BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SAMANA Mykonos Signature: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/samana-
 mykonos-signature/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-218-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20231031
DTEND;VALUE=DATE:20231101
SUMMARY:SAMANA Mykonos Signature: Construction start\, promised for October
  2023
DESCRIPTION:Date published by the developer: October 2023.\nSource: https:/
 /www.samanadevelopers.com/projects/samana-mykonos-signature (read on 17 No
 v 2026).\nRecord with all sources: https://kolaboro.com/projects/samana-my
 konos-signature/#delivery\nThis is the developer's date\, not a confirmati
 on by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-mykonos-signature/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-218-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:SAMANA Mykonos Signature: Handover or completion\, promised for Q1 
 2027
DESCRIPTION:Date published by the developer: Q1 2027.\nSource: https://www.
 samanadevelopers.com/projects/samana-mykonos-signature (read on 17 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/samana-mykonos
 -signature/#delivery\nThis is the developer's date\, not a confirmation by
  Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-mykonos-signature/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
