BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Tresora by Wadan: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/tresora
 -by-wadan/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-572-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:Tresora by Wadan: Construction start\, promised for March 2026
DESCRIPTION:Date published by the developer: March 2026.\nSource: https://d
 ubairealestateiq.com/project/tresora-by-wadan (read on 21 Nov 2026).\nReco
 rd with all sources: https://kolaboro.com/projects/tresora-by-wadan/#deliv
 ery\nThis is the developer's date\, not a confirmation by Kolaboro. A peri
 od is placed on its last day.
URL:https://kolaboro.com/projects/tresora-by-wadan/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-572-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20280331
DTEND;VALUE=DATE:20280401
SUMMARY:Tresora by Wadan: Handover or completion\, promised for March 2028
DESCRIPTION:Date published by the developer: March 2028.\nSource: https://d
 ubairealestateiq.com/project/tresora-by-wadan (read on 21 Nov 2026).\nReco
 rd with all sources: https://kolaboro.com/projects/tresora-by-wadan/#deliv
 ery\nThis is the developer's date\, not a confirmation by Kolaboro. A peri
 od is placed on its last day.
URL:https://kolaboro.com/projects/tresora-by-wadan/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
