BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SAMANA South Haven 2: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/samana-
 south-haven-2/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-224-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260831
DTEND;VALUE=DATE:20260901
SUMMARY:SAMANA South Haven 2: Construction start\, promised for August 2026
DESCRIPTION:Date published by the developer: August 2026.\nSource: https://
 www.samanadevelopers.com/projects/samana-south-haven-2 (read on 17 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/samana-south-h
 aven-2/#delivery\nThis is the developer's date\, not a confirmation by Kol
 aboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-south-haven-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-224-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20290630
DTEND;VALUE=DATE:20290701
SUMMARY:SAMANA South Haven 2: Handover or completion\, promised for June 20
 29
DESCRIPTION:Date published by the developer: June 2029.\nSource: https://ww
 w.samanadevelopers.com/projects/samana-south-haven-2 (read on 17 Nov 2026)
 .\nRecord with all sources: https://kolaboro.com/projects/samana-south-hav
 en-2/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-south-haven-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
