BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Summit & Ridge at Sanctuary\, Wentworth Point: promised dates 
 (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/summit-
 ridge-at-sanctuary-wentworth-point/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:SYD-045-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20281231
DTEND;VALUE=DATE:20290101
SUMMARY:Summit & Ridge at Sanctuary\, Wentworth Point: Handover or completi
 on\, promised for 2028
DESCRIPTION:Date published by the developer: 2028.\nSource: https://www.apa
 rtments.com.au/new-apartments/summit-ridge-at-sanctuary-wentworth-point-14
 -16-hill-road-wentworth-point-nsw-2127 (read on 23 Nov 2026).\nRecord with
  all sources: https://kolaboro.com/projects/summit-ridge-at-sanctuary-went
 worth-point/#delivery\nThis is the developer's date\, not a confirmation b
 y Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/summit-ridge-at-sanctuary-wentworth-point
 /#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
