BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Wellington Grand Villas: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/welling
 ton-grand-villas/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-954-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:Wellington Grand Villas: Construction start\, promised for March 20
 25
DESCRIPTION:Date published by the developer: March 2025.\nSource: https://d
 ubairealestateiq.com/project/wellington-grand-villas (read on 23 Nov 2026)
 .\nRecord with all sources: https://kolaboro.com/projects/wellington-grand
 -villas/#delivery\nThis is the developer's date\, not a confirmation by Ko
 laboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/wellington-grand-villas/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-954-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20280131
DTEND;VALUE=DATE:20280201
SUMMARY:Wellington Grand Villas: Handover or completion\, promised for Janu
 ary 2028
DESCRIPTION:Date published by the developer: January 2028.\nSource: https:/
 /dubairealestateiq.com/project/wellington-grand-villas (read on 23 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/wellington-gra
 nd-villas/#delivery\nThis is the developer's date\, not a confirmation by 
 Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/wellington-grand-villas/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
