BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SAMANA Waves: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/samana-
 waves/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-225-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20220731
DTEND;VALUE=DATE:20220801
SUMMARY:SAMANA Waves: Construction start\, promised for July 2022
DESCRIPTION:Date published by the developer: July 2022.\nSource: https://ww
 w.samanadevelopers.com/projects/samana-waves (read on 17 Nov 2026).\nRecor
 d with all sources: https://kolaboro.com/projects/samana-waves/#delivery\n
 This is the developer's date\, not a confirmation by Kolaboro. A period is
  placed on its last day.
URL:https://kolaboro.com/projects/samana-waves/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-225-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:SAMANA Waves: Handover or completion\, promised for Q1 2027
DESCRIPTION:Date published by the developer: Q1 2027.\nSource: https://www.
 samanadevelopers.com/projects/samana-waves (read on 17 Nov 2026).\nRecord 
 with all sources: https://kolaboro.com/projects/samana-waves/#delivery\nTh
 is is the developer's date\, not a confirmation by Kolaboro. A period is p
 laced on its last day.
URL:https://kolaboro.com/projects/samana-waves/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR