Shipping daily
Changelog →

Kolaboro / Malaysia / Kuala Lumpur / Tan & Tan Developments

Aviera @ Bangsar South: reviews and facts

Kolaboro ID: KUA-031

What is published about Aviera @ Bangsar South in Bangsar South, Kuala Lumpur, Kuala Lumpur, Malaysia, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work

Is it safe? What we know and what we do not: Known: handover date, official lists. Not known yet: permit, company, construction, website.

Six checks at a glance

Last checked 21 Nov 20261 sources

Next question to ask Ask for the permit or licence number and look it up in the official register. Look the project up in KPKT TEDUH. All questions

What each colour means
  • Green: published or confirmed.
  • Amber: partly.
  • Red: not published or the date passed.
  • Grey: not checked yet.

Facts, not a verdict.

Aviera @ Bangsar South is listed as under construction in Bangsar South, Kuala Lumpur, Kuala Lumpur, Malaysia, by Tan & Tan Developments. The handover date on record is 2031. No permit number is published. Transparency score: 27 of 100, rank 112 of 115 in Kuala Lumpur. Not yet reviewed by Kolaboro (added 21 Nov 2026).

Did you buy here? Tell us

The 10 key facts, by where they come from Facts, not a verdict. Each value, its source and date are in the record. How we verify a fact

  • 0 / 10 Confirmed in an official register or by our satellite reading
  • 2 / 10 Published by the developer, a listing portal or another web page, not yet confirmed: Handover date, Starting price
  • 8 / 10 Not found yet: Permit or registration number, Units, Developer legal entity, Escrow or deposit protection, Construction progress, Satellite reading (built-up share, first > last), Official register entry, Court cases on record (developer)
Not reviewed yet: no official register looked up for this project so far.
All key facts
Location
Bangsar South, Kuala Lumpur, Kuala Lumpur, Malaysia
Stage
under construction rumavi.com
Handover on record
2031 rumavi.com
Permit or licence number
not published
Kolaboro
Not yet reviewed by Kolaboro (added 21 Nov 2026)
Deposit protection
not yet reviewed
Page we read
rumavi.com
listing page (not the developer's site) rumavi.com
Last checked
21 Nov 2026
Open data record
KUA-031

Ranked #112 of 115 for transparency in Kuala Lumpur

Alert me if the date or price changes

One email when what is published about Aviera @ Bangsar South changes: handover date, prices, documents or register results. We check every day; first we send a link to confirm your address.

Free: a PDF report of Aviera @ Bangsar South with every fact and its source. The link appears here once you add your email.

We send a link to confirm first. Every email has a link to stop.

Follow changes in a feed reader: Atom JSON Feed API

In short

  • Aviera @ Bangsar South is listed as under construction in Bangsar South, Kuala Lumpur, Kuala Lumpur, Malaysia, by Tan & Tan Developments. rumavi.com
  • The handover date on record is 2031. rumavi.com
  • No permit or licence number is published in the sources we read. rumavi.com

The record field by field: 2 of 10 key facts held, each with its source and date; 8 still unknown, with how to find them. · One-page brief to print

Is Aviera @ Bangsar South legit? What we could check

Transparency score 27 of 100, computed on 23 Nov 2026 from public sources. kolaboro.com

kolaboro.com

What is published and checkable about Aviera @ Bangsar South, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.

Published or confirmed: 3 of 8 items we could check.

This checklist is computed from public facts; our own review of this project is not done yet.

  • Developer identified by legal name: No legal company name in the pages we read 0 of 10
  • Developer found in an official company register: Not checked Not checked by us: left out of this project's total.
  • Permit or licence number published: No permit or licence number in the pages we read 0 of 15
  • Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
  • Handover date published: Published: 2031 10 of 10
  • Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
  • Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
  • Address or plot location published: No precise address or plot location published 0 of 10
  • Developer website health: Developer website not checked by us Not checked by us: left out of this project's total.
  • Official lists screened: sanctions lists: no match; regulator warning lists: no match 5 of 5kolaboro.com
  • Price published: Price published 5 of 5
  • page we read: rumavi.com Kolaboro

How the transparency score is made

How much does Aviera @ Bangsar South cost?

Payment plan of Aviera @ Bangsar South

  • No payment plan was published on the pages we read (read on 21 Nov 2026).

Unit types, sizes and floor plans of Aviera @ Bangsar South

Unit typesSizePrice fromPrice per m² (from)Median in Kuala Lumpur
2-bedroom apartment, 3-bedroom apartment74 - 120 m²MYR 469,000MYR 6,338MYR 10,950

Starting price divided by the smallest size, as published; not per unit type. Median of 33 projects in Kuala Lumpur with both figures, same currency.

Total cost to buy at Aviera @ Bangsar South: taxes and fees

Purchase taxes and fees in Malaysia: not published in our country guide yet. Work it out with your own figures

Prices over time

We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON

Price per m² against official data

  • Project, as advertised: MYR 6338 per m² (starting price MYR 469000 divided by the smallest unit size 74 m²; the cheapest unit may not be the smallest) developer page

No official comparison available for this project. We know of no official open dataset of sale prices per m² for Kuala Lumpur that we can compare with.

Compared only with official open data (registered sale prices or official appraised values). How we use data.

When will Aviera @ Bangsar South be completed?

Handover on record: 2031, as seen on rumavi.com on 21 Nov 2026.

rumavi.com

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover date on record: 2031. Not moved in our records. rumavi.com
  • No dated promise found in the sources we read.

Delivery forecast

Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.

No dated handover promise in our records, so there is no forecast.

Where it should be by now

By today (23 Nov 2026), the developer's own schedule says:

  • No promised date has come due yet.
  • Next on the schedule: Handover or completion, 2031 (in 4 years).

Add the promised dates to your calendar (.ics) Subscribe, so a moved date updates itself

Dated promises on record: 1, each with its source. A period such as a quarter is placed on its last day. These are the developer's dates, not a confirmation by Kolaboro.

Permits and licences

No permit or licence number published in the sources we read (checked 21 Nov 2026).

  • No permit or licence number is published in the sources we read.
  • Official register for Kuala Lumpur: KPKT TEDUH (opens in a browser, checked 13 Nov 2026) teduh.kpkt.gov.my

Live check in the official registers

Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.

Where is Aviera @ Bangsar South?

Location as published: Bangsar South, Kuala Lumpur, Kuala Lumpur, on rumavi.com (checked 21 Nov 2026).

rumavi.com

  • Area as published: Bangsar South, Kuala Lumpur, Kuala Lumpur, Malaysia. rumavi.com
  • Pin on the map: none, because no address or coordinates precise enough are published. rumavi.com

Developer claims we tested

What the developer or listing saysWhat the records show
Development profile lists Aviera @ Bangsar South by Tan & Tan Developments (IGB Group) in Bangsar South, Kuala Lumpur, Malaysia, status "Under Construction", expected completion "2031" (profile dated 2026-07-16, read 21 Nov 2026) rumavi.com
listing portal
not verified yet
439 units in total, 32 floors as listed on the profile rumavi.com
listing portal
not verified yet
Listed price range on the profile: MYR 469,000 to MYR 5,500,000 (asking prices as listed, read 21 Nov 2026) rumavi.com
listing portal
not verified yet
4 unit types listed on the profile: 2 Bedroom, 74 sqm, MYR 900,000; Garden / City View 2 Bedroom Deluxe, 84 sqm, MYR 1,100,000; City View 3 Bedroom, 111 sqm, MYR 1,350,000; City / KL Skyline View 3 Bedroom Premium, 120 sqm, MYR 1,500,000 rumavi.com
listing portal
not verified yet

Claim evidence · Record history API

What changed, with dates

Last checked 21 Nov 2026.

Nothing to compare yet: changes show here once we hold a second dated copy (first copy 21 Nov 2026).

    Public reports

    What public sources report, with the link. We list reports; we do not judge the developer.

    • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

    Who is the developer of Aviera @ Bangsar South?

    Developer as published: Tan & Tan Developments, on rumavi.com (checked 21 Nov 2026).

    rumavi.com

    • Aviera @ Bangsar South is developed by Tan & Tan Developments, as published on the pages we read. rumavi.com
    • Projects of Tan & Tan Developments we track: 1 (not yet completed: 1, completed: 0). kolaboro.com
    • Official company register (Malaysia): KPKT TEDUH teduh.kpkt.gov.my

    All facts about Tan & Tan Developments

    Alternatives to Aviera @ Bangsar South

    Projects in Kuala Lumpur with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 27 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works

    Compared side by side

    Market context: Kuala Lumpur

    • We track 104 projects in Kuala Lumpur. 83% publish a permit or licence number and 83% state deposit protection. kolaboro.com/m/kuala-lumpur/
    • In Kuala Lumpur, 17 tracked projects are past their first handover date on record: a median of 4 months (range 1 to 38). Historical statistic from our records, not a forecast. How this is computed

    All projects in Kuala Lumpur

    Kuala Lumpur, November 2026: monthly data story

    How this record compares with Kuala Lumpur, field by field

    Buyer reviews

    There are no verified buyer reviews of Aviera @ Bangsar South yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

    Reviews waiting for moderation are not shown.

    Bought here? Submit a verified review

    How we moderate reports and replies

    Right of reply

    No reply from the developer on record (checked 21 Nov 2026).

    Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

    Reply as the developer Report a correction Questions to ask the developer

    Questions to ask the developer about Aviera @ Bangsar South

    1. What is the permit or licence number of Aviera @ Bangsar South, which authority issued it, and on what date?
    2. What is the legal name and registration number of the company that sells the units and signs the contract?
    3. Is the handover date of 2031 written into the contract, with a penalty if it is missed?
    4. Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
    5. Can you send dated photos or the latest inspection report of the construction?

    Prepare these questions as an email · All questions, with the reason for each

    Before you pay

    Before you sign: your checklist for Malaysia

    Tick each step as you do it. Your ticks stay in this browser only.

    Buyer journey for this project, from reservation to handover

    Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are on request: we confirm a local agent for your location before you pay.

    Free live check Pre-purchase check, €490

    Buying off-plan in Malaysia: what to check

    What next

    Share this page: WhatsApp My projects

    Questions buyers ask

    Is Aviera @ Bangsar South legit?

    Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 21 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is 2031. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 3 of 8 items we could check. Transparency score: 27 of 100, rank 112 of 115 in Kuala Lumpur. Check the sources on this page and ask the developer for documents before paying.

    Where is Aviera @ Bangsar South?

    Aviera @ Bangsar South is in Bangsar South, Kuala Lumpur, Kuala Lumpur, Malaysia, according to the sources listed on this page. Pin on the map: none, because no address or coordinates precise enough are published.

    When will Aviera @ Bangsar South be completed?

    The handover date on record is 2031.

    Is Aviera @ Bangsar South delayed?

    The handover date on record is 2031.

    Who is the developer of Aviera @ Bangsar South?

    Tan & Tan Developments, according to the sources listed on this page.

    Does Aviera @ Bangsar South have a permit or licence?

    No permit or licence number is published in the sources we read.

    What do buyers say about Aviera @ Bangsar South?

    There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

    How much does Aviera @ Bangsar South cost?

    The lowest price in the sources we read is MYR 469,000 and the highest MYR 5,500,000. Prices are as published and can change; ask the developer for the current price list.

    What is the payment plan of Aviera @ Bangsar South?

    No payment plan was published on the pages we read (read on 21 Nov 2026).

    What unit types and sizes does Aviera @ Bangsar South have?

    As published: 2-bedroom apartment, 3-bedroom apartment; 74 - 120 m²; Units: 439.

    What is the transparency score of Aviera @ Bangsar South?

    Transparency score: 27 of 100, rank 112 of 115 in Kuala Lumpur. It counts what is published and checkable, not quality.

    When was Aviera @ Bangsar South last checked, and what changed?

    Last checked 21 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 21 Nov 2026). No change to the published facts is recorded.

    Sources

    Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

    1. rumavi.com listing portal

    Archived copies of the page we read (Internet Archive)

    Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate

    Last checked 21 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

    Check this project€490 · written report usually within 7 days