BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Wellington Ocean Walk: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/welling
 ton-ocean-walk/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-805-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250930
DTEND;VALUE=DATE:20251001
SUMMARY:Wellington Ocean Walk: Construction start\, promised for September 
 2025
DESCRIPTION:Date published by the developer: September 2025.\nSource: https
 ://dubairealestateiq.com/project/wellington-ocean-walk (read on 23 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/wellington-oce
 an-walk/#delivery\nThis is the developer's date\, not a confirmation by Ko
 laboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/wellington-ocean-walk/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-805-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20281231
DTEND;VALUE=DATE:20290101
SUMMARY:Wellington Ocean Walk: Handover or completion\, promised for Decemb
 er 2028
DESCRIPTION:Date published by the developer: December 2028.\nSource: https:
 //dubairealestateiq.com/project/wellington-ocean-walk (read on 23 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/wellington-ocea
 n-walk/#delivery\nThis is the developer's date\, not a confirmation by Kol
 aboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/wellington-ocean-walk/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
