BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Villa Del Gavi Residences: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/villa-d
 el-gavi-residences/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-868-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250930
DTEND;VALUE=DATE:20251001
SUMMARY:Villa Del Gavi Residences: Construction start\, promised for Septem
 ber 2025
DESCRIPTION:Date published by the developer: September 2025.\nSource: https
 ://dubairealestateiq.com/project/villa-del-gavi-residences (read on 23 Nov
  2026).\nRecord with all sources: https://kolaboro.com/projects/villa-del-
 gavi-residences/#delivery\nThis is the developer's date\, not a confirmati
 on by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/villa-del-gavi-residences/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-868-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:Villa Del Gavi Residences: Handover or completion\, promised for De
 cember 2027
DESCRIPTION:Date published by the developer: December 2027.\nSource: https:
 //dubairealestateiq.com/project/villa-del-gavi-residences (read on 23 Nov 
 2026).\nRecord with all sources: https://kolaboro.com/projects/villa-del-g
 avi-residences/#delivery\nThis is the developer's date\, not a confirmatio
 n by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/villa-del-gavi-residences/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
