Kolaboro / Turkey / Güçlenen İnşaat
Green Life
Public records and facts
Kolaboro ID: TUR-102
What is published about Green Life in İzmit, Kocaeli, Turkey, what official registers and other sources say, and what changed over time. Facts only, each with its source.
Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work
Is it safe? What we know and what we do not: Known: handover date. Not known yet: permit, company, construction, website, official lists.
Six checks at a glance
Last checked 25 Nov 20261 source
- Permitno number published
- Companyno legal name found
- Handover datedate published
- Constructionnot checked yet
- Websitenot monitored yet
- Official listsnot screened yet
Next question to ask Ask for the permit or licence number and look it up in the official register. All questions
What each colour means
- Green: published or confirmed.
- Amber: partly.
- Red: not published or the date passed.
- Grey: not checked yet.
Facts, not a verdict.
Green Life is listed as off-plan in İzmit, Kocaeli, Turkey, by Güçlenen İnşaat. The handover date on record is 31 Dec 2027. No permit number is published. Transparency score: 14 of 100. Not yet reviewed by Kolaboro (added 25 Nov 2026). There are no verified buyer reviews yet. Last checked 25 Nov 2026.
The 10 key facts, by where they come from Facts, not a verdict. Each value, its source and date are in the record. How we verify a fact
Confirmed 0 of 10
In an official register or by our satellite reading
Published, not confirmed 1 of 10
By the developer, a listing portal or another web page
- Handover date
Not found yet 9 of 10
- Permit or registration number
- Units
- Starting price
- Developer legal entity
- Escrow or deposit protection
- Construction progress
- Satellite reading (built-up share, first > last)
- Official register entry
- Court cases on record (developer)
Not reviewed yet: no official register looked up for this project so far.
- 1 source: 1 developer. Sources
- Facts last checked on 25 Nov 2026.
- What we cannot know from public sources · Who pays us, conflicts of interest
- Something wrong? Use the flag button next to any line, or write to hello@kolaboro.com.
All key facts
- Developer
- Güçlenen İnşaat konutprojeleri.com
- Location
- İzmit, Kocaeli, Turkey
- Stage
- off-plan konutprojeleri.com
- Handover on record
- 31 Dec 2027 konutprojeleri.com
- Permit or licence number
- not published
- Kolaboro
- Not yet reviewed by Kolaboro (added 25 Nov 2026)
- Deposit protection
- not yet reviewed
- Page we read
- konutprojeleri.com konutprojeleri.com
- Last checked
- 25 Nov 2026
- Open data record
- TUR-102
One email when what is published about Green Life changes: handover date, prices, documents or register results. We check every day; first we send a link to confirm your address.
Free: a PDF report of Green Life with every fact and its source. The link appears here once you add your email. Download the free PDF report
We send a link to confirm first. Every email has a link to stop.
In short
- Green Life is listed as off-plan in İzmit, Kocaeli, Turkey, by Güçlenen İnşaat. konutprojeleri.com
- The handover date on record is 31 Dec 2027. konutprojeleri.com
- No permit or licence number is published in the sources we read. konutprojeleri.com
The record field by field: 1 of 10 key facts held, each with its source and date; 9 still unknown, with how to find them.One-page brief to print
Document checklistPayment plan stress testDeveloper timelineFind a project by permit or register number
Is Green Life legit? What we could check
Transparency score 14 of 100, computed on 25 Nov 2026 from public sources. kolaboro.com
What is published and checkable about Green Life, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.
Published or confirmed: 1 of 7 items we could check.
This checklist is computed from public facts; our own review of this project is not done yet.
- Developer identified by legal name: No legal company name in the pages we read 0 of 10
- Developer found in an official company register: Not checked Not checked by us: left out of this project's total.
- Permit or licence number published: No permit or licence number in the pages we read 0 of 15
- Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
- Handover date published: Published: 31 December 2027 10 of 10
- Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
- Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
- Address or plot location published: No precise address or plot location published 0 of 10
- Developer website health: Developer website not checked by us Not checked by us: left out of this project's total.
- Official lists screened: not screened yet Not checked by us: left out of this project's total.
- Price published: No price in the pages we read 0 of 5
- page we read: konutprojeleri.com Kolaboro
How much does Green Life cost?
- Prices and payment plan as published on the pages we read (copy of 25 Nov 2026). konutprojeleri.com
- Price: not published in the pages we read.
- Handover promised: 31 Dec 2027 konutprojeleri.com
- 1 statement of the developer or listing is compared with the records in "Developer claims we tested".
Payment plan of Green Life
- No payment plan was published on the pages we read (read on 25 Nov 2026).
Unit types, sizes and floor plans of Green Life
- Units: 42 konutprojeleri.com
- Page read on 25 Nov 2026.
Total cost to buy at Green Life: taxes and fees
Purchase taxes and fees in Turkey, each with its source. Typical figures, not advice: confirm them with your notary or lawyer.
- Title deed fee (tapu harcı), often split 2 % and 2 % with the seller: 4 % adalet.gov.tr
- Notary, lawyer, agent, bank and other registration fees: not published in our guide. Ask for a written quote.
No price is published for this project, so no amount is worked out here.
Can foreigners buy at Green Life, and can it be let to tourists?
- Short lets, Türkiye: A tourism rental permit from the Ministry of Culture and Tourism is mandatory to let a home for 100 days or less (Law No. 7464, in force since 1 January 2024). Ministry of Culture and Tourism of Türkiye
Prices over time
We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON
Rent and resale near the site
Can you legally short-let here?
What the official source we read says. Rules change and cities add their own, so check the source before you count on short-let income.
| Where | Licence or registration | Caps or zones | Nights and stays | Building and owners |
|---|---|---|---|---|
| Türkiye | A tourism rental permit from the Ministry of Culture and Tourism is mandatory to let a home for 100 days or less (Law No. 7464, in force since 1 January 2024). Ministry of Culture and Tourism of Türkiye, in force since 1 Jan 2024 | In a building with more than three homes, one person can hold permits for at most 25% of them. More than five permits also requires a business opening and operating licence. Ministry of Culture and Tourism of Türkiye, in force since 1 Jan 2024 | Not stated in the official sources we read | For a home in a multi-unit building, the application needs a notarised copy of a decision taken unanimously by all unit owners. Ministry of Culture and Tourism of Türkiye, in force since 1 Jan 2024 |
Price per m² against official data
No official comparison available for this project. The developer does not publish both a starting price and a unit size, so there is no price per m² to compare.
Compared only with official open data (registered sale prices or official appraised values). How we use data.
When will Green Life be completed?
Handover on record: 31 Dec 2027, as seen on konutprojeleri.com on 25 Nov 2026.
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover date on record: 31 Dec 2027. Not moved in our records. konutprojeleri.com
- No dated promise found in the sources we read.
Delivery forecast
Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.
No dated handover promise in our records, so there is no forecast.
Where it should be by now
By today (25 Nov 2026), the developer's own schedule says:
- No promised date has come due yet.
- Next on the schedule: Handover or completion, 31 Dec 2027 (in 13 months).
Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself
Dated promises on record: 1, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.
Permits and licences
No permit or licence number published in the sources we read (checked 25 Nov 2026).
- No permit or licence number is published in the sources we read.
- Municipal building permit (yapi ruhsati): no official online register (checked 13 Nov 2026) kolaboro.com/registers
Live check in the official registers
Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.
Where is Green Life?
Location as published: İzmit, Kocaeli, Turkey, on konutprojeleri.com (checked 25 Nov 2026).
- Area as published: İzmit, Kocaeli, Turkey. konutprojeleri.com
- Pin on the map: none, because no address or coordinates precise enough are published. konutprojeleri.com
Developer claims we tested
| What the developer or listing says | What the records show |
|---|---|
| KonutProjeleri project page: status "Satışta" (on sale), delivery (Teslim) during 2027 as declared by the developer, developer "Güçlenen İnşaat", 42 independent units (bağımsız bölüm), location İzmit · Kocaeli (read 25 Nov 2026) konutprojeleri.com developer | not verified yet |
What changed, with dates
Last checked 25 Nov 2026.
Nothing to compare yet: changes show here once we hold a second dated copy (first copy 25 Nov 2026).
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
Who is the developer of Green Life?
Developer as published: Güçlenen İnşaat, on konutprojeleri.com (checked 25 Nov 2026).
- Green Life is developed by Güçlenen İnşaat, as published on the pages we read. konutprojeleri.com
- Projects of Güçlenen İnşaat we track: 1 (not yet completed: 1, completed: 0). kolaboro.com
- Official company register (Turkey): KAP (Public Disclosure Platform) kap.org.tr
Alternatives to Green Life
Projects in Turkey with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 14 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works
This project publishes no price, so we cannot list alternatives by price in Turkey.
Compared side by side
Market context: Turkey
- We track 119 projects in Turkey. 0% publish a permit or licence number and 0% state deposit protection. kolaboro.com/m/turkey/
- In Turkey, fewer than 5 projects are past their first handover date on record. Across all markets: a median of 6 months past (282 projects). How this is computed
How this record compares with Turkey, field by field
Supply at handover: 83 other projects in Turkey have a handover date in 2027. Handover pipeline by year
Compare with the closest projects
The three projects in the same market with the nearest handover date (same area first), with the facts we hold and how many an official register confirms.
| Project | Area | Handover date | Fields held | Confirmed by a register |
|---|---|---|---|---|
| Green Life | İzmit, Kocaeli | 31 Dec 2027 | 1 / 10 | 0 |
| Armory Residence | İzmit, Kocaeli | 31 Dec 2027 | 1 / 10 | 0 |
| Bulvar Yeşilova | İzmit, Kocaeli | 31 Dec 2027 | 1 / 10 | 0 |
| DEF135 Residence | İzmit, Kocaeli | 31 Dec 2027 | 1 / 10 | 0 |
Buyer reviews
There are no verified buyer reviews of Green Life yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
No reply from the developer on record (checked 25 Nov 2026).
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Questions to ask the developer about Green Life
- What is the permit or licence number of Green Life, which authority issued it, and on what date?
- What is the legal name and registration number of the company that sells the units and signs the contract?
- Is the handover date of 31 Dec 2027 written into the contract, with a penalty if it is missed?
- Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
- Can you send dated photos or the latest inspection report of the construction?
Prepare these questions as an email · All questions, with the reason for each
Before you pay
Before you sign: your checklist for Turkey
Tick each step as you do it. Your ticks stay in this browser only.
Buyer journey for this project, from reservation to handover
Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are on request: we confirm a local agent for your location before you pay.
What next
- Compare with similar projects
- Alert me if the date or price changes
- Ask the developer
- Timeline of every dated record
- Embed these facts on your site
Share this page: WhatsApp My projects
Questions buyers ask
Is Green Life legit?
Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 25 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is 31 Dec 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 1 of 7 items we could check. Transparency score: 14 of 100. Check the sources on this page and ask the developer for documents before paying.
Where is Green Life?
Green Life is in İzmit, Kocaeli, Turkey, according to the sources listed on this page. Pin on the map: none, because no address or coordinates precise enough are published.
When will Green Life be completed?
The handover date on record is 31 Dec 2027.
Is Green Life delayed?
The handover date on record is 31 Dec 2027.
Who is the developer of Green Life?
Güçlenen İnşaat, according to the sources listed on this page.
Does Green Life have a permit or licence?
No permit or licence number is published in the sources we read.
What do buyers say about Green Life?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
How much does Green Life cost?
No price is published in the pages we read. Ask the developer for the current price list.
What is the payment plan of Green Life?
No payment plan was published on the pages we read (read on 25 Nov 2026).
What unit types and sizes does Green Life have?
As published: Units: 42.
What is the transparency score of Green Life?
Transparency score: 14 of 100. It counts what is published and checkable, not quality.
When was Green Life last checked, and what changed?
Last checked 25 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 25 Nov 2026). No change to the published facts is recorded.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- konutprojeleri.com developer
Archived copies of the page we read (Internet Archive)
Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate
Last checked 25 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.