BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:The Boulevard by Prestige One: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/the-bou
 levard-by-prestige-one/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-733-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250731
DTEND;VALUE=DATE:20250801
SUMMARY:The Boulevard by Prestige One: Construction start\, promised for Ju
 ly 2025
DESCRIPTION:Date published by the developer: July 2025.\nSource: https://du
 bairealestateiq.com/project/the-boulevard-by-prestige-one (read on 23 Nov 
 2026).\nRecord with all sources: https://kolaboro.com/projects/the-bouleva
 rd-by-prestige-one/#delivery\nThis is the developer's date\, not a confirm
 ation by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/the-boulevard-by-prestige-one/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-733-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20271130
DTEND;VALUE=DATE:20271201
SUMMARY:The Boulevard by Prestige One: Handover or completion\, promised fo
 r November 2027
DESCRIPTION:Date published by the developer: November 2027.\nSource: https:
 //dubairealestateiq.com/project/the-boulevard-by-prestige-one (read on 23 
 Nov 2026).\nRecord with all sources: https://kolaboro.com/projects/the-bou
 levard-by-prestige-one/#delivery\nThis is the developer's date\, not a con
 firmation by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/the-boulevard-by-prestige-one/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
