BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:The Collection by Naser: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/the-col
 lection-by-naser/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-944-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250601
SUMMARY:The Collection by Naser: Construction start\, promised for May 2025
DESCRIPTION:Date published by the developer: May 2025.\nSource: https://dub
 airealestateiq.com/project/the-collection-by-naser (read on 23 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/the-collection-by-
 naser/#delivery\nThis is the developer's date\, not a confirmation by Kola
 boro. A period is placed on its last day.
URL:https://kolaboro.com/projects/the-collection-by-naser/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-944-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:The Collection by Naser: Handover or completion\, promised for June
  2027
DESCRIPTION:Date published by the developer: June 2027.\nSource: https://du
 bairealestateiq.com/project/the-collection-by-naser (read on 23 Nov 2026).
 \nRecord with all sources: https://kolaboro.com/projects/the-collection-by
 -naser/#delivery\nThis is the developer's date\, not a confirmation by Kol
 aboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/the-collection-by-naser/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
