Shipping daily
Changelog →

Kolaboro / Projects / Waldorf Astoria Hotel & Residences Miami

What changed on the developer's page: Waldorf Astoria Hotel & Residences Miami

The text of the page we track for this project, as our agents read it on each date, compared side by side. Removed or changed words are struck through on the left, new words are marked on the right. Every version links to its sealed copy, whose SHA-256 fingerprint you can check yourself.

Between 5 Nov 2026 and 5 Nov 2026: 1 sentence changed, 0 added, 0 removed (of 219 in the newer version).

Page tracked: https://joshsteinrealtor.com/new-construction/waldorf-astoria-miami/. Version 3 and version 4 of 6.

Before: 5 Nov 2026 · SHA-256 2dcc2197e946…
After: 5 Nov 2026 · SHA-256 70d0f30e0fc4…
4 unchanged sentences
BothWaldorf Astoria Miami: 100 Storeys, Q2 2028 Completion Miami Real Estate The MIAMI Confidential Case files · 5 November 2026 Latest File · Brickell & Brickell Key Following a building in these files?
BothWaldorf Astoria Miami: 100 Storeys, Q2 2028 Completion Miami Real Estate The MIAMI Confidential Case files · 5 November 2026 Latest File · Brickell & Brickell Key Following a building in these files?
BothTell Josh which one.
BothTell Josh which one.
BothHe’ll send its recorded sales from the Miami-Dade record, what is on the market there now … Open the files → Josh Stein Condos New Construction New Development Tracker All Luxury Condos All Buildings A–Z Miami Condo Index The Miami Resale Record The 100 Most Expensive Sales $1M to $3M $3M to $5M $5M to $10M $10M and Above Penthouses Art Deco Lofts Condo Hotels Homes Miami Homes Miami Luxury Homes …
BothHe’ll send its recorded sales from the Miami-Dade record, what is on the market there now … Open the files → Josh Stein Condos New Construction New Development Tracker All Luxury Condos All Buildings A–Z Miami Condo Index The Miami Resale Record The 100 Most Expensive Sales $1M to $3M $3M to $5M $5M to $10M $10M and Above Penthouses Art Deco Lofts Condo Hotels Homes Miami Homes Miami Luxury Homes …
BothBy Josh Stein · Florida license SL3057661 · Updated 12 October 2026 Leer en español → AI search · ask in plain words Search listings > Search 3-bed condo under $2M Condo with a pool in Miami 2-bed for rent Overview For sale 2 For rent 0 Pending 0 Sold 0 Stats 2 condos for sale at Waldorf Astoria Miami, average list price $2,633.10 per sq ft (total list price ÷ total sq ft).
BothBy Josh Stein · Florida license SL3057661 · Updated 12 October 2026 Leer en español → AI search · ask in plain words Search listings > Search 3-bed condo under $2M Condo with a pool in Miami 2-bed for rent Overview For sale 2 For rent 0 Pending 0 Sold 0 Stats 2 condos for sale at Waldorf Astoria Miami, average list price $2,633.10 per sq ft (total list price ÷ total sq ft).
BothAsking range $3,388,700 to $10,701,000 List price per sq ft $2,633.10 Sold, 12 months 0 Listings in Waldorf Astoria Miami 1 listings See all in Waldorf Astoria Miami → ft² m² Photo courtesy of Beaches MLS For sale Photo 1 of 10 $4,651,000 3 bd 3.5 ba #8004 · Listed 157 days ago 300 Biscayne Boulevard #8004, Miami, FL Listing courtesy of PMG Residential LLC Listing information is deemed reliable bu …
BothAsking range $3,388,700 to $10,701,000 List price per sq ft $2,633.10 Sold, 12 months 0 Listings in Waldorf Astoria Miami 1 listings See all in Waldorf Astoria Miami → ft² m² Photo courtesy of Beaches MLS For sale Photo 1 of 10 $4,651,000 3 bd 3.5 ba #8004 · Listed 157 days ago 300 Biscayne Boulevard #8004, Miami, FL Listing courtesy of PMG Residential LLC Listing information is deemed reliable bu …
BothData is supplied by the MLS and may be subject to change or withdrawal without notice.
BothData is supplied by the MLS and may be subject to change or withdrawal without notice.
Before, 5 Nov 2026Last updated November 5, 2026, 7:28 am Planted by IDX Bloom Key facts about Waldorf Astoria Miami Address 300 … Sauna, Spa Hot Tub, Trash Neighborhood Miami Last updated November 5, 2026, 3:35 am Residences at Waldorf Astoria Miami Bedrooms For sale Size (sq ft) …
After, 5 Nov 2026Last updated November 5, 2026, 3:09 pm Planted by IDX Bloom Key facts about Waldorf Astoria Miami Address 300 … Sauna, Spa Hot Tub, Trash Neighborhood Miami Last updated November 5, 2026, 9:35 am Residences at Waldorf Astoria Miami Bedrooms For sale Size (sq ft) …
BothNo password.
BothNo password.
BothReferral code Website Name Email Phone (optional) Message Please send me alerts for Waldorf Astoria Miami.
BothReferral code Website Name Email Phone (optional) Message Please send me alerts for Waldorf Astoria Miami.
210 unchanged sentences
BothI agree that Josh Stein Realtor may contact me by phone or email about homes.
BothI agree that Josh Stein Realtor may contact me by phone or email about homes.
BothThis is not required to buy.
BothThis is not required to buy.
BothI can opt out at any time.
BothI can opt out at any time.
BothAlert me Sent.
BothAlert me Sent.
BothA real human (or a very fast AI) will reply shortly.
BothA real human (or a very fast AI) will reply shortly.
BothTalk to a human Want to know more?
BothTalk to a human Want to know more?
BothDrop your details and we will get right back to you.
BothDrop your details and we will get right back to you.
BothReferral code Website Name Email Phone (optional) Message I'd like more info about homes in Miami.
BothReferral code Website Name Email Phone (optional) Message I'd like more info about homes in Miami.
BothI agree that Josh Stein Realtor may contact me by phone or email about homes.
BothI agree that Josh Stein Realtor may contact me by phone or email about homes.
BothThis is not required to buy.
BothThis is not required to buy.
BothI can opt out at any time.
BothI can opt out at any time.
BothRequest info Sent.
BothRequest info Sent.
BothA real human (or a very fast AI) will reply shortly.
BothA real human (or a very fast AI) will reply shortly.
BothWaldorf Astoria Miami is a 100-story tower under construction at 300 Biscayne Boulevard with 360 or 387 private residences (the developer has published both) and 205 hotel keys.
BothWaldorf Astoria Miami is a 100-story tower under construction at 300 Biscayne Boulevard with 360 or 387 private residences (the developer has published both) and 205 hotel keys.
BothThe developer’s 14 June 2024 financing release says completion in Q2 2028, and Hilton (7 July 2026) says the hotel is slated to open in 2028.
BothThe developer’s 14 June 2024 financing release says completion in Q2 2028, and Hilton (7 July 2026) says the hotel is slated to open in 2028.
BothThe superstructure was at level 85 per a post dated 23 August 2026 (Florida YIMBY, 27 August 2026).
BothThe superstructure was at level 85 per a post dated 23 August 2026 (Florida YIMBY, 27 August 2026).
Both✓ Verified 24 September 2026 Florida YIMBY, Florida Trend, Miami New Times +12 more 15 sources Sources 1 / 7 Waldorf Astoria Residences Miami — closeup of the tower's crown against the sky, artist conceptual rendering 2 / 7 Waldorf Astoria Residences Miami — penthouse family room with downtown Miami skyline view, developer rendering 3 / 7 Waldorf Astoria Residences Miami — penthouse master bedroom …
Both✓ Verified 24 September 2026 Florida YIMBY, Florida Trend, Miami New Times +12 more 15 sources Sources 1 / 7 Waldorf Astoria Residences Miami — closeup of the tower's crown against the sky, artist conceptual rendering 2 / 7 Waldorf Astoria Residences Miami — penthouse family room with downtown Miami skyline view, developer rendering 3 / 7 Waldorf Astoria Residences Miami — penthouse master bedroom …
BothNeighborhood Downtown Miami Completion anticipated Q2 2028 (Florida YIMBY, 27 August 2026) Floors 100 Residences 387 (developer’s June 2024 financing release; Florida YIMBY); 360 (developer’s website) Status Under construction — superstructure at level 85 of 100 (Florida YIMBY, 27 August 2026) Developers Property Markets Group and Greybrook Realty Partners (with Mohari Hospitality, S2 Development, …
BothNeighborhood Downtown Miami Completion anticipated Q2 2028 (Florida YIMBY, 27 August 2026) Floors 100 Residences 387 (developer’s June 2024 financing release; Florida YIMBY); 360 (developer’s website) Status Under construction — superstructure at level 85 of 100 (Florida YIMBY, 27 August 2026) Developers Property Markets Group and Greybrook Realty Partners (with Mohari Hospitality, S2 Development, …
BothFlorida YIMBY (25 February and 27 August 2026) reports 387 private condominium residences and 205 guest rooms; Florida Trend (7 August 2026) says 360 condos ; Newsweek (7 May 2026) prints 387 residences in its summary and 360 residences of one to four bedrooms in the text.
BothFlorida YIMBY (25 February and 27 August 2026) reports 387 private condominium residences and 205 guest rooms; Florida Trend (7 August 2026) says 360 condos ; Newsweek (7 May 2026) prints 387 residences in its summary and 360 residences of one to four bedrooms in the text.
BothI have not found a source that says why the counts differ.
BothI have not found a source that says why the counts differ.
BothNine offset glass cubes — Florida YIMBY (23 June 2024 and 27 August 2026) and Florida Trend (7 August 2026) count nine; Florida YIMBY’s 25 February 2026 update referred to ten.
BothNine offset glass cubes — Florida YIMBY (23 June 2024 and 27 August 2026) and Florida Trend (7 August 2026) count nine; Florida YIMBY’s 25 February 2026 update referred to ten.
BothCompletion: 2028 from the developer and Hilton, 2027 only in a few places — the developer’s 14 June 2024 financing release says “Q2 2028”, Hilton (7 July 2026) says the hotel is slated to open in 2028, and a PMG managing partner told Newsweek (7 May 2026) the tower will be finished in 2028; Florida YIMBY (27 August 2026) says the second quarter of 2028.
BothCompletion: 2028 from the developer and Hilton, 2027 only in a few places — the developer’s 14 June 2024 financing release says “Q2 2028”, Hilton (7 July 2026) says the hotel is slated to open in 2028, and a PMG managing partner told Newsweek (7 May 2026) the tower will be finished in 2028; Florida YIMBY (27 August 2026) says the second quarter of 2028.
BothThe 2027 figures are a phrase in Florida Trend (7 August 2026, “next year”) and PMG’s own corporate portfolio page, which Miami New Times (12 August 2026) reports lists 2027 while PMG’s statement to that paper gave no completion date.
BothThe 2027 figures are a phrase in Florida Trend (7 August 2026, “next year”) and PMG’s own corporate portfolio page, which Miami New Times (12 August 2026) reports lists 2027 while PMG’s statement to that paper gave no completion date.
BothEarly marketing pointed to around summer 2025.
BothEarly marketing pointed to around summer 2025.
BothUnder construction, superstructure at level 85 of 100 — per a post dated 23 August 2026 that Florida YIMBY reported on 27 August 2026, along with a site banner advertising that the tower will top off this winter.
BothUnder construction, superstructure at level 85 of 100 — per a post dated 23 August 2026 that Florida YIMBY reported on 27 August 2026, along with a site banner advertising that the tower will top off this winter.
Both$668,000,000 construction loan — from Bank OZK and Related Fund Management in June 2024, reported by Florida YIMBY as the largest ever for a residential condominium development in Florida.
Both$668,000,000 construction loan — from Bank OZK and Related Fund Management in June 2024, reported by Florida YIMBY as the largest ever for a residential condominium development in Florida.
Both$3.5 million to $50 million, and “well over 90% sold” — the price range is from Florida Trend (7 August 2026); the sales claim is PMG’s own statement to Miami New Times (12 August 2026).
Both$3.5 million to $50 million, and “well over 90% sold” — the price range is from Florida Trend (7 August 2026); the sales claim is PMG’s own statement to Miami New Times (12 August 2026).
BothI have not found an independent count.
BothI have not found an independent count.
BothFour Block 83 folios are classified vacant land — VACANT LAND – COMMERCIAL, assessed at $25,655,100 for 2026 (Miami-Dade Property Appraiser, pulled 24 September 2026).
BothFour Block 83 folios are classified vacant land — VACANT LAND – COMMERCIAL, assessed at $25,655,100 for 2026 (Miami-Dade Property Appraiser, pulled 24 September 2026).
BothThe roll also shows a recorded condominium named X MIAMI CONDO on neighbouring lots; I have not found a source that says how it relates to the tower.
BothThe roll also shows a recorded condominium named X MIAMI CONDO on neighbouring lots; I have not found a source that says how it relates to the tower.
BothBought pre-construction at Waldorf Astoria Miami?
BothBought pre-construction at Waldorf Astoria Miami?
Both— before closing, a sale is usually an assignment of your purchase contract, and whether that is allowed depends on its assignment clause; after closing it is an ordinary resale.
Both— before closing, a sale is usually an assignment of your purchase contract, and whether that is allowed depends on its assignment clause; after closing it is an ordinary resale.
BothAsk Josh what your unit could sell for at delivery on WhatsApp.
BothAsk Josh what your unit could sell for at delivery on WhatsApp.
BothWaldorf Astoria Miami, by the numbers 100 Stories 360–387 Residences (sources differ) Q2 2028 Completion anticipated Under Construction Status Developers: Property Markets Group and Greybrook Realty Partners · Architects: Sieger Suarez Architects with Carlos Ott · Residences: 387 per Florida YIMBY, 360 per the developer’s website (read 24 September 2026) · Prices: $3.5 million to $50 million (Flor …
BothWaldorf Astoria Miami, by the numbers 100 Stories 360–387 Residences (sources differ) Q2 2028 Completion anticipated Under Construction Status Developers: Property Markets Group and Greybrook Realty Partners · Architects: Sieger Suarez Architects with Carlos Ott · Residences: 387 per Florida YIMBY, 360 per the developer’s website (read 24 September 2026) · Prices: $3.5 million to $50 million (Flor …
BothOn this page Have a question about Waldorf Astoria Miami?
BothOn this page Have a question about Waldorf Astoria Miami?
BothThis page is built from the county record, the developer’s own website and the trade press, not a listing feed.
BothThis page is built from the county record, the developer’s own website and the trade press, not a listing feed.
BothIf you want what has actually closed here, or an honest read on whether it suits you, ask me directly.
BothIf you want what has actually closed here, or an honest read on whether it suits you, ask me directly.
BothCall ([phone] Email about Waldorf Astoria Miami What is actually being built at 300 Biscayne Where construction stands Which completion date should a buyer believe?
BothCall ([phone] Email about Waldorf Astoria Miami What is actually being built at 300 Biscayne Where construction stands Which completion date should a buyer believe?
BothWhat does the county say about the ground under it?
BothWhat does the county say about the ground under it?
BothWhat I would verify before signing 300 Biscayne Blvd, Miami, Florida 33132 | Neighborhood: Downtown Miami This page sets out what dated sources say about the Waldorf Astoria Hotel & Residences Miami, including the places where they disagree: the residence count (360 or 387), the completion date (2027 or 2028) and what the county roll shows for the site.
BothWhat I would verify before signing 300 Biscayne Blvd, Miami, Florida 33132 | Neighborhood: Downtown Miami This page sets out what dated sources say about the Waldorf Astoria Hotel & Residences Miami, including the places where they disagree: the residence count (360 or 387), the completion date (2027 or 2028) and what the county roll shows for the site.
BothEach figure carries its source and date, and I re-read them on 24 September 2026.
BothEach figure carries its source and date, and I re-read them on 24 September 2026.
BothWhere I could not close a question I say so rather than pick the tidier answer.
BothWhere I could not close a question I say so rather than pick the tidier answer.
BothWhat is actually being built at 300 Biscayne The Waldorf Astoria Hotel & Residences Miami is a 100-story, 1,049-foot tower at 300 Biscayne Boulevard in Downtown Miami (Florida YIMBY, 27 August 2026).
BothWhat is actually being built at 300 Biscayne The Waldorf Astoria Hotel & Residences Miami is a 100-story, 1,049-foot tower at 300 Biscayne Boulevard in Downtown Miami (Florida YIMBY, 27 August 2026).
BothFlorida YIMBY calls it Florida’s first supertall and, in June 2024, described it as the tallest residential building south of New York City; the developer’s website says it will be the tallest hotel and residential tower south of Manhattan.
BothFlorida YIMBY calls it Florida’s first supertall and, in June 2024, described it as the tallest residential building south of New York City; the developer’s website says it will be the tallest hotel and residential tower south of Manhattan.
BothThe programme is 387 private condominium residences and 205 hotel guestrooms and suites according to Florida YIMBY (23 June 2024, 25 February 2026 and 27 August 2026).
BothThe programme is 387 private condominium residences and 205 hotel guestrooms and suites according to Florida YIMBY (23 June 2024, 25 February 2026 and 27 August 2026).
BothThe developer’s own website says 360 branded luxury residences (read 24 September 2026), and Florida Trend (7 August 2026) also reports 360 condos alongside 205 hotel rooms and suites.
BothThe developer’s own website says 360 branded luxury residences (read 24 September 2026), and Florida Trend (7 August 2026) also reports 360 condos alongside 205 hotel rooms and suites.
BothI have not found a source that says why the counts differ or which is current, so confirm the count in the offering documents you are given.
BothI have not found a source that says why the counts differ or which is current, so confirm the count in the offering documents you are given.
BothThe design is nine offset glass cubes .
BothThe design is nine offset glass cubes .
BothFlorida YIMBY (23 June 2024 and 27 August 2026) and Florida Trend (7 August 2026) each count nine, and Florida Trend says the first three cubes are the hotel and the top six are the condominium.
BothFlorida YIMBY (23 June 2024 and 27 August 2026) and Florida Trend (7 August 2026) each count nine, and Florida Trend says the first three cubes are the hotel and the top six are the condominium.
BothFlorida YIMBY’s 25 February 2026 update instead referred to “the sixth of the tower’s ten stacked cubic volumes” ; its 27 August 2026 update, the latest I found, describes eight of nine cubes as structurally legible.
BothFlorida YIMBY’s 25 February 2026 update instead referred to “the sixth of the tower’s ten stacked cubic volumes” ; its 27 August 2026 update, the latest I found, describes eight of nine cubes as structurally legible.
BothI have not found a source that explains the difference.
BothI have not found a source that explains the difference.
BothBy the credits reported, the tower is designed by Sieger Suarez Architects in collaboration with Carlos Ott , with interiors by BAMO ; the developers are Property Markets Group and Greybrook Realty Partners , with Mohari Hospitality, S2 Development and Hilton ; and the general contractor is John Moriarty & Associates (Florida YIMBY, 27 August 2026).
BothBy the credits reported, the tower is designed by Sieger Suarez Architects in collaboration with Carlos Ott , with interiors by BAMO ; the developers are Property Markets Group and Greybrook Realty Partners , with Mohari Hospitality, S2 Development and Hilton ; and the general contractor is John Moriarty & Associates (Florida YIMBY, 27 August 2026).
BothThe developer’s website disclaimer (read 24 September 2026) says the Residences are not owned, developed or sold by Hilton, and that the Waldorf Astoria name is used under a limited, non-exclusive licence from Hilton that may be terminated or may expire without renewal.
BothThe developer’s website disclaimer (read 24 September 2026) says the Residences are not owned, developed or sold by Hilton, and that the Waldorf Astoria name is used under a limited, non-exclusive licence from Hilton that may be terminated or may expire without renewal.
BothThe tower is on Biscayne Boulevard.
BothThe tower is on Biscayne Boulevard.
BothFlorida Trend (7 August 2026) describes the site as a parcel opposite Bayfront Park with an unobstructed view of Biscayne Bay and Miami Beach.
BothFlorida Trend (7 August 2026) describes the site as a parcel opposite Bayfront Park with an unobstructed view of Biscayne Bay and Miami Beach.
BothDowntown Miami.
BothDowntown Miami.
BothThe Waldorf Astoria site sits on Biscayne Boulevard opposite Bayfront Park.
BothThe Waldorf Astoria site sits on Biscayne Boulevard opposite Bayfront Park.
BothWhere construction stands The concrete superstructure passed the 50th floor in December 2025 (Miami New Times, 12 August 2026) and the 60th floor by 25 February 2026 , when Florida YIMBY reported crews averaging approximately one floor every ten days.
BothWhere construction stands The concrete superstructure passed the 50th floor in December 2025 (Miami New Times, 12 August 2026) and the 60th floor by 25 February 2026 , when Florida YIMBY reported crews averaging approximately one floor every ten days.
BothFlorida Trend, in a feature published 7 August 2026, described the highest floor built in May 2026 as the 72nd and said a new story was poured about once a week.
BothFlorida Trend, in a feature published 7 August 2026, described the highest floor built in May 2026 as the 72nd and said a new story was poured about once a week.
BothIn its statement to Miami New Times (12 August 2026), PMG said the tower was “now surpassing 870 feet” .
BothIn its statement to Miami New Times (12 August 2026), PMG said the tower was “now surpassing 870 feet” .
BothLatest report: level 85 of 100.
BothLatest report: level 85 of 100.
BothOn 27 August 2026 Florida YIMBY reported that the superstructure had reached level 85, citing a post dated 23 August 2026, with concrete work begun on the ninth and final cube and curtain wall installation progressed through the seventh cube.
BothOn 27 August 2026 Florida YIMBY reported that the superstructure had reached level 85, citing a post dated 23 August 2026, with concrete work begun on the ninth and final cube and curtain wall installation progressed through the seventh cube.
BothIt also reports a new site banner advertising that the tower will top off “this winter”, and about 25 additional levels in roughly six months since its February report.
BothIt also reports a new site banner advertising that the tower will top off “this winter”, and about 25 additional levels in roughly six months since its February report.
BothCapform is delivering the concrete scope under general contractor John Moriarty & Associates.
BothCapform is delivering the concrete scope under general contractor John Moriarty & Associates.
BothIn June 2024 the development secured a $668,000,000 construction loan from Bank OZK and Related Fund Management , which Florida YIMBY (23 June 2024) reported as the largest ever for a residential condominium development in Florida.
BothIn June 2024 the development secured a $668,000,000 construction loan from Bank OZK and Related Fund Management , which Florida YIMBY (23 June 2024) reported as the largest ever for a residential condominium development in Florida.
BothPMG told Miami New Times (12 August 2026) that the project is “well over 90% sold” , with remaining inventory limited to Sky Collection residences.
BothPMG told Miami New Times (12 August 2026) that the project is “well over 90% sold” , with remaining inventory limited to Sky Collection residences.
BothPMG’s managing partner told Florida Trend (feature of 7 August 2026) that, as of May 2026, sales were “just shy of a billion” dollars with 26 units remaining, and that buyers on average put down a 40% deposit; Florida Trend reports condo prices from $3.5 million to $50 million.
BothPMG’s managing partner told Florida Trend (feature of 7 August 2026) that, as of May 2026, sales were “just shy of a billion” dollars with 26 units remaining, and that buyers on average put down a 40% deposit; Florida Trend reports condo prices from $3.5 million to $50 million.
BothThese are developer statements: a sell-through figure describes contracts signed and deposits taken, not closings, and I have not found an independent count.
BothThese are developer statements: a sell-through figure describes contracts signed and deposits taken, not closings, and I have not found an independent count.
BothWhich completion date should a buyer believe?
BothWhich completion date should a buyer believe?
BothSources disagree on when the building will be finished.
BothSources disagree on when the building will be finished.
BothMiami New Times (12 August 2026) traced the completion date through the project’s public statements; I have added the Florida YIMBY, Hilton and Florida Trend statements I read myself.
BothMiami New Times (12 August 2026) traced the completion date through the project’s public statements; I have added the Florida YIMBY, Hilton and Florida Trend statements I read myself.
BothStated by When Completion given as Early brokerage marketing (per Miami New Times) 2021 Around summer 2025 Greybrook (per Miami New Times) January [phone] Financing announcement (Florida YIMBY, 23 June 2024) June 2024 Q2 2028 Florida YIMBY 25 February [phone] Hilton press release 7 July [phone] Florida Trend feature 7 August 2026 “Next year” (2027) PMG portfolio page (per Miami New Times) reported …
BothStated by When Completion given as Early brokerage marketing (per Miami New Times) 2021 Around summer 2025 Greybrook (per Miami New Times) January [phone] Financing announcement (Florida YIMBY, 23 June 2024) June 2024 Q2 2028 Florida YIMBY 25 February [phone] Hilton press release 7 July [phone] Florida Trend feature 7 August 2026 “Next year” (2027) PMG portfolio page (per Miami New Times) reported …
BothMost of the sources I read give 2028 (Q2 2028 in Florida YIMBY’s latest report); two point to 2027.
BothMost of the sources I read give 2028 (Q2 2028 in Florida YIMBY’s latest report); two point to 2027.
BothMiami New Times also reported that PMG’s portfolio page lists the building as 93 floors rather than 100.
BothMiami New Times also reported that PMG’s portfolio page lists the building as 93 floors rather than 100.
BothPMG’s response to Miami New Times was that “construction continues to progress as scheduled” , with the tower surpassing 870 feet and the project well over 90% sold.
BothPMG’s response to Miami New Times was that “construction continues to progress as scheduled” , with the tower surpassing 870 feet and the project well over 90% sold.
BothMiami New Times reported that the statement did not explain the shifting completion dates or why PMG’s portfolio page continues to list 2027.
BothMiami New Times reported that the statement did not explain the shifting completion dates or why PMG’s portfolio page continues to list 2027.
BothI am setting out both so a buyer can weigh them.
BothI am setting out both so a buyer can weigh them.
BothWhat I can and cannot source.
BothWhat I can and cannot source.
BothI can source the loan, the progress figures above and PMG’s sell-through statements.
BothI can source the loan, the progress figures above and PMG’s sell-through statements.
BothI have not found a source that says why the completion date moved.
BothI have not found a source that says why the completion date moved.
BothUnder Florida’s condominium act (section 718.504, 2026 Florida Statutes, read 24 September 2026) the offering circular must state the estimated latest date of completion or point to the purchase-agreement clause that does, so the date in your own contract is the one to read , along with the outside date, what happens if it passes and what notice the developer owes you.
BothUnder Florida’s condominium act (section 718.504, 2026 Florida Statutes, read 24 September 2026) the offering circular must state the estimated latest date of completion or point to the purchase-agreement clause that does, so the date in your own contract is the one to read , along with the outside date, what happens if it passes and what notice the developer owes you.
BothI track delivery slippage across the market on the Miami pre-construction delivery tracker .
BothI track delivery slippage across the market on the Miami pre-construction delivery tracker .
BothWhat does the county say about the ground under it?
BothWhat does the county say about the ground under it?
BothThe tower site is on Block 83 of MIAMI NORTH, plat book B-41.
BothThe tower site is on Block 83 of MIAMI NORTH, plat book B-41.
BothAs of 24 September 2026 the Miami-Dade County Property Appraiser records four folios there as follows.
BothAs of 24 September 2026 the Miami-Dade County Property Appraiser records four folios there as follows.
BothAll four are recorded to PMG Downtown Developers LP, and folio [phone] carries the county site address 300 BISCAYNE BLVD.
BothAll four are recorded to PMG Downtown Developers LP, and folio [phone] carries the county site address 300 BISCAYNE BLVD.
BothAll four also carry a deed dated 7 November 2014 at $80,000,000, which matches the $80 million that Florida Trend (7 August 2026) and Miami New Times (12 August 2026) report PMG paying for the site that year.
BothAll four also carry a deed dated 7 November 2014 at $80,000,000, which matches the $80 million that Florida Trend (7 August 2026) and Miami New Times (12 August 2026) report PMG paying for the site that year.
BothFolio Lot County classification 2026 assessed [phone] VACANT LAND – COMMERCIAL $4,248,[phone] VACANT LAND – COMMERCIAL $4,248,[phone] & 21 VACANT LAND – COMMERCIAL $10,603,[phone] VACANT LAND – COMMERCIAL $6,554,400 Total $25,655,100 All four are classified VACANT LAND – COMMERCIAL, with a combined 2026 assessed value of $25,655,100.
BothFolio Lot County classification 2026 assessed [phone] VACANT LAND – COMMERCIAL $4,248,[phone] VACANT LAND – COMMERCIAL $4,248,[phone] & 21 VACANT LAND – COMMERCIAL $10,603,[phone] VACANT LAND – COMMERCIAL $6,554,400 Total $25,655,100 All four are classified VACANT LAND – COMMERCIAL, with a combined 2026 assessed value of $25,655,100.
BothI have not found a source that says when the appraiser will reclassify them.
BothI have not found a source that says when the appraiser will reclassify them.
BothPart of the assemblage sits under a recorded condominium.
BothPart of the assemblage sits under a recorded condominium.
BothA fifth Block 83 parcel — lot 16, folio [phone], classified PARKING LOT — assesses at $0 .
BothA fifth Block 83 parcel — lot 16, folio [phone], classified PARKING LOT — assesses at $0 .
BothIts legal description carries an NAU (Now Assessed Under) pointer to folio [phone] (lots 5 through 7 and 14 through 16, also $0), which points in turn to reference folio [phone].
BothIts legal description carries an NAU (Now Assessed Under) pointer to folio [phone] (lots 5 through 7 and 14 through 16, also $0), which points in turn to reference folio [phone].
BothThe county labels that folio X MIAMI CONDO and describes it as lots 5 through 7 and 14 through 16 of Block 83 as described in a declaration recorded at Official Records book 31146, page 1639.
BothThe county labels that folio X MIAMI CONDO and describes it as lots 5 through 7 and 14 through 16 of Block 83 as described in a declaration recorded at Official Records book 31146, page 1639.
BothUnder it the county lists two units, at the site addresses 230 NE 4 ST and 243 NE 3 ST: a residential unit (99.16% of the common elements) assessed at $101,970,000 for 2026, and a retail unit (0.84%) assessed at $2,160,859.
BothUnder it the county lists two units, at the site addresses 230 NE 4 ST and 243 NE 3 ST: a residential unit (99.16% of the common elements) assessed at $101,970,000 for 2026, and a retail unit (0.84%) assessed at $2,160,859.
BothThe roll does not say how X MIAMI CONDO relates to the Waldorf Astoria tower and I have not found a source that does.
BothThe roll does not say how X MIAMI CONDO relates to the Waldorf Astoria tower and I have not found a source that does.
BothA $0 on the roll is a pointer, not a valuation.
BothA $0 on the roll is a pointer, not a valuation.
BothWhat that means in practice: the county shows a single residential unit under that condominium, not 360 or 387 individual residences, so I could not look up an individual residence by folio, and any tax figure you are shown for one is a projection rather than an assessment.
BothWhat that means in practice: the county shows a single residential unit under that condominium, not 360 or 387 individual residences, so I could not look up an individual residence by folio, and any tax figure you are shown for one is a projection rather than an assessment.
BothThe assemblage’s recorded sale history (county record, 24 September 2026): a 1 April 2004 deed at $16,500,000 and a 5 May 2005 deed at $31,750,000 , both flagged qualified and both recorded as deeds including more than one parcel, appear on all five Block 83 folios I pulled; a 1 November 1982 deed at $2,500,000 , also qualified and multi-parcel, appears on the lot 16 folio and on folio [phone].
BothThe assemblage’s recorded sale history (county record, 24 September 2026): a 1 April 2004 deed at $16,500,000 and a 5 May 2005 deed at $31,750,000 , both flagged qualified and both recorded as deeds including more than one parcel, appear on all five Block 83 folios I pulled; a 1 November 1982 deed at $2,500,000 , also qualified and multi-parcel, appears on the lot 16 folio and on folio [phone].
BothThen, on 7 November 2014 , a deed at $80,000,000 .
BothThen, on 7 November 2014 , a deed at $80,000,000 .
BothThat 2014 deed carries the county classification “Trustees in bankruptcy, executors or guardians” and is flagged unqualified .
BothThat 2014 deed carries the county classification “Trustees in bankruptcy, executors or guardians” and is flagged unqualified .
BothIt is a single county classification code covering several situations — a bankruptcy trustee, an executor of an estate, a guardian — and it does not say which one applied.
BothIt is a single county classification code covering several situations — a bankruptcy trustee, an executor of an estate, a guardian — and it does not say which one applied.
BothMiami New Times (12 August 2026) reports that PMG acquired the site for $80 million in 2014 through a court-ordered sale following years of receivership litigation, rather than a bankruptcy sale.
BothMiami New Times (12 August 2026) reports that PMG acquired the site for $80 million in 2014 through a court-ordered sale following years of receivership litigation, rather than a bankruptcy sale.
BothWhat the county record itself establishes is the code, the date and the amount.
BothWhat the county record itself establishes is the code, the date and the amount.
BothWhat I would verify before signing Pre-construction diligence at this level is short, specific and mostly about documents rather than renderings.
BothWhat I would verify before signing Pre-construction diligence at this level is short, specific and mostly about documents rather than renderings.
BothThe delivery date in your own contract.
BothThe delivery date in your own contract.
BothNot the marketing date, not the date on any page including this one.
BothNot the marketing date, not the date on any page including this one.
BothFind the outside date, what happens if it passes, and what notice the developer owes you.
BothFind the outside date, what happens if it passes, and what notice the developer owes you.
BothGiven the range of dates in the table above, this is the single highest-value thing to read.
BothGiven the range of dates in the table above, this is the single highest-value thing to read.
BothThe deposit schedule and where the money sits.
BothThe deposit schedule and where the money sits.
BothPMG’s managing partner told Florida Trend (7 August 2026) that buyers on average put down a 40% deposit.
BothPMG’s managing partner told Florida Trend (7 August 2026) that buyers on average put down a 40% deposit.
BothConfirm your own schedule, and confirm in the contract and offering circular how much of your deposit is held in escrow and how much the developer may use for construction.
BothConfirm your own schedule, and confirm in the contract and offering circular how much of your deposit is held in escrow and how much the developer may use for construction.
BothWhat “well over 90% sold” is measuring.
BothWhat “well over 90% sold” is measuring.
BothAsk whether that is reservations, executed contracts or closings, and ask for it in writing.
BothAsk whether that is reservations, executed contracts or closings, and ask for it in writing.
BothIt is a reasonable question and the answer tells you something either way.
BothIt is a reasonable question and the answer tells you something either way.
BothThe hotel-residential relationship.
BothThe hotel-residential relationship.
BothThis is a Waldorf Astoria hotel and a condominium sharing one tower, and the documents that split shared costs between them are worth reading before you buy rather than after.
BothThis is a Waldorf Astoria hotel and a condominium sharing one tower, and the documents that split shared costs between them are worth reading before you buy rather than after.
BothThe Real Deal (5 August 2026) describes disputes between unit owners and commercial-space owners at a number of South Florida condo-hotels.
BothThe Real Deal (5 August 2026) describes disputes between unit owners and commercial-space owners at a number of South Florida condo-hotels.
BothRead the declaration’s allocation of common expenses and any shared-facilities agreement, and ask specifically how hotel-side costs can reach residential owners.
BothRead the declaration’s allocation of common expenses and any shared-facilities agreement, and ask specifically how hotel-side costs can reach residential owners.
BothA note on the developer, stated as record rather than as a view.
BothA note on the developer, stated as record rather than as a view.
BothThe Real Deal reported on 5 August 2026 that affiliates of PMG and the condominium association at a different PMG building — the Elser Hotel & Residences at 398 NE 5th Street, a 49-story, 646-unit condo-hotel that PMG completed in 2022 — had sued each other in July and August 2026: the association on 6 July (assessments and the governing documents) and 24 July (breach of contract), and PMG affilia …
BothThe Real Deal reported on 5 August 2026 that affiliates of PMG and the condominium association at a different PMG building — the Elser Hotel & Residences at 398 NE 5th Street, a 49-story, 646-unit condo-hotel that PMG completed in 2022 — had sued each other in July and August 2026: the association on 6 July (assessments and the governing documents) and 24 July (breach of contract), and PMG affilia …
BothThe association alleges that a PMG affiliate breached a November 2025 settlement over parking-garage revenue and operator approval; the PMG affiliate alleges, among other things, that the association is withholding roughly $773,000 in hotel management fees and billing quarterly assessments at the 2025 rate.
BothThe association alleges that a PMG affiliate breached a November 2025 settlement over parking-garage revenue and operator approval; the PMG affiliate alleges, among other things, that the association is withholding roughly $773,000 in hotel management fees and billing quarterly assessments at the 2025 rate.
BothThe association’s board president told The Real Deal that the $773,000 figure reflects collected receivables and that the PMG affiliate owes the association money, and a statement on behalf of the PMG affiliate said it strongly disputes the association’s claims about the parking operator.
BothThe association’s board president told The Real Deal that the $773,000 figure reflects collected receivables and that the PMG affiliate owes the association money, and a statement on behalf of the PMG affiliate said it strongly disputes the association’s claims about the parking operator.
BothThese are allegations in complaints, not findings.
BothThese are allegations in complaints, not findings.
BothThe article does not involve the Waldorf Astoria project ; I include it because it is on the public record, concerns the same developer and concerns the hotel-versus-association cost structure a buyer here should be reading about.
BothThe article does not involve the Waldorf Astoria project ; I include it because it is on the public record, concerns the same developer and concerns the hotel-versus-association cost structure a buyer here should be reading about.
BothWho this building suits.
BothWho this building suits.
BothA buyer who wants a branded, serviced residence in a landmark tower, who is comfortable with a 2028 horizon, and who is buying to hold.
BothA buyer who wants a branded, serviced residence in a landmark tower, who is comfortable with a 2028 horizon, and who is buying to hold.
BothWho it suits badly: anyone whose plan needs the keys before 2028, anyone underwriting a resale before completion, and anyone who has not read the shared-facilities documents.
BothWho it suits badly: anyone whose plan needs the keys before 2028, anyone underwriting a resale before completion, and anyone who has not read the shared-facilities documents.
BothAnd if you are already holding a contract here and considering an assignment, every buyer can see the same completion-date history you can, so I would price the file against that rather than against the original 2025 marketing.
BothAnd if you are already holding a contract here and considering an assignment, every buyer can see the same completion-date history you can, so I would price the file against that rather than against the original 2025 marketing.
BothIn the research: The W South Beach Closes 20 August.
BothIn the research: The W South Beach Closes 20 August.
BothWhat That Means for the 173 People Who Own Units There Already bought at Waldorf Astoria Miami?
BothWhat That Means for the 173 People Who Own Units There Already bought at Waldorf Astoria Miami?
BothIf you signed a pre-construction contract here, this part of the page is for you: what you can do with your contract, and how to get the record as it changes.
BothIf you signed a pre-construction contract here, this part of the page is for you: what you can do with your contract, and how to get the record as it changes.
BothYour three options Close and keep it.
BothYour three options Close and keep it.
BothLive in it, or rent it out within the condominium’s rental rules.
BothLive in it, or rent it out within the condominium’s rental rules.
BothAssign your contract before closing.
BothAssign your contract before closing.
BothA new buyer takes over your contract.
BothA new buyer takes over your contract.
BothWhether that is allowed, and at what fee, depends on your contract’s assignment clause and usually on the developer’s written consent.
BothWhether that is allowed, and at what fee, depends on your contract’s assignment clause and usually on the developer’s written consent.
BothClose, then resell.
BothClose, then resell.
BothAfter closing it is an ordinary resale, priced against what similar homes have actually recorded.
BothAfter closing it is an ordinary resale, priced against what similar homes have actually recorded.
BothWhat I will send you Tell me your unit.
BothWhat I will send you Tell me your unit.
BothI will send you the project’s status from the public filings as it changes, the first recorded sales here when they land, and a straight read on whether to hold, assign or sell.
BothI will send you the project’s status from the public filings as it changes, the first recorded sales here when they land, and a straight read on whether to hold, assign or sell.
BothTwo free things for buyers here A price call Fifteen minutes on the phone: what your contract looks like today against the recorded sales nearby.
BothTwo free things for buyers here A price call Fifteen minutes on the phone: what your contract looks like today against the recorded sales nearby.
BothAsk on WhatsApp → Your net sheet What you would walk away with if you assigned your contract or closed and resold: fees, closing costs and deposits, on one page.
BothAsk on WhatsApp → Your net sheet What you would walk away with if you assigned your contract or closed and resold: fees, closing costs and deposits, on one page.
BothAsk on WhatsApp → WhatsApp Josh as an owner Or send a message Prefer email?
BothAsk on WhatsApp → WhatsApp Josh as an owner Or send a message Prefer email?
Both[e-mail] Josh Stein, Florida real estate sales associate, license SL3057661.
Both[e-mail] Josh Stein, Florida real estate sales associate, license SL3057661.
BothWaldorf Astoria Miami — Frequently Asked Questions I bought pre-construction at Waldorf Astoria Miami.
BothWaldorf Astoria Miami — Frequently Asked Questions I bought pre-construction at Waldorf Astoria Miami.
BothCan I sell before or at delivery?
BothCan I sell before or at delivery?
BothIt depends on your purchase agreement.
BothIt depends on your purchase agreement.
BothBefore closing, selling usually means assigning your contract to a new buyer, which developers often allow only with their written consent and sometimes for a fee, so read the assignment clause first.
BothBefore closing, selling usually means assigning your contract to a new buyer, which developers often allow only with their written consent and sometimes for a fee, so read the assignment clause first.
BothAfter closing it is an ordinary resale, priced against what similar homes in the building and nearby have actually closed for.
BothAfter closing it is an ordinary resale, priced against what similar homes in the building and nearby have actually closed for.
BothIf you bought at Waldorf Astoria Miami and want to know what your unit could sell for at delivery, message Josh Stein on WhatsApp at ([phone].
BothIf you bought at Waldorf Astoria Miami and want to know what your unit could sell for at delivery, message Josh Stein on WhatsApp at ([phone].
BothWhen will Waldorf Astoria Miami be completed?
BothWhen will Waldorf Astoria Miami be completed?
BothFlorida YIMBY’s latest report (27 August 2026) says the second quarter of 2028, and Hilton’s 7 July 2026 release says the downtown Waldorf Astoria is slated to open in 2028.
BothFlorida YIMBY’s latest report (27 August 2026) says the second quarter of 2028, and Hilton’s 7 July 2026 release says the downtown Waldorf Astoria is slated to open in 2028.
BothTwo sources I read point to 2027: Florida Trend’s 7 August 2026 feature wrote “next year”, and, per Miami New Times (12 August 2026), PMG’s own portfolio page lists 2027.
BothTwo sources I read point to 2027: Florida Trend’s 7 August 2026 feature wrote “next year”, and, per Miami New Times (12 August 2026), PMG’s own portfolio page lists 2027.
BothEarly marketing said around summer 2025.
BothEarly marketing said around summer 2025.
BothThe date that governs your purchase is the one in your contract.
BothThe date that governs your purchase is the one in your contract.
BothHow many residences does Waldorf Astoria Miami have?
BothHow many residences does Waldorf Astoria Miami have?
BothThe sources disagree.
BothThe sources disagree.
BothFlorida YIMBY (June 2024, 25 February and 27 August 2026) reports 387 private condominium residences plus 205 hotel guest rooms; the developer’s website (read 24 September 2026) and Florida Trend (7 August 2026) say 360 residences.
BothFlorida YIMBY (June 2024, 25 February and 27 August 2026) reports 387 private condominium residences plus 205 hotel guest rooms; the developer’s website (read 24 September 2026) and Florida Trend (7 August 2026) say 360 residences.
BothI have not found a source that explains the difference, so confirm the count in the offering documents you are given.
BothI have not found a source that explains the difference, so confirm the count in the offering documents you are given.
BothHow tall is the Waldorf Astoria Miami tower?
BothHow tall is the Waldorf Astoria Miami tower?
Both100 stories and 1,049 feet, per Florida YIMBY (27 August 2026), which calls it Florida’s first supertall.
Both100 stories and 1,049 feet, per Florida YIMBY (27 August 2026), which calls it Florida’s first supertall.
BothThat article reports the superstructure at level 85, citing a post dated 23 August 2026, and a site banner advertising topping off this winter; the superstructure had passed the 60th floor by 25 February 2026.
BothThat article reports the superstructure at level 85, citing a post dated 23 August 2026, and a site banner advertising topping off this winter; the superstructure had passed the 60th floor by 25 February 2026.
BothHow many cubes make up the tower?
BothHow many cubes make up the tower?
BothNine.
BothNine.
BothFlorida YIMBY (23 June 2024 and 27 August 2026) and Florida Trend (7 August 2026) count nine offset glass cubes.
BothFlorida YIMBY (23 June 2024 and 27 August 2026) and Florida Trend (7 August 2026) count nine offset glass cubes.
BothFlorida YIMBY’s 25 February 2026 update referred to “the sixth of the tower’s ten stacked cubic volumes”, and I have not found a source that explains the difference; its 27 August 2026 update, the latest I found, counts nine.
BothFlorida YIMBY’s 25 February 2026 update referred to “the sixth of the tower’s ten stacked cubic volumes”, and I have not found a source that explains the difference; its 27 August 2026 update, the latest I found, counts nine.
BothWhat do the residences cost, and how much is left?
BothWhat do the residences cost, and how much is left?
BothFlorida Trend (7 August 2026) reports condos ranging from $3.5 million to $50 million.
BothFlorida Trend (7 August 2026) reports condos ranging from $3.5 million to $50 million.
BothPMG told Miami New Times (12 August 2026) that the project is “well over 90% sold”, with remaining inventory limited to Sky Collection residences.
BothPMG told Miami New Times (12 August 2026) that the project is “well over 90% sold”, with remaining inventory limited to Sky Collection residences.
BothThose are developer statements, and the developer’s website says prices are subject to change without notice, so confirm current availability and pricing directly.
BothThose are developer statements, and the developer’s website says prices are subject to change without notice, so confirm current availability and pricing directly.
BothWhat does the county roll show for the site?
BothWhat does the county roll show for the site?
BothAs pulled on 24 September 2026, four Block 83 folios recorded to PMG Downtown Developers LP are classified VACANT LAND – COMMERCIAL, with a combined 2026 assessed value of $25,655,100.
BothAs pulled on 24 September 2026, four Block 83 folios recorded to PMG Downtown Developers LP are classified VACANT LAND – COMMERCIAL, with a combined 2026 assessed value of $25,655,100.
BothNeighbouring lots 5 through 7 and 14 through 16 sit under a recorded condominium the county labels X MIAMI CONDO (declaration at Official Records book 31146, page 1639), with a residential unit assessed at $101,970,000 and a retail unit at $2,160,859 for 2026.
BothNeighbouring lots 5 through 7 and 14 through 16 sit under a recorded condominium the county labels X MIAMI CONDO (declaration at Official Records book 31146, page 1639), with a residential unit assessed at $101,970,000 and a retail unit at $2,160,859 for 2026.
BothI have not found a source that says how that condominium relates to the tower.
BothI have not found a source that says how that condominium relates to the tower.
BothWhat was the $80,000,000 sale in 2014?
BothWhat was the $80,000,000 sale in 2014?
BothA deed recorded 7 November 2014 across the assemblage at $80,000,000, flagged unqualified and carrying the county classification “Trustees in bankruptcy, executors or guardians”, a single code covering several situations.
BothA deed recorded 7 November 2014 across the assemblage at $80,000,000, flagged unqualified and carrying the county classification “Trustees in bankruptcy, executors or guardians”, a single code covering several situations.
BothFlorida Trend (7 August 2026) and Miami New Times (12 August 2026) both report PMG paying $80 million for the site in 2014; Miami New Times says it was a court-ordered sale following years of receivership litigation rather than a bankruptcy sale.
BothFlorida Trend (7 August 2026) and Miami New Times (12 August 2026) both report PMG paying $80 million for the site in 2014; Miami New Times says it was a court-ordered sale following years of receivership litigation rather than a bankruptcy sale.
BothSources and further reading Florida YIMBY, 27 August 2026 (ninth and final cube begins; level 85; nine cubes; 387 residences and 205 guest rooms; completion second quarter of 2028) floridayimby.com Florida YIMBY, 25 February 2026 (60th floor; sixth of ten stacked cubes, a count later reports change to nine; 387 residences and 205 guest rooms; completion anticipated 2028) floridayimby.com Florida Y …
BothSources and further reading Florida YIMBY, 27 August 2026 (ninth and final cube begins; level 85; nine cubes; 387 residences and 205 guest rooms; completion second quarter of 2028) floridayimby.com Florida YIMBY, 25 February 2026 (60th floor; sixth of ten stacked cubes, a count later reports change to nine; 387 residences and 205 guest rooms; completion anticipated 2028) floridayimby.com Florida Y …
BothThe developer’s disclaimers say that improvements and amenities depicted may not exist and that plans and specifications are subject to change without notice.
BothThe developer’s disclaimers say that improvements and amenities depicted may not exist and that plans and specifications are subject to change without notice.
Bothhttps://youtu.be/EaZEYERynbs Waldorf Astoria Miami Hotel & Condo Residences Prices $3.5 million to $50 million for the condos — Florida Trend, 7 August 2026 (that feature reports 360 condos and 205 hotel rooms and suites).
Bothhttps://youtu.be/EaZEYERynbs Waldorf Astoria Miami Hotel & Condo Residences Prices $3.5 million to $50 million for the condos — Florida Trend, 7 August 2026 (that feature reports 360 condos and 205 hotel rooms and suites).
BothPMG told Miami New Times on 12 August 2026 that the project is well over 90% sold and that remaining inventory is limited to Sky Collection residences priced by residence type, size and elevation.
BothPMG told Miami New Times on 12 August 2026 that the project is well over 90% sold and that remaining inventory is limited to Sky Collection residences priced by residence type, size and elevation.
BothPMG’s managing partner told Florida Trend that 26 units remained as of May 2026 and that buyers on average put down a 40% deposit.
BothPMG’s managing partner told Florida Trend that 26 units remained as of May 2026 and that buyers on average put down a 40% deposit.
BothThe developer’s website says prices, plans and specifications are subject to change without notice.
BothThe developer’s website says prices, plans and specifications are subject to change without notice.
BothI have not found a current published price list by unit type or a published deposit schedule.
BothI have not found a current published price list by unit type or a published deposit schedule.
BothAsk me for what is still available and for the deposit terms in the current contract form.
BothAsk me for what is still available and for the deposit terms in the current contract form.
Both‹ Previous building Vita at Grove Isle All South Florida New Construction Next building › Waldorf Astoria Residences Pompano Beach Thinking about Waldorf Astoria Miami?
Both‹ Previous building Vita at Grove Isle All South Florida New Construction Next building › Waldorf Astoria Residences Pompano Beach Thinking about Waldorf Astoria Miami?
BothI have sold South Florida property since 2002.
BothI have sold South Florida property since 2002.
BothAsk me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.
BothAsk me for the recorded declaration, what has genuinely closed, or a straight answer on whether this building fits what you are after.
BothCall ([phone] Send me a question Josh Stein · Florida real estate sales associate, license SL3057661 · ([phone] · [e-mail] Ask me about Waldorf Astoria Miami 300 Biscayne Blvd.
BothCall ([phone] Send me a question Josh Stein · Florida real estate sales associate, license SL3057661 · ([phone] · [e-mail] Ask me about Waldorf Astoria Miami 300 Biscayne Blvd.
BothWhatsApp Contact Copyright © 2026 Josh Stein Realtor · Josh Stein, Licensed Real Estate Sales Associate, FL SL3057661 Direct line Ask Josh a question Tell me the building, the budget and the timeline.
BothWhatsApp Contact Copyright © 2026 Josh Stein Realtor · Josh Stein, Licensed Real Estate Sales Associate, FL SL3057661 Direct line Ask Josh a question Tell me the building, the budget and the timeline.
BothYou will get an honest read, including when the answer is that you should not buy it.
BothYou will get an honest read, including when the answer is that you should not buy it.
Both[phone] · [e-mail] Phone or WhatsApp · English / Español · Licensed in Florida since 2002 By sending this, you agree that Josh Stein, and a licensed Florida agent he refers you to, may contact you by phone, text, WhatsApp or email about your request, including by automated means.
Both[phone] · [e-mail] Phone or WhatsApp · English / Español · Licensed in Florida since 2002 By sending this, you agree that Josh Stein, and a licensed Florida agent he refers you to, may contact you by phone, text, WhatsApp or email about your request, including by automated means.
BothAgreeing isn't a condition of buying or selling anything.
BothAgreeing isn't a condition of buying or selling anything.
BothMessage and data rates may apply.
BothMessage and data rates may apply.
BothReply STOP to stop texts.
BothReply STOP to stop texts.
BothPrivacy Policy and Terms .
BothPrivacy Policy and Terms .
BothThe Miami Confidential The reporting, every two weeks.
BothThe Miami Confidential The reporting, every two weeks.
BothEvery new case file.
BothEvery new case file.
BothEvery delivery date that moves.
BothEvery delivery date that moves.
BothEvery figure dated and sourced.
BothEvery figure dated and sourced.
BothNo listings, no hype, no press releases dressed up as news.
BothNo listings, no hype, no press releases dressed up as news.
BothWebsite Email address Subscribe Free.
BothWebsite Email address Subscribe Free.
BothBuilt from Miami-Dade County records.
BothBuilt from Miami-Dade County records.
BothSubscribing means you agree to get it by email.
BothSubscribing means you agree to get it by email.
BothUnsubscribe in one click.
BothUnsubscribe in one click.
BothJosh Stein Miami luxury real estate since 2002.
BothJosh Stein Miami luxury real estate since 2002.
BothPre-construction, waterfront homes and luxury condos across Miami-Dade, Broward and Palm Beach.
BothPre-construction, waterfront homes and luxury condos across Miami-Dade, Broward and Palm Beach.
BothExplore Luxury Condos Waterfront Homes Penthouses Lofts Art Deco New Construction Neighborhoods Key Biscayne Fisher Island Bal Harbour Sunny Isles Beach Brickell All Neighborhoods Contact [phone] [e-mail] Meet Josh Sell Your Property Contact © Copyright 2026 Ciao Bella Marketing, LLC.
BothExplore Luxury Condos Waterfront Homes Penthouses Lofts Art Deco New Construction Neighborhoods Key Biscayne Fisher Island Bal Harbour Sunny Isles Beach Brickell All Neighborhoods Contact [phone] [e-mail] Meet Josh Sell Your Property Contact © Copyright 2026 Ciao Bella Marketing, LLC.
BothAll rights reserved.
BothAll rights reserved.
BothJosh Stein, Sales Associate · Florida Real Estate License SL3057661 · LoKation® Real Estate (The K Company Realty, LLC) · 1500 E Atlantic Blvd, Suite B, Pompano Beach, FL 33060 Privacy Policy · Terms · Accessibility · Equal Housing Opportunity Designed by Ciao Bella Marketing · Powered by IDX Bloom A–Z Buildings Scroll to Top
BothJosh Stein, Sales Associate · Florida Real Estate License SL3057661 · LoKation® Real Estate (The K Company Realty, LLC) · 1500 E Atlantic Blvd, Suite B, Pompano Beach, FL 33060 Privacy Policy · Terms · Accessibility · Equal Housing Opportunity Designed by Ciao Bella Marketing · Powered by IDX Bloom A–Z Buildings Scroll to Top

All versions we keep

A new version is recorded when the page text read by our agents has a different SHA-256 from the last read. Dates are the day the version was first read, not the day the developer changed it.

Check a sealed copy yourself

Download a copy and compute its fingerprint. For example, on a Mac or Linux terminal:

curl -s https://kolaboro.com/projects/waldorf-astoria-residences-miami-pmg/changes/70d0f30e0fc4fe52d1a3fdba0dda6a64850ef2a293a8c083db181000bdab7893.txt | sha256sum

The result must equal the SHA-256 in its address. The copy is the exact text our agent extracted from the page (not the page's HTML or images). In this viewer, e-mail addresses and phone numbers are masked; the copies are unchanged.

Back to Waldorf Astoria Hotel & Residences Miami Reply as the developer Report a correction

Data file updated 2026-11-20. Developer text is quoted as published, without comment.

Protect my purchase