Kolaboro / Australia / Sydney / Meriton
Pagewood Centro Cezanne: reviews and facts
Kolaboro ID: SYD-010
What is published about Pagewood Centro Cezanne in Pagewood, Sydney, Sydney, Australia, what official registers and other sources say, and what changed over time. Facts only, each with its source.
Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work
Is it safe? What we know and what we do not: Known: handover date, website, official lists. Not known yet: permit, company, construction.
Six checks at a glance
- Permitno number published
- Companyno legal name found
- Handover datedate published
- Constructionnot checked yet
- Websitesome checks not passed
- Official listsno match on sanctions and warning lists
What each colour means
- Green: published or confirmed.
- Amber: partly.
- Red: not published or the date passed.
- Grey: not checked yet.
Facts, not a verdict.
Pagewood Centro Cezanne is listed as under construction in Pagewood, Sydney, Sydney, Australia, by Meriton. The handover date on record is April 2027. No permit number is published. Transparency score: 43 of 100, rank 7 of 10 in Sydney. Not yet reviewed by Kolaboro (added 17 Nov 2026). There are no verified buyer reviews yet. Last checked 17 Nov 2026.
Not reviewed yet: no official register looked up for this project so far.
- 1 sources: 1 developer. Sources
- Facts last checked on 17 Nov 2026.
- What we cannot know from public sources · Who pays us, conflicts of interest
- Something wrong? Use the flag button next to any line, or write to hello@kolaboro.com.
All key facts
- Developer
- Meriton meriton.com.au
- Location
- Pagewood, Sydney, Sydney, Australia
- Stage
- under construction meriton.com.au
- Handover on record
- April 2027 meriton.com.au
- Permit or licence number
- not published
- Kolaboro
- Not yet reviewed by Kolaboro (added 17 Nov 2026)
- Deposit protection
- not yet reviewed
- Page we read
- meriton.com.au meriton.com.au
- Last checked
- 17 Nov 2026
- Open data record
- SYD-010
Ranked #7 of 10 for transparency in Sydney
One email when what is published about Pagewood Centro Cezanne changes: handover date, prices, documents or register results. Alert emails start once our sending opens; we confirm your address now.
Free: a PDF report of Pagewood Centro Cezanne with every fact and its source. The link appears here once you add your email. Download the free PDF report
We send a link to confirm first. Every email has a link to stop.
In short
- Pagewood Centro Cezanne is listed as under construction in Pagewood, Sydney, Sydney, Australia, by Meriton. meriton.com.au
- The handover date on record is April 2027. meriton.com.au
- No permit or licence number is published in the sources we read. meriton.com.au
Is Pagewood Centro Cezanne legit? What we could check
Transparency score 43 of 100, computed on 20 Nov 2026 from public sources. kolaboro.com
What is published and checkable about Pagewood Centro Cezanne, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.
Published or confirmed: 4 of 10 items we could check.
This checklist is computed from public facts; our own review of this project is not done yet.
- Developer identified by legal name: No legal company name in the pages we read 0 of 10
- Developer found in an official company register: Not found in the global company register (GLEIF) under this exact name 0 of 5GLEIF
- Permit or licence number published: No permit or licence number in the pages we read 0 of 15
- Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
- Handover date published: Published: April 2027 10 of 10
- Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
- Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
- Address or plot location published: Precise enough for a map pin 10 of 10
- Developer website health: answers; valid security certificate (TLS); domain expiry within 60 days or unknown; no lookalike-domain notice 9 of 10kolaboro.com
- Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
- Price published: Price published 5 of 5
- page we read: meriton.com.au Kolaboro
How much does Pagewood Centro Cezanne cost?
- Prices and payment plan as published on the pages we read (copy of 17 Nov 2026). meriton.com.au
- Price from: AUD 820,000 - 1,160,000 meriton.com.au
- Handover promised: April 2027 meriton.com.au
- 5 statements of the developer or listing are compared with the records in "Developer claims we tested".
Payment plan of Pagewood Centro Cezanne
- No payment plan was published on the pages we read (read on 17 Nov 2026).
Unit types, sizes and floor plans of Pagewood Centro Cezanne
- No unit types, sizes or floor plans were published on the pages we read (read on 17 Nov 2026).
Total cost to buy at Pagewood Centro Cezanne: taxes and fees
Purchase taxes and fees in Australia: not published in our country guide yet. Work it out with your own figures
Prices over time
We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON
Price per m² against official data
No official comparison available for this project. The developer does not publish both a starting price and a unit size (no size found), so there is no price per m² to compare.
Compared only with official open data (registered sale prices or official appraised values). How we use data.
When will Pagewood Centro Cezanne be completed?
Handover on record: April 2027, as seen on meriton.com.au on 17 Nov 2026.
Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.
- Handover date on record: April 2027. Not moved in our records. meriton.com.au
- No dated promise found in the sources we read.
Delivery forecast
Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.
No dated handover promise in our records, so there is no forecast.
Where it should be by now
By today (20 Nov 2026), the developer's own schedule says:
- No promised date has come due yet.
- Next on the schedule: Handover or completion, April 2027 (in 5 months).
Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself
Dated promises on record: 1, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.
Permits and licences
No permit or licence number published in the sources we read (checked 17 Nov 2026).
- No permit or licence number is published in the sources we read.
- Official register for Sydney: State planning portals (search form, checked 13 Nov 2026) planning.nsw.gov.au
Live check in the official registers
Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.
Where is Pagewood Centro Cezanne?
Location as published: Pagewood, Sydney, Sydney, on meriton.com.au (checked 17 Nov 2026).
- Area as published: Pagewood, Sydney, Sydney, Australia. meriton.com.au
- Pin on the map: from a published address or coordinates. meriton.com.au




Map © OpenStreetMap contributors. Pin as recorded.
Developer claims we tested
| What the developer or listing says | What the records show |
|---|---|
| "Due for completion in April 2027" printed on the developer page meriton.com.au developer | not verified yet |
| 1+MPR, 2, 2+MPR, 3 and 4-bedroom residences; 1 bedroom + MPR from $820,000 to $1,040,000, 2 bedroom from $1,000,000 to $1,160,000 as printed meriton.com.au developer | not verified yet |
| The page advertises "Meriton's Tenant Guarantee" meriton.com.au developer | not verified yet |
| Map on the developer page points to -33.94196, 151.22675 meriton.com.au developer | not verified yet |
| Pin: -33.941964, 151.226755 (structured data on the developer page); coordinates as published on the source page meriton.com.au developer | not verified yet |
What changed, with dates
Last checked 17 Nov 2026.
Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026).
Public reports
What public sources report, with the link. We list reports; we do not judge the developer.
- No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.
Who is the developer of Pagewood Centro Cezanne?
Developer as published: Meriton, on meriton.com.au (checked 17 Nov 2026).
- Pagewood Centro Cezanne is developed by Meriton, as published on the pages we read. Projects by Meriton that we track: 5. meriton.com.au
- Projects of Meriton we track: 5 (not yet completed: 5, completed: 0). kolaboro.com
- None of the 5 projects by Meriton on our record is past its handover date.
- Official company register (Australia): ASIC registers asic.gov.au
- Official company register (Australia): Australian Business Register (ABN Lookup) abr.business.gov.au
Other Meriton projects in Sydney
- The Carling 263-281 Pennant Hills Road, Carlingford, New South Wales
- Zetland Square 905 South Dowling Street, Zetland, New South Wales 2017
Other projects by Meriton that we track
- ICONICA Gold Coast
- The Oscar (Brisbane) Brisbane
Website health
We check the developer's own website once a day: whether the homepage answers, when its TLS certificate and its domain registration expire, and when it was last updated. A site that stops answering or lets its domain lapse is a reason to ask questions, not proof of anything.
Website meriton.com.au
- The homepage answered with HTTP 200 on 20 Nov 2026 (1.0 s). homepage
- Answered on all of the last 7 daily checks. our daily checks
- Answered on 9 daily checks in a row. our daily checks
- Security certificate (TLS) expires 25 Jan 2027. certificate log
- TLS certificate issued by Let's Encrypt on 27 Oct 2026 (certificate transparency log, read 20 Nov 2026) crt.sh
Last 13 daily checks, oldest first
Checked 20 Nov 2026. Method and data: One request to the homepage per domain per day, user agent KolaboroResearchAgent, after reading robots.txt (weekly). TLS expiry from the certificate the server presents; domain expiry from the registry RDAP record (weekly); sitemap weekly. No page text is kept.
Alternatives to Pagewood Centro Cezanne
Projects in Sydney with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 43 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works
No project in Sydney has a similar published price and a higher transparency score.
Compared side by side
Similar projects
Closest projects with a pin: The Carling (24 km). Compare the four side by side
- Treehouse at Midtown MacPark Sydney · under construction
- Hyde Metropolitan Sydney · under construction
Market context: Sydney
- We track 10 projects in Sydney. 50% publish a permit or licence number and 10% state deposit protection. kolaboro.com/m/sydney/
- In Sydney, fewer than 5 projects are past their first handover date on record. Across all markets: a median of 8 months past (125 projects). How this is computed
- Delay index for Sydney: the handover date on record moved for 2 of 6 projects with a dated promise; mean shift over all of them: 12 months; over those that moved: 36 months. kolaboro.com/handover
Buyer reviews
There are no verified buyer reviews of Pagewood Centro Cezanne yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.
Reviews waiting for moderation are not shown.
Right of reply
No reply from the developer on record (checked 17 Nov 2026).
Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.
Reply as the developer Report a correction Questions to ask the developer
Questions to ask the developer about Pagewood Centro Cezanne
- What is the permit or licence number of Pagewood Centro Cezanne, which authority issued it, and on what date?
- What is the legal name and registration number of the company that sells the units and signs the contract?
- Is the handover date of April 2027 written into the contract, with a penalty if it is missed?
- Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
- Can you send dated photos or the latest inspection report of the construction?
Before you pay
Before you sign: your checklist for Australia
Tick each step as you do it. Your ticks stay in this browser only.
Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are being set up.
What next
- Compare with similar projects
- Alert me if the date or price changes
- Ask the developer
- Timeline of every dated record
- Embed these facts on your site
Share this page: WhatsApp My projects
Questions buyers ask
Is Pagewood Centro Cezanne legit?
Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 17 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is April 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 4 of 10 items we could check. Transparency score: 43 of 100, rank 7 of 10 in Sydney. Check the sources on this page and ask the developer for documents before paying.
Where is Pagewood Centro Cezanne?
Pagewood Centro Cezanne is in Pagewood, Sydney, Sydney, Australia, according to the sources listed on this page. Pin on the map: from a published address or coordinates.
When will Pagewood Centro Cezanne be completed?
The handover date on record is April 2027.
Is Pagewood Centro Cezanne delayed?
The handover date on record is April 2027.
Who is the developer of Pagewood Centro Cezanne?
Meriton, according to the sources listed on this page. Projects by Meriton that we track: 5.
Does Pagewood Centro Cezanne have a permit or licence?
No permit or licence number is published in the sources we read.
What do buyers say about Pagewood Centro Cezanne?
There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.
How much does Pagewood Centro Cezanne cost?
The lowest price in the sources we read is AUD 820,000 and the highest AUD 1,160,000. Prices are as published and can change; ask the developer for the current price list.
What is the payment plan of Pagewood Centro Cezanne?
No payment plan was published on the pages we read (read on 17 Nov 2026).
What unit types and sizes does Pagewood Centro Cezanne have?
No unit types, sizes or floor plans were published on the pages we read (read on 17 Nov 2026).
What is the transparency score of Pagewood Centro Cezanne?
Transparency score: 43 of 100, rank 7 of 10 in Sydney. It counts what is published and checkable, not quality.
When was Pagewood Centro Cezanne last checked, and what changed?
Last checked 17 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 17 Nov 2026). No change to the published facts is recorded.
Sources
Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.
- meriton.com.au developer
- Earlier copies of the tracked page in the Internet Archive: first 30 Oct 2025, latest 16 Sept 2026. all copies
Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate
Last checked 17 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.