets its domain lapse is a reason to ask questions, not proof of anything.

    Website aldar.com

    • The homepage answered with HTTP 200 on 22 Nov 2026 (2.8 s). homepage
    • Answered on all of the last 5 daily checks. Daily checks since 18 Nov 2026. our daily checks
    • Answered on 5 daily checks in a row. our daily checks
    • Security certificate (TLS) expires 6 Jun 2027. certificate log
    • Domain registration expires 16 Jul 2029. domain register (RDAP)
    • Domain registered on 16 Jul 2001 (25 years before our check), registry RDAP, read 22 Nov 2026 domain register (RDAP)
    • TLS certificate issued by DigiCert Inc on 20 Nov 2026 (certificate transparency log, read 22 Nov 2026) crt.sh
    • Newest date in the site's sitemap: 18 Nov 2026. sitemap

    Last 15 daily checks, oldest first

    Checked 22 Nov 2026. Method and data: One request to the homepage per domain per day, user agent KolaboroResearchAgent, after reading robots.txt (weekly). TLS expiry from the certificate the server presents; domain expiry from the registry RDAP record (weekly); sitemap weekly. No page text is kept.

    Alternatives to Talay at Marsa Al Saadiyat

    Projects in Abu Dhabi with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 18 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works

    This project publishes no price, so we cannot list alternatives by price in Abu Dhabi.

    Compared side by side

    Market context: Abu Dhabi

    • We track 46 projects in Abu Dhabi. 37% publish a permit or licence number and 39% state deposit protection. kolaboro.com/m/abu-dhabi/
    • In Abu Dhabi, fewer than 5 projects are past their first handover date on record. Across all markets: a median of 5 months past (213 projects). How this is computed
    • Delay index for Abu Dhabi: the handover date on record moved for 2 of 19 projects with a dated promise; mean shift over all of them: 1.6 months; over those that moved: 15 months. kolaboro.com/handover

    All projects in Abu Dhabi

    Abu Dhabi, November 2026: monthly data story

    How this record compares with Abu Dhabi, field by field

    Buyer reviews

    There are no verified buyer reviews of Talay at Marsa Al Saadiyat yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

    Reviews waiting for moderation are not shown.

    Bought here? Submit a verified review

    How we moderate reports and replies

    Right of reply

    No reply from the developer on record (checked 23 Nov 2026).

    Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

    Reply as the developer Report a correction Questions to ask the developer

    Questions to ask the developer about Talay at Marsa Al Saadiyat

    1. What is the permit or licence number of Talay at Marsa Al Saadiyat, which authority issued it, and on what date?
    2. What handover date does the contract state, and what happens if it is missed?
    3. Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
    4. Can you send dated photos or the latest inspection report of the construction?
    5. What is the full price list, with the payment plan and every fee on top of the price?

    Prepare these questions as an email · All questions, with the reason for each

    Before you pay

    Before you sign: your checklist for UAE

    Tick each step as you do it. Your ticks stay in this browser only.

    Buyer journey for this project, from reservation to handover

    Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are on request: we confirm a local agent for your location before you pay.

    Free live check Pre-purchase check, €490

    What next

    Share this page: WhatsApp My projects

    Questions buyers ask

    Is Talay at Marsa Al Saadiyat legit?

    Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 23 Nov 2026). No permit or licence number is published in the sources we read. No handover date is published in the sources we read. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 2 of 11 items we could check. Transparency score: 18 of 100, rank 10 of 13 in Saadiyat Island. Check the sources on this page and ask the developer for documents before paying.

    Where is Talay at Marsa Al Saadiyat?

    Talay at Marsa Al Saadiyat is in Marsa Al Saadiyat, Saadiyat Island, Abu Dhabi, Abu Dhabi, UAE, according to the sources listed on this page. Pin on the map: none, because no address or coordinates precise enough are published.

    When will Talay at Marsa Al Saadiyat be completed?

    No handover date is published in the sources we read.

    Is Talay at Marsa Al Saadiyat delayed?

    No handover date is published in the sources we read.

    Who is the developer of Talay at Marsa Al Saadiyat?

    Aldar Properties, according to the sources listed on this page. Projects by Aldar Properties that we track: 27. Dated promises on record: 6; 1 kept, 0 passed without delivery, 1 moved later, 4 still ahead.

    Does Talay at Marsa Al Saadiyat have a permit or licence?

    No permit or licence number is published in the sources we read.

    What do buyers say about Talay at Marsa Al Saadiyat?

    There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

    How much does Talay at Marsa Al Saadiyat cost?

    No price is published in the pages we read. Ask the developer for the current price list.

    What is the payment plan of Talay at Marsa Al Saadiyat?

    No payment plan was published on the pages we read (read on 23 Nov 2026).

    What unit types and sizes does Talay at Marsa Al Saadiyat have?

    As published: 4 to 6 bedroom villas; Units: 351.

    What is the transparency score of Talay at Marsa Al Saadiyat?

    Transparency score: 18 of 100, rank 10 of 13 in Saadiyat Island. It counts what is published and checkable, not quality.

    When was Talay at Marsa Al Saadiyat last checked, and what changed?

    Last checked 23 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 23 Nov 2026). No change to the published facts is recorded.

    Sources

    Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

    1. aldar.com developer

    Archived copies of the page we read (Internet Archive)

    Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate

    Last checked 23 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

    Check this project€490 · written report usually within 7 days