BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SAMANA Waves 2: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/samana-
 waves-2/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-226-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20230930
DTEND;VALUE=DATE:20231001
SUMMARY:SAMANA Waves 2: Construction start\, promised for September 2023
DESCRIPTION:Date published by the developer: September 2023.\nSource: https
 ://www.samanadevelopers.com/projects/samana-waves-2 (read on 17 Nov 2026).
 \nRecord with all sources: https://kolaboro.com/projects/samana-waves-2/#d
 elivery\nThis is the developer's date\, not a confirmation by Kolaboro. A 
 period is placed on its last day.
URL:https://kolaboro.com/projects/samana-waves-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-226-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:SAMANA Waves 2: Handover or completion\, promised for Q3 2027
DESCRIPTION:Date published by the developer: Q3 2027.\nSource: https://www.
 samanadevelopers.com/projects/samana-waves-2 (read on 17 Nov 2026).\nRecor
 d with all sources: https://kolaboro.com/projects/samana-waves-2/#delivery
 \nThis is the developer's date\, not a confirmation by Kolaboro. A period 
 is placed on its last day.
URL:https://kolaboro.com/projects/samana-waves-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
