BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Samana Hills South 2: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/samana-
 hills-south-2/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-395-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20250930
DTEND;VALUE=DATE:20251001
SUMMARY:Samana Hills South 2: Construction start\, promised for September 2
 025
DESCRIPTION:Date published by the developer: September 2025.\nSource: https
 ://dubairealestateiq.com/project/samana-hills-south-2 (read on 18 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/samana-hills-so
 uth-2/#delivery\nThis is the developer's date\, not a confirmation by Kola
 boro. A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-hills-south-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-395-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20280831
DTEND;VALUE=DATE:20280901
SUMMARY:Samana Hills South 2: Handover or completion\, promised for August 
 2028
DESCRIPTION:Date published by the developer: August 2028.\nSource: https://
 dubairealestateiq.com/project/samana-hills-south-2 (read on 18 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/samana-hills-south
 -2/#delivery\nThis is the developer's date\, not a confirmation by Kolabor
 o. A period is placed on its last day.
URL:https://kolaboro.com/projects/samana-hills-south-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR