BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Verde by Sobha: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/verde-b
 y-sobha/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-423-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20230430
DTEND;VALUE=DATE:20230501
SUMMARY:Verde by Sobha: Construction start\, promised for April 2023
DESCRIPTION:Date published by the developer: April 2023.\nSource: https://d
 ubairealestateiq.com/project/verde-by-sobha (read on 18 Nov 2026).\nRecord
  with all sources: https://kolaboro.com/projects/verde-by-sobha/#delivery\
 nThis is the developer's date\, not a confirmation by Kolaboro. A period i
 s placed on its last day.
URL:https://kolaboro.com/projects/verde-by-sobha/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-423-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:Verde by Sobha: Handover or completion\, promised for June 2027
DESCRIPTION:Date published by the developer: June 2027.\nSource: https://du
 bairealestateiq.com/project/verde-by-sobha (read on 18 Nov 2026).\nRecord 
 with all sources: https://kolaboro.com/projects/verde-by-sobha/#delivery\n
 This is the developer's date\, not a confirmation by Kolaboro. A period is
  placed on its last day.
URL:https://kolaboro.com/projects/verde-by-sobha/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
