BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SAMANA South Haven: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/samana-
 south-haven/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-223-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260630
DTEND;VALUE=DATE:20260701
SUMMARY:SAMANA South Haven: Construction start\, promised for June 2026
DESCRIPTION:Date published by the developer: June 2026.\nSource: https://ww
 w.samanadevelopers.com/projects/samana-south-haven (read on 17 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/samana-south-haven
 /#delivery\nThis is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-south-haven/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-223-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20290630
DTEND;VALUE=DATE:20290701
SUMMARY:SAMANA South Haven: Handover or completion\, promised for Q2 2029
DESCRIPTION:Date published by the developer: Q2 2029.\nSource: https://www.
 samanadevelopers.com/projects/samana-south-haven (read on 17 Nov 2026).\nR
 ecord with all sources: https://kolaboro.com/projects/samana-south-haven/#
 delivery\nThis is the developer's date\, not a confirmation by Kolaboro. A
  period is placed on its last day.
URL:https://kolaboro.com/projects/samana-south-haven/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
