BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:The Bristol Emaar Beachfront: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/the-bri
 stol-emaar-beachfront/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-298-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250601
SUMMARY:The Bristol Emaar Beachfront: Construction start\, promised for May
  2025
DESCRIPTION:Date published by the developer: May 2025.\nSource: https://dub
 airealestateiq.com/project/the-bristol-emaar-beachfront (read on 18 Nov 20
 26).\nRecord with all sources: https://kolaboro.com/projects/the-bristol-e
 maar-beachfront/#delivery\nThis is the developer's date\, not a confirmati
 on by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/the-bristol-emaar-beachfront/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-298-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20290930
DTEND;VALUE=DATE:20291001
SUMMARY:The Bristol Emaar Beachfront: Handover or completion\, promised for
  September 2029
DESCRIPTION:Date published by the developer: September 2029.\nSource: https
 ://dubairealestateiq.com/project/the-bristol-emaar-beachfront (read on 18 
 Nov 2026).\nRecord with all sources: https://kolaboro.com/projects/the-bri
 stol-emaar-beachfront/#delivery\nThis is the developer's date\, not a conf
 irmation by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/the-bristol-emaar-beachfront/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
