Shipping daily
Changelog →

Kolaboro / Australia / Kiama / Level 33

ELAN Kiama

Public records and facts

Kolaboro ID: KIA-001

What is published about ELAN Kiama in Kiama, New South Wales, Australia, what official registers and other sources say, and what changed over time. Facts only, each with its source.

Data collected, not reviewed yet. The facts below come from the sources listed and have not been through our review checklist. How we work

Is it safe? What we know and what we do not: Known: company, handover date. Not known yet: permit, construction, website, official lists.

Six checks at a glance

Last checked 25 Nov 20263 sources

Next question to ask Ask for the permit or licence number and look it up in the official register. All questions

What each colour means
  • Green: published or confirmed.
  • Amber: partly.
  • Red: not published or the date passed.
  • Grey: not checked yet.

Facts, not a verdict.

ELAN Kiama is listed as under construction in Kiama, New South Wales, Australia, by Level 33. The handover date on record is late 2027. No permit number is published. Transparency score: 43 of 100. Not yet reviewed by Kolaboro (added 25 Nov 2026). There are no verified buyer reviews yet. Last checked 25 Nov 2026.

Did you buy here? Tell us

The 10 key facts, by where they come from Facts, not a verdict. Each value, its source and date are in the record. How we verify a fact

  • Confirmed 0 of 10

    In an official register or by our satellite reading

  • Published, not confirmed 2 of 10

    By the developer, a listing portal or another web page

    • Handover date
    • Developer legal entity
  • Not found yet 8 of 10

    • Permit or registration number
    • Units
    • Starting price
    • Escrow or deposit protection
    • Construction progress
    • Satellite reading (built-up share, first > last)
    • Official register entry
    • Court cases on record (developer)

    Who can confirm each one

Not reviewed yet: no official register looked up for this project so far.
All key facts
Location
Kiama, New South Wales, Australia
Stage
under construction apartments.com.au
Handover on record
late 2027 apartments.com.au
Permit or licence number
not published
Kolaboro
Not yet reviewed by Kolaboro (added 25 Nov 2026)
Deposit protection
not yet reviewed
Page we read
apartments.com.au apartments.com.au
Last checked
25 Nov 2026
Open data record
KIA-001
Alert me if the date or price changes

One email when what is published about ELAN Kiama changes: handover date, prices, documents or register results. We check every day; first we send a link to confirm your address.

Free: a PDF report of ELAN Kiama with every fact and its source. The link appears here once you add your email.

We send a link to confirm first. Every email has a link to stop.

Follow changes in a feed reader: Atom JSON Feed API

In short

The record field by field: 2 of 10 key facts held, each with its source and date; 8 still unknown, with how to find them.One-page brief to print

Level 33: 3 projects in our record, 0 followed day by day; 0 had their handover moved later and 0 have a passed date while the register shows building unfinished. Developer timeline

Document checklistPayment plan stress testDeveloper timelineFind a project by permit or register number

Is ELAN Kiama legit? What we could check

Transparency score 43 of 100, computed on 25 Nov 2026 from public sources. kolaboro.com

kolaboro.com

What is published and checkable about ELAN Kiama, item by item, with the source of each. This is not a verdict: Kolaboro does not label projects or developers. "Not published" means we found no public source.

Published or confirmed: 3 of 7 items we could check.

This checklist is computed from public facts; our own review of this project is not done yet.

  • Developer identified by legal name: Legal name: LEVEL 33 PROPERTY GROUP PTY LTD, ABN 61 146 857 543 (ABN Lookup, NSW 2216) 10 of 10
  • Developer found in an official company register: Not checked Not checked by us: left out of this project's total.
  • Permit or licence number published: No permit or licence number in the pages we read 0 of 15
  • Permit confirmed by a register or independent source: Not confirmed in a register by us 0 of 5kolaboro.com
  • Handover date published: Published: late 2027 10 of 10
  • Handover date record: Not enough dated history yet Not checked by us: left out of this project's total.kolaboro.com
  • Deposit protection stated: No deposit protection stated in the pages we read 0 of 15
  • Address or plot location published: Precise enough for a map pin 10 of 10
  • Developer website health: Developer website not checked by us Not checked by us: left out of this project's total.
  • Official lists screened: not screened yet Not checked by us: left out of this project's total.
  • Price published: No price in the pages we read 0 of 5
  • page we read: apartments.com.au Kolaboro

How the transparency score is made

How much does ELAN Kiama cost?

Payment plan of ELAN Kiama

  • No payment plan was published on the pages we read (read on 25 Nov 2026).

Unit types, sizes and floor plans of ELAN Kiama

Total cost to buy at ELAN Kiama: taxes and fees

Purchase taxes and fees in Australia: not published in our country guide yet. Work it out with your own figures

Can foreigners buy at ELAN Kiama, and can it be let to tourists?

  • Ownership as published: From 1 Apr 2025 foreign persons are temporarily banned from buying established dwellings unless an exception applies; the FIRB notice names established dwellings only, so new off-the-plan dwellings are outside the ban (FIRB) apartments.com.au

Prices over time

We hold no dated copy of this page yet, so we cannot show its prices over time. Data as JSON

Price per m² against official data

No official comparison available for this project. The developer does not publish both a starting price and a unit size, so there is no price per m² to compare.

Compared only with official open data (registered sale prices or official appraised values). How we use data.

When will ELAN Kiama be completed?

Handover on record: late 2027, as seen on apartments.com.au on 25 Nov 2026.

apartments.com.au

Every dated promise we found, how it changed and whether the date has passed. Status rules: promise tracker.

  • Handover date on record: late 2027. Not moved in our records. apartments.com.au
  • No dated promise found in the sources we read.

Delivery forecast

Estimate from the dated handover history of comparable projects (Kaplan-Meier), not a finding about this one.

No dated handover promise in our records, so there is no forecast.

Permits and licences

No permit or licence number published in the sources we read (checked 25 Nov 2026).

  • No permit or licence number is published in the sources we read.

Live check in the official registers

Asks the official registers of this country now. Each answer is kept with a digital fingerprint (SHA-256), so it can be checked later.

Where is ELAN Kiama?

Location as published: Kiama, New South Wales, on apartments.com.au (checked 25 Nov 2026).

apartments.com.au

Map © OpenStreetMap contributors. Pin as recorded.

Developer claims we tested

What the developer or listing saysWhat the records show
apartments.com.au project page for ELAN Kiama (19-21 Bourrool Street, Kiama NSW 2533), last updated 2026-09-22: status "Under construction"; estimated completion "Late 2027"; 20 residences; developer Level 33; builder Level 33; 3 floors; types 3BR; local government area The Council of the Municipality of Kiama; sales status selling now (portal figures, read 25 Nov 2026) apartments.com.au
developer
not verified yet
Foreign Investment Review Board notice (17 Feb 2025): from 1 April 2025 foreign persons, including temporary residents and foreign-owned companies, are temporarily banned from buying established dwellings in Australia unless an exception applies; the notice names established dwellings only (read 25 Nov 2026) foreigninvestment.gov.au
official register
not verified yet
ABN Lookup search for "Level 33" lists ABN 61 146 857 543 LEVEL 33 PROPERTY GROUP PTY LTD (Entity Name, Active, main business location NSW 2216); this matches the developer name on the listing, the selling entity for this project is not named on the pages we read (register search read 25 Nov 2026) abr.business.gov.au
official register
not verified yet

Claim evidence · Record history API

What changed, with dates

Last checked 25 Nov 2026.

Nothing to compare yet: changes show here once we hold a second dated copy (first copy 25 Nov 2026).

    Public reports

    What public sources report, with the link. We list reports; we do not judge the developer.

    • No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read.

    Who is the developer of ELAN Kiama?

    Developer as published: Level 33, on apartments.com.au (checked 25 Nov 2026).

    apartments.com.au

    • ELAN Kiama is developed by Level 33, as published on the pages we read. Projects by Level 33 that we track: 3. apartments.com.au
    • Head office: NSW 2216, main business location of ABN 61 146 857 543 LEVEL 33 PROPERTY GROUP PTY LTD (ABN Lookup) apartments.com.au
    • Legal entity: LEVEL 33 PROPERTY GROUP PTY LTD, ABN 61 146 857 543 (ABN Lookup, NSW 2216) apartments.com.au
    • Projects of Level 33 we track: 3 (not yet completed: 3, completed: 0). kolaboro.com
    • None of the 3 projects by Level 33 on our record is past its handover date.
    • Official company register (Australia): ASIC registers asic.gov.au
    • Official company register (Australia): Australian Business Register (ABN Lookup) abr.business.gov.au

    Other projects by Level 33 that we track

    All facts about Level 33 Delivery record of Level 33

    Alternatives to ELAN Kiama

    Projects in Kiama with a published price within 30 % of this one (same currency) and a higher transparency score (this project: 43 of 100). The score counts what is published and checkable, not a recommendation. How the transparency score works

    This project publishes no price, so we cannot list alternatives by price in Kiama.

    Market context: Kiama

    • We track one project in Kiama. kolaboro.com/m/kiama/
    • In Kiama, fewer than 5 projects are past their first handover date on record. Across all markets: a median of 6 months past (282 projects). How this is computed

    All projects in Kiama

    Buyer reviews

    There are no verified buyer reviews of ELAN Kiama yet. We publish a review only from a buyer who proves the purchase (fingerprint of the contract or receipt, signed with a passkey) and only after a moderator has read it.

    Reviews waiting for moderation are not shown.

    Bought here? Submit a verified review

    How we moderate reports and replies

    Right of reply

    No reply from the developer on record (checked 25 Nov 2026).

    Are you the developer? Send documents and we add your reply to this page. Found a wrong fact? Tell us and we correct it with a dated note.

    Reply as the developer Report a correction Questions to ask the developer

    Questions to ask the developer about ELAN Kiama

    1. What is the permit or licence number of ELAN Kiama, which authority issued it, and on what date?
    2. What is the legal name and registration number of the company that sells the units and signs the contract?
    3. Is the handover date of late 2027 written into the contract, with a penalty if it is missed?
    4. Where does my deposit go: an escrow account or a bank guarantee in the project's name? Which bank?
    5. Can you send dated photos or the latest inspection report of the construction?

    Prepare these questions as an email · All questions, with the reason for each

    Before you pay

    Before you sign: your checklist for Australia

    Tick each step as you do it. Your ticks stay in this browser only.

    Buyer journey for this project, from reservation to handover

    Paste the project link for a free live check of what official registers say. For a full desk review, order the pre-purchase check; site visits by a local agent are on request: we confirm a local agent for your location before you pay.

    Free live check Pre-purchase check, €490

    Buying off-plan in Australia: what to check

    What next

    Share this page: WhatsApp My projects

    Questions buyers ask

    Is ELAN Kiama legit?

    Kolaboro does not label projects or developers. What the public record shows: Not yet reviewed by Kolaboro (added 25 Nov 2026). No permit or licence number is published in the sources we read. The handover date on record is late 2027. No reports of disputes, regulator action, stoppages or financial difficulty found in the sources we read. Published or confirmed: 3 of 7 items we could check. Transparency score: 43 of 100. Check the sources on this page and ask the developer for documents before paying.

    Where is ELAN Kiama?

    ELAN Kiama is in Kiama, New South Wales, Australia, according to the sources listed on this page. Pin on the map: from a published address or coordinates.

    When will ELAN Kiama be completed?

    The handover date on record is late 2027.

    Is ELAN Kiama delayed?

    The handover date on record is late 2027.

    Who is the developer of ELAN Kiama?

    Level 33, according to the sources listed on this page. Projects by Level 33 that we track: 3.

    Does ELAN Kiama have a permit or licence?

    No permit or licence number is published in the sources we read.

    What do buyers say about ELAN Kiama?

    There are no verified buyer reviews yet. Buyers who prove their purchase can submit one; it is published after moderation.

    How much does ELAN Kiama cost?

    No price is published in the pages we read. Ask the developer for the current price list.

    What is the payment plan of ELAN Kiama?

    No payment plan was published on the pages we read (read on 25 Nov 2026).

    What unit types and sizes does ELAN Kiama have?

    As published: 3BR; Units: 20.

    Is Level 33 a registered company?

    Legal entity: LEVEL 33 PROPERTY GROUP PTY LTD, ABN 61 146 857 543 (ABN Lookup, NSW 2216). Source: our research record of ELAN Kiama.

    What is the transparency score of ELAN Kiama?

    Transparency score: 43 of 100. It counts what is published and checkable, not quality.

    When was ELAN Kiama last checked, and what changed?

    Last checked 25 Nov 2026. Nothing to compare yet: changes show here once we hold a second dated copy (first copy 25 Nov 2026). No change to the published facts is recorded.

    Sources

    Every fact on this page links to its source. Pages we read are fingerprinted and kept by date.

    1. apartments.com.au developer
    2. foreigninvestment.gov.au official register
    3. abr.business.gov.au official register

    Archived copies of the page we read (Internet Archive)

    Download this record: JSON · CSV · Markdown (CC BY 4.0) · Verification certificate

    Last checked 25 Nov 2026. How we collect data: data policy. Facts quoted from sources are shown in the language of the source.

    Check this project€490 · written report usually within 7 days