BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Safa Two de GRISOGONO (Tower B): promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/safa-tw
 o-de-grisogono-tower-b/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-167-handover-1@kolaboro.com
DTSTAMP:20261113T000000Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:Safa Two de GRISOGONO (Tower B): Handover or completion\, promised 
 for Q2 2027
DESCRIPTION:Date published by the developer: Q2 2027.\nSource: https://www.
 damacproperties.com/en/projects/safa-two-de-grisogono-tower-b/ (read on 13
  Nov 2026).\nRecord with all sources: https://kolaboro.com/projects/safa-t
 wo-de-grisogono-tower-b/#delivery\nThis is the developer's date\, not a co
 nfirmation by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/safa-two-de-grisogono-tower-b/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
