BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Timber Terrace: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/timber-
 terrace/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-813-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20251231
DTEND;VALUE=DATE:20260101
SUMMARY:Timber Terrace: Construction start\, promised for December 2025
DESCRIPTION:Date published by the developer: December 2025.\nSource: https:
 //dubairealestateiq.com/project/timber-terrace (read on 23 Nov 2026).\nRec
 ord with all sources: https://kolaboro.com/projects/timber-terrace/#delive
 ry\nThis is the developer's date\, not a confirmation by Kolaboro. A perio
 d is placed on its last day.
URL:https://kolaboro.com/projects/timber-terrace/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-813-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270731
DTEND;VALUE=DATE:20270801
SUMMARY:Timber Terrace: Handover or completion\, promised for July 2027
DESCRIPTION:Date published by the developer: July 2027.\nSource: https://du
 bairealestateiq.com/project/timber-terrace (read on 23 Nov 2026).\nRecord 
 with all sources: https://kolaboro.com/projects/timber-terrace/#delivery\n
 This is the developer's date\, not a confirmation by Kolaboro. A period is
  placed on its last day.
URL:https://kolaboro.com/projects/timber-terrace/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
