BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Seaside by Prestige One: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/seaside
 -by-prestige-one/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-896-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20240731
DTEND;VALUE=DATE:20240801
SUMMARY:Seaside by Prestige One: Construction start\, promised for July 202
 4
DESCRIPTION:Date published by the developer: July 2024.\nSource: https://du
 bairealestateiq.com/project/seaside-by-prestige-one (read on 23 Nov 2026).
 \nRecord with all sources: https://kolaboro.com/projects/seaside-by-presti
 ge-one/#delivery\nThis is the developer's date\, not a confirmation by Kol
 aboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/seaside-by-prestige-one/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-896-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Seaside by Prestige One: Handover or completion\, promised for Dece
 mber 2026
DESCRIPTION:Date published by the developer: December 2026.\nSource: https:
 //dubairealestateiq.com/project/seaside-by-prestige-one (read on 23 Nov 20
 26).\nRecord with all sources: https://kolaboro.com/projects/seaside-by-pr
 estige-one/#delivery\nThis is the developer's date\, not a confirmation by
  Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/seaside-by-prestige-one/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
